Schedule B - Pricing - Tate Flooring.docx
DOCX document 37 KB Posted
- Attached to
- LSHC Floor Tile Repairs
- Solicitation number
- RFP 171 180000002010 1
- Issued by
- Michigan
About this file
This is a Schedule B Pricing form for Request for Proposal No. 18*2010 issued by the State of Michigan for the Lake Superior Hosting Center Tate Flooring Install project. The proposal requires contractors to furnish and install Tate Access Flooring with a bolted stringer understructure at three former UPS locations designated as Area A and Area B according to provided drawing layouts. The flooring panels specified are Con Core 1250 with 1/16" anti-static HPL covering to match existing installations. The scope of work includes both the supply of materials and labor services for installation, as well as removal of existing panels and understructure. Contractors must submit separate line-item pricing for the flooring materials and the installation and removal labor.
Price proposals must encompass all costs associated with the project, including one-time charges, setup fees, shipping and handling, per-piece pricing, and palletizing expenses. Contractors are encouraged to offer quick payment discount terms, with the proposal form requesting specification of the discount percentage and number of days for payment. By submission, contractors certify that prices were developed independently without consultation or agreement with other contractors. The form also requires contractors to provide warranty information and lead time details, though specific values and requirements are not detailed in this pricing schedule template.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Schedule A - Prof Services Tate Flooring.docx | DOCX document | |
| Proposal Instructions and Vendor Questions Worksheet - Tate Flooring.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enter company name here.
STATE OF MICHIGAN
Request For Proposal No. 18*2010 Lake Superior Hosting Center - Tate Flooring Install
SCHEDULE B
PRICING
1. Price proposals must include all costs, including but not limited to, any one-time or set-up charges, fees, and potential costs that Contractor may charge the State (e.g., shipping and handling, per piece pricing, and palletizing).
2. The Contractor is encouraged to offer quick payment terms. The number of days must not include processing time for payment to be received by the Contractor's financial institution.
Quick payment terms: ________ % discount off invoice if paid within ________ days after receipt of invoice.
3. By submitting its proposal, the Contractor certifies that the prices were arrived at independently, and without consultation, communication, or agreement with any other Contractor.
| Description |
| Price |
Price is to furnish Tate Access Flooring with a bolted stringer understructure at (3) former UPS locations, Area A, and Area B per our drawing layout, panels are Con Core 1250 with 1/16" anti static HPL covering to match existing.
Service - Labor for Installation of Tate Access Flooring and Removal of the existing panels and understructure.
| TOTAL PRICE |
| $ |
*Warranty Information* *Lead Time*
Version 1 Revised Date: 7/28/2017
File details come from the government source that posted it. Updated .