Schedule B.xls

XLS spreadsheet 45 KB Posted

Attached to
CGC Sea Dog Dockside Repairs FY22
Solicitation number
70Z08022QPBPL5296_SEADOG
Issued by

About this file

This pricing schedule document outlines costs for repair and maintenance work on the USCGC Sea Dog for fiscal year 2022. Definite line items include cleaning and inspecting grey water and sewage holding tanks and piping, preserving critical coated surfaces, renewing interior deck covering systems and joiner decks, replacing ship service diesel generator sets, and upgrading the 24VDC distribution system. An optional GFP report and travel and per diem costs are also included. Labor rates by trade and location are provided, along with assumptions for G&A and profit factors to calculate loaded rates. The related solicitation seeks bids for the dockside repairs to the CGC Sea Dog described in the pricing schedule, to be awarded by the U.S. Coast Guard in fiscal year 2022.

View the file

Other files

File Type Posted
Amendment 00001(04-25-22).pdf PDF
70Z08022QPBPL5296_ Sea Dog Solicitation.pdf PDF
Specification_Sea Dog.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC SEA DOG (WPB-87) DOCKSIDE AVAILABILITY FY2022
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Grey Water Holding Tanks, Clean and InspectJOB1$0.00
D-002Sewage Holding Tanks, Clean and InspectJOB1$0.00
D-003Grey Water Piping, Clean and FlushJOB1$0.00
D-004Sewage Piping, Clean and FlushJOB1$0.00
D-005Critical Coated Surface(s), Preserve, PartialJOB1$0.00
D-006Interior Deck Covering System And Jointer Deck, RenewJOB1$0.00
D-007Insulation, RenewJOB1$0.00
D-008Ship Service Diesel Generator Sets (SSDG’s), ReplaceJOB1$0.00
D-00924VDC Distribution System, UpgradeJOB1$0.00
O-00AComposite Labor RateHour230
D-00BGFP ReportNSPEANSP
D-00CTravel and Perdiem$0.00JOB1$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(2/8/2022) Draft-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .