schedule_b_pricing.docx
DOCX document 63 KB Posted
- Solicitation number
- RFP - 591 - 220000002464
- Issued by
- Luce County, Michigan
About this file
This document is a pricing schedule for a Request for Proposal (RFP) related to the installation of a Guardrail Garden for guardrail training in St. Ignace, Michigan, for the state of Michigan. The requested services include the provision of various guardrail approach terminals, guardrail types, and guardrail reflectors, with detailed quantities and unit costs provided. The total cost for the project is indicated.
The pricing schedule requires the contractor to provide all costs associated with the contract activities, including one-time or set-up charges, fees, and potential costs such as shipping and handling. The contractor must also certify that the prices were arrived at independently, without consultation with other contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| proposal-instructions-confidential-treatment-vendor-questions-worksheet-pass-fail-low-bid.docx | DOCX document | |
| Attachment B - Standard Plans.pdf.crdownload | CRDOWNLOAD file | |
| Attachment A - Location and Layout.pdf | ||
| standard_contract_terms (1).docx | DOCX document | |
| schedule_a_commodities_and_non-prof_services-outline_format.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Michigan.gov/MiProcurement
Enter company name here
SCHEDULE B - PRICING
Request For Proposal No. 2200002464
GUARDRAIL GARDEN FOR ST IGNACE GARAGE
ST IGNACE, MI, 49781
1. The Contractor must provide a pricing schedule for the proposed Contract Activities. The pricing schedule should be submitted in a modifiable format (e.g. Microsoft Word or Excel); however, you may also submit an additional pricing schedule in a non-modifiable format (e.g., PDF). Failure to complete the pricing schedule as requested may result in disqualification of your proposal.
2. Price proposals must include all costs, including but not limited to, any one-time or set-up charges, fees, and potential costs that Contractor may charge the State (e.g., shipping and handling, per piece pricing, and palletizing).
3. By submitting its proposal, the Contractor certifies that the prices were arrived at independently, and without consultation, communication, or agreement with any other Contractor.
| Pay Item Description |
| Quantity |
| Unit |
| Unit Cost |
| Total |
| Mobilization, Max |
| 1 |
| LSUM |
| Guardrail Approach Terminal, Type 1B |
| 2 |
| Ea |
| Guardrail Approach Terminal, Type 2B |
| 1 |
| Ea |
| Guardrail Approach Terminal, Type 2M |
| 2 |
| Ea |
| Guardrail Approach Terminal, Type 3B |
| 1 |
| Ea |
| Guardrail Departing Terminal, Type B |
| 1 |
| Ea |
| Guardrail, Type B |
| 50 |
| Ft |
| Guardrail, Type T |
| 13 |
| Ft |
| Guardrail, Type MGS-8 |
| 63 |
| Ft |
| Guardrail Curved, Type B |
| 25 |
| Ft |
| Guardrail Reflector |
| 16 |
| Ea |
TOTAL =
Version 2022-1 Page 2 of 2
Version 2022-2 Page 1 of 2 image1.png
File details come from the government source that posted it. Updated .