Schedule E - Frequently Used Special Provisions.pdf
PDF 7 MB Posted
- Attached to
- FY25 As-Needed Freeway Sign Repair
- Solicitation number
- RFP-591-250000001909-2
- Issued by
- Wayne County, Michigan
About this file
This document is a Supplemental Specification from the Michigan Department of Transportation (MDOT) for Errata to the 2020 Standard Specifications, effective April 30, 2024. The document provides a comprehensive list of corrections, modifications, and updates to various sections of the standard construction specifications, covering a wide range of topics including materials, construction methods, measurement, and payment for different types of work.
The errata cover multiple technical areas such as abbreviations, material requirements, concrete specifications, aggregate standards, electrical work, sign supports, lighting, stormwater management, traffic control, and more. The changes range from minor wording adjustments to substantive modifications of technical requirements, referencing various ASTM and AASHTO standards. These updates are intended to clarify, refine, and improve the technical specifications used by contractors working on MDOT projects, ensuring more precise and up-to-date guidance for construction and infrastructure development.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Schedule H - PW Rates Wayne Co. N6.pdf | ||
| Schedule B - Pricing. Wayne Co Sign Repair.1909.xlsx | XLSX spreadsheet | |
| Schedule F - Traffic Signing Standard Plan.pdf | ||
| RFP.PMC.Sign Repair.Wayne Co. 1909.docx | DOCX document | |
| Scheudule D - Maintaining Traffic Typicals.pdf | ||
| Scheudule G - PW Announcement.pdf | ||
| RFP.PMC.Sign Repair.Wayne Co. 1909.updated.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .