schedule_b_pricing (003).docx
DOCX document 62 KB Posted
- Attached to
- Shoulder Aggregate - St. Ignace
- Solicitation number
- RFP 591 210000002096 1
- Issued by
- Lake County, Michigan
About this file
This is a Schedule B Pricing document from the State of Michigan Department of Transportation (MDOT) for Request for Proposal No. 210000002096 regarding aggregate material procurement and delivery. The solicitation seeks pricing for 23A Aggregate with a maximum quantity of 5,500 tons to be delivered to the St. Ignace maintenance facility located at 500 Ferry Ln, St. Ignace, MI 49781. Contractors must provide separate pricing for material procurement and delivery fees on a per-ton basis. MDOT has indicated a preference for state forces to pick up material directly from pits in close proximity to the project location rather than contractor-provided delivery, though delivery fee proposals will be evaluated when comparing costs to MDOT self-pickup options.
Pricing proposals must include all associated costs such as one-time charges, setup fees, shipping, handling, per-piece pricing, and palletizing in the submitted pricing schedule. Contractors are required to submit pricing in the specified format (Microsoft Word or Excel) with the option to provide an additional non-modifiable format (PDF); failure to complete the pricing schedule as requested may result in proposal disqualification. By submitting a proposal, contractors certify that pricing was developed independently without consultation or agreement with other contractors. The document requires two cost scenarios: total cost for 5,500 tons with delivery included and total cost for 5,500 tons with MDOT providing pickup.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| proposal-instructions-confidential-treatment-vendor-questions-worksheet.docx | DOCX document | |
| schedule_a_commodities_and_non-prof_services-outline_format (006).docx | DOCX document | |
| standard_contract_terms.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Michigan.gov/MiProcurement
DOCUMENT TITLE Michigan.gov/MiProcurement Enter company name here
SCHEDULE B PRICING
Request for Proposal No. 210000002096 Aggregate
1. Pricing shall be provided for material procurement and delivery separate as follows:
a. Aggregate, 23A price per Ton up to a max 5,500 Ton
b. Delivery fee per Ton to the St Ignace maintenance facility at 500 Ferry Ln, St Ignace, MI 49781
· Please Note: MDOT would prefer to pick up material with state forces and not have delivery completed. If a Pit is in close proximity to the project location, this is the preferred method. Delivery fees will be considered when evaluating this bid, while comparing MDOT costs to picking up material
2. The pricing schedule should be submitted in format below (e.g. Microsoft Word or Excel); however, you may also submit an additional pricing schedule in a non-modifiable format (e.g., PDF). Failure to complete the pricing schedule as requested may result in disqualification of your proposal.
3. Price proposals must include all costs, including but not limited to, any one-time or set-up charges, fees, and potential costs that Contractor may charge the State (e.g., shipping and handling, per piece pricing, and palletizing).
4. By submitting its proposal, the Contractor certifies that the prices were arrived at independently, and without consultation, communication, or agreement with any other Contractor.
| 23A Aggregate Price Per Ton |
| 23A Aggregate |
5,500 Ton Total Price
| 5,500 Ton 23A Aggregate Delivery Fee (delivery location listed above) |
| Total Cost (5,500 Ton) with Delivery included |
| Total Cost (5,500 Ton) with MDOT picking up material |