Schedule A - Prof Services Tate Flooring.docx

DOCX document 30 KB Posted

Attached to
LSHC Floor Tile Repairs
Solicitation number
RFP 171 180000002010 1
Issued by
Michigan

About this file

This is a Statement of Work schedule for a Request for Proposal (RFP) issued by the State of Michigan for flooring installation services at the Lake Superior Hosting Center (LSHC) located in Dimondale, Michigan. The project involves replacing Tate Access Flooring in five areas totaling approximately 856 square feet where devices have been removed from the raised floor area. The specific areas requiring replacement measure 4 feet by 26 feet, 4 feet by 8 feet (two sections), 4 feet by 10 feet, and one large field of 800 square feet. The flooring specification is Tate Access Flooring with bolted stringer understructure, Con Core 1250 panels, and 1/16" anti-static HPL covering to match existing conditions; no alternate products are acceptable. Delivery and installation are expected to occur seven to ten weeks after purchase order award. The contractor must submit a detailed project plan within 30 calendar days of the effective date, including an organizational chart and project breakdown with assigned personnel and required resources.

The State will authorize work through purchase order, and payment will be made via electronic funds transfer or manual check based on invoices that include date, purchase order number, quantity, activity description, unit price, shipping costs, and total price. Overtime, holiday pay, and travel expenses are not reimbursable. The contractor must provide a toll-free customer service number with availability from 8 a.m. to 5 p.m. EST and technical support for repairs and maintenance during the same hours. Work is to be performed during the State's normal hours of Monday through Friday, 7 a.m. to 6 p.m. EST, with possible night and weekend hours as project requirements dictate. If subcontractors are used, full disclosure including legal business name, address, telephone number, scope of services, and prior working relationships is required. Liquidated damages of $5,000 plus $100 per day apply for late or improper completion of contract activities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bidder must enter company name here

STATE OF MICHIGAN

Request For Proposal No. 18*2010 Lake Superior Hosting Center - Tate Flooring Install

SCHEDULE A

STATEMENT OF WORK

CONTRACT ACTIVITIES

This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP.

The Contractor must respond to each requirement or question, and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.

BACKGROUND/SCOPE/REQUIREMENTS

The State of Michigan has recently completed a construction project that removed a number of devices from the raised floor area of the Lake Superior Hosting Center (LSHC). LSHC is located in the Secretary of State Building, 7064 Crowner Drive, Dimondale, MI 48909. Tate Flooring was installed in previous projects and old flooring was left under the devices that are now removed. This project is to replace the old flooring that was under the devices and replace flooring in another area that is unsafe. The areas that need replacement are;

1. 4 feet X 26 feet

2. 4 feet X 8 feet

3. 4 feet X 8 feet

4. 4 feet X 10 feet

5. A large field of 800 square feet The flooring type is to be Tate Access Flooring with a bolted stringer understructure. Panels are to be Con Core 1250 with 1/16” anti-static HPL covering to match existing.

*No alternate product will be considered* Delivery and installation is expected 7 to 10 weeks after award of PO.

3.2. Customer Service Toll-Free Number

The Contractor must specify its toll-free number for the State to make contact with the Contractor Representative. The Contractor Representative must be available for calls during the hours of 8 am to 5 pm EST.

3.3. Technical Support, Repairs and Maintenance

The Contractor must specify its toll-free number for the State to make contact with the Contractor for technical support, repairs and maintenance. The Contractor must be available for calls and service during the hours of 8 am to 5 pm EST.

3.4. Work Hours

The Contractor must provide Contract Activities during the State’s normal working hours Monday – Friday, 7:00 a.m. to 6:00 p.m. EST, and possible night and weekend hours depending on the requirements of the project.

3.7. Disclosure of Subcontractors

If the Contractor intends to utilize subcontractors, the Contractor must disclose the following:

The legal business name; address; telephone number; a description of subcontractor’s organization and the services it will provide; and information concerning subcontractor’s ability to provide the Contract Activities.

The relationship of the subcontractor to the Contractor.

Whether the Contractor has a previous working experience with the subcontractor. If yes, provide the details of that previous relationship.

A complete description of the Contract Activities that will be performed or provided by the subcontractor.

4.1. Project Plan

Identify the project plan and how it will be managed, or ask Contractor to propose a project plan. Project plan should identify items such as the required contact personnel; the date the project plan must be submitted to the State; project management process; project breakdown identifying sub-projects, tasks, and resources required; expected frequency and mechanisms for updates/progress reviews; process for addressing issues/changes; and individuals responsible for receiving/reacting to the requested information.

The Contractor will carry out this project under the direction and control of the Program Manager. Within 30 calendar days of the Effective Date, the Contractor must submit a project plan to the Program Manager for final approval. The plan must include: (a) the Contractor's organizational chart with names and title of personnel assigned to the project, which must align with the staffing stated in accepted proposals; and (b) the project breakdown showing sub-projects, tasks, and resources required.

5. Ordering

5.1. Authorizing Document

The appropriate authorizing document for the Contract will be a purchase order.

6. Invoice and Payment

6.1. Invoice Requirements

All invoices submitted to the State must include: (a) date; (b) purchase order; (c) quantity; (d) description of the Contract Activities; (e) unit price; (f) shipping cost (if any); and (g) total price. Overtime, holiday pay, and travel expenses will not be paid.

6.2. Payment Methods

The State will make payment for Contract Activities via eft or manual check.

7. Liquidated Damages Late or improper completion of the Contract Activities will cause loss and damage to the State and it would be impracticable and extremely difficult to fix the actual damage sustained by the State. Therefore, if there is late or improper completion of the Contract Activities the State is entitled to collect liquidated damages in the amount of $5,000 and an additional $100 per day for each day Contractor fails to remedy the late or improper completion of the Work.

Version 1 Revised Date: 7/28/2017

File details come from the government source that posted it. Updated .