Attachment A - Location and Layout.pdf

PDF 373 KB Posted

Attached to
Installation of Guardrail Garden for guardrail training
Solicitation number
RFP - 591 - 220000002464
Issued by
Luce County, Michigan

About this file

This document is an attachment related to a state and local contract opportunity from the Michigan Department of Transportation (MDOT) for the installation of a guardrail training garden at the St. Ignace Maintenance Facility in Mackinac County. The project consists of installing seven new runs of guardrail, including various types of guardrail and terminals as specified. Estimated quantities are provided, but the contractor is responsible for verifying the items and quantities needed to complete the work as described. The project must be completed according to MDOT's 2020 Standard Specifications for Construction, and the contractor must coordinate their operations with the St. Ignace Maintenance Facility prior to starting work.

The contract will be paid for as a single lump sum, and no additional payment will be made for increases in quantities or additional items necessary to perform the work as outlined. The contractor is responsible for contacting MISS DIG System, Inc. prior to excavation and maintaining access to any recreational sites in the area. The improvements must be constructed in accordance with the standard plans referenced in the document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MICHIGAN DEPARTMENT OF TRANSPORTATION

YEAR DESIGN POSTED

ROAD

SPEED DATA

GUARDRAIL GARDEN CONSTRUCTION

CONTRACT FOR:

TRAFFIC DATA

LIMITS ADT DHV COMM

MACKINAC COUNTY

CITY OF ST IGNACE

US-2

19.

MILES:

MICHIGAN GEOGRAPHIC FRAMEWORK VERSION #

CONSTRUCTION. PHYSICAL ROAD NUMBER (PR#) & MILEPOST (MP) DATA ARE FROM

THE MICHIGAN DEPARTMENT OF TRANSPORTATION 2012 STANDARD SPECIFICATIONS FOR

THE IMPROVEMENTS COVERED BY THESE PLANS SHALL BE DONE IN ACCORDANCE WITH

TSC:

DATE:

DESIGN UNIT:

DRAWING SHEET

5/12/22

GARDNER

NEWBERRY

TITLE SHEET

SECT 1

PAUL C. AJEGBA, P.E. - DIRECTOR

Michigan Department of Transportation

COUNTY KEY

COUNTY

MACKINAC

JOB NO. CONTROL SEC SECTION FED AID PROJ

49000

YES

3 2

BAY

WEST MORAN

T40N

R4W

CHEESEMAN RD

BAYSHORE RD

ST IGNACE

MAINTENANCE FACILITY

MDOT - ST IGNACE

PROJECT LOCATION

N

LOG OF PROJECT

PROJECT LOCATION

The project is located at the St Ignace Maintenance Facility at 500 Ferry Lane, St Ignace, MI 49781, Mackinac County.

PROJECT DESCRIPTION

This project consists of installation of seven new runs of guardrail for a guardrail garden training facility at the St Ignace Maintenance Facility as shown in the layout sketches and described below. Transition panels shall be installed as described below in accordance with special detail R-60-J.

Guardrail Run #1

Install 3B approach terminal (FLEAT-MT). No additional guardrail items with this run.

Guardrail Run #2

Install one panel (12.5’) of Type B guardrail, and two curved panels (25.0’) of Type B guardrail. The curved beam panels shall be shop bent to a radius of 16.0’. Install a Type B departing terminal within the last curved panel of the guardrail.

Guardrail Run #3

Install one panel (12.5’) of Type B guardrail, transition to MGS-8 segment (34’ 4 ½”), and 2M approach terminal (SOFT-STOP).

Guardrail Run #4

Install one panel (12.5’) of Type T guardrail, transition to MGS-8 segment (28’ 1 ½”), and 2M approach terminal (MKST).

Guardrail Run #5

Install 2B approach terminal (SKT)

Guardrail Run #6

Install one panel (12.5’) of Type B guardrail and 1B approach terminal (FLEAT)

Guardrail Run #7

Install one panel (12.5’) of Type B guardrail and 1B approach terminal (SRT)

LOG OF PROJECT

Site preparation and aggregate surface will be completed by others and not included in this project. Exact layout and staking will be as directed by the Engineer.

All work on this project shall be according to the 2020 Standard Specifications for Construction and according to the typicals in this log.

Estimated Mainline Quantities for Information Only

Mobilization, Max 1 LSUM

Guardrail Approach Terminal, Type 1B 2 Ea

Guardrail Approach Terminal, Type 2B 1 Ea

Guardrail Approach Terminal, Type 2M 2 Ea

Guardrail Approach Terminal, Type 3B 1 Ea

Guardrail Departing Terminal, Type B 1 Ea

Guardrail, Type B 50 Ft

Guardrail, Type T 13 Ft

Guardrail, Type MGS-8 63 Ft

Guardrail Curved, Type B 25 Ft

Guardrail Reflector 16 Ea

PROJECT COORDINATION

Traffic control for protection of equipment and personnel within the garage is the responsibility of the

Contractor. The Contractor shall coordinate their operations with the St Ignace Maintenance Facility to ensure schedule and accessibility prior to starting work.

The Contractor shall notify the following a minimum of 7 calendar days prior to starting work:

Nick LaChapelle

(906) 630-5600

MEASUREMENT AND PAYMENT

All completed work will be paid for as one lump sum. Estimated quantities to complete the work are included in the bid proposal for information only. The contractor is responsible for verifying these items and quantities. No additional payment will be paid for increases in quantities or additional items necessary to perform the work as described in the log of project.

GENERAL PLAN NOTES

GENERAL

Mile points are only approximate and exact locations of the work shall be designated by the

Engineer prior to Construction.

UNDERGROUND UTILITIES

For the protection of underground utilities and in conformance with MCL 460.171 et seq, the

Contractor shall contact MISS DIG System, Inc. by phone at 811 or 800-482-7171 or via the web at either elocate.missdig.org for single address or rte.missdig.org, a minimum of 3 work days prior to excavating, excluding weekends and holidays.

VEHICLES AND MATERIAL STORAGE

The Contractor shall not park any vehicles nor store any equipment on any Public Recreational

Property. Access to Recreational Sites must be maintained at all times.

SPECIFICATIONS FOR CONSTRUCTION

The improvements covered by these plans shall be done in accordance with the MDOT 2020

Standard Specifications for Construction.

NOTES APPLYING TO STANDARD PLANS

Where the following items are called for on plans, they are to be

Constructed according to the standard plan given below opposite each item unless otherwise indicated.

Title Plan No.

ROAD

GUARDRAIL TYPES A, B, BD, T, TD, MGS-8, & MGS-8D R-60-J

GUARDRAIL APPROACH TERMINAL TYPE 1B R-61-H

GUARDRAIL APPROACH TERMINAL TYPE 2B R-62-G

GUARDRAIL APPROACH TERMINAL TYPE 2M R-62-H

GUARDRAIL APPROACH TERMINAL TYPE 3B R-63-C

GUARDRAIL DEPARTING TERMINAL TYPES B, T, & MGS R-66-E

*Denotes Special Detail

CS:

JN:

DRAWING SHEET

SECT 1

TSC: DATE:DESIGN UNIT: 5/27/22 GARDNER NEWBERRY

FILE:

GUARDRAIL GARDEN LAYOUT

ST IGNACE GARAGE

Michigan Department of Transportation 0 30

HORZ. (FT)

N

12'

12' 12' 12'

20'

30'

16' R

R

125'

G R

A H

A M

V

E

G R

A H

M

V

E

EX FENCE

EX FENCE

EXISTING AGGREGATE PAD

(7) TYPE B (SRT)

(6) TYPE B (FLEAT)

(5) (SKT)

(4) TYPE T TRANSITION TO MGS-8 (MKST)

(3) TYPE B TRANSITION TO MGS-8 (SOFT STOP)

(2) TYPE B TO CURVED (DEPARTING TERMINAL)

(1) (FLEAT-MT)

RUN ID KEY