Schedule A Attachments.M-32 Signal Work.pdf
PDF 4 MB Posted
- Solicitation number
- RFP - 591 - 220000002934
- Issued by
- Otsego County, Michigan
About this file
The document is a set of special details related to a traffic signal improvement project in Otsego County, Michigan. The project involves the removal and replacement of traffic signals and related equipment at the intersection of M-32 (Main Street) and Murner Road/McVannel Drive in Livingston Township. Key items of work include the removal of existing traffic signal equipment and the installation of new traffic signals, strain poles, foundations, wiring, detection systems, and other related items. The project also includes temporary traffic control measures during construction. The document provides detailed specifications and drawings for the various components of the traffic signal infrastructure.
The pricing for this project will be based on unit prices for the various pay items, with a total bid amount. There is no indication of any set-asides or incumbent contractors. The project is being funded by the Michigan Department of Transportation, but the specific funding sources are not provided. The contract duration is not explicitly stated, but typical traffic signal projects of this nature have a completion timeframe of 3-6 months.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| schedule_b_pricing.M-32 Signal Work.docx | DOCX document | |
| schedule_a_commodities_and_non-prof_services-outline_format.M-32 Signal Work 08182022.docx | DOCX document | |
| standard_contract_terms_PMC M-32 Signal Work.docx | DOCX document | |
| proposal-instProposal Instructions M-32 Signal Work 08182022.docx.crdownload | CRDOWNLOAD file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ONLY
N
EX. ROW
EX. ROW
EX. ROW
EX. ROW
E X
R O
W
E X
R O
W
E X
R O
W
E X
R O
W
STEADY
FLASHING
START CROSSING
Watch For Vehicles
DON'T START
Finish Crossing If Started
DON'T CROSS
TO CROSS
PUSH BUTTON
STEADY
FLASHING
START CROSSING
Watch For Vehicles
DON'T START
Finish Crossing If Started
DON'T CROSS
TO CROSS
PUSH BUTTON
STEADY
FLASHING
START CROSSING
Watch For Vehicles
DON'T START
Finish Crossing If Started
DON'T CROSS
TO CROSS
PUSH BUTTON
STEADY
FLASHING
START CROSSING
Watch For Vehicles
DON'T START
Finish Crossing If Started
DON'T CROSS
TO CROSS
PUSH BUTTON
CAUTION - CRITICAL
UNDERGROUND UTILITY
HAZARDOUS OR
FLAMMABLE MATERIAL
WATERMAIN
CAUTION
WATERMAIN
CAUTION
HAZARDOUS OR
FLAMMABLE MATERIAL
HAZARDOUS OR
FLAMMABLE MATERIAL
103' (EX. ROW)
(E
X
R O
W
(E
X
R O
W
66' (EX. ROW)
HAZARDOUS OR
FLAMMABLE MATERIAL CAUTION - CRITICAL
UNDERGROUND UTILITY
SA
T
G
T
W
W
G
T
CS:
JN:
TSC:
DATE:
DESIGN UNIT:
DRAWING SHEET
69021
213873 EPE
TWA#18157
6/23/22
STEADY WATTS:
PLAN:
0 30'
HORZ. (FT)
SIGNAL
GAYLORD
M-32 (MAIN ST) @ MURNER RD/MCVANNEL DR
LIVINGSTON TOWNSHIP, OTSEGO COUNTY
TRAFFIC SIGNAL REMOVAL SHEET
OPENINGS:
CYCLIC WATTS:
69021-01-002
EX SIGNALS
Michigan Department of Transportation
SECT
DESCRIPTIONAUTH
DATE NO. DATENO.
FINAL ROW PLAN REVISIONS (SUBMITTAL DATE: )
FILE:xxxxxx_6902101002_CON001.dgn
SAN
SAN
SAN
SAN
SAN
SAN
0.
0.
0.
0.
.5
0.
.4
.7
HH
HH
PS#2
PS#3
PS#4
PS#1
EAST (CS#4)
NORTH (CS#3)
WEST (CS#2)
SOUTH (CS#1)
FACING:
EX. 40' WOOD POLE
EX. 55' WOOD POLE
HH, ROUND, 3' DIA.
= 55 MPH)
(SPEED LIMIT
MURNER ROAD
= 25 MPH)
(SPEED LIMIT
McVANNEL DRIVE
WIRELESS VEHICLE DETECTION SYSTEM
WIRELESS INTERCONNECT SYSTEM (REMOTE)
CONTROLLER FDN, BASE MOUNT
& 16 LOAD SWITCH BAY BASE MOUNTED CABINET
DIGITAL TYPE ACTUATED CONTROLLER (MOD 50)
(CROSSING M-32; FACING EAST)
PUSHBUTTON & R10-3b(L) SIGN
PEDESTAL, FDN
PUSHBUTTON PEDESTAL, ALUM
POCH=27'-8" (SPAN #4)
POCH=23'-1" (SPAN #3)
CASING (13')
STRAIN POLE FDN, 6 BOLT (42"Ø, 16.5')
STRAIN POLE, 30', STEEL, 6 BOLT
(CROSSING M-32; FACING EAST)
PUSHBUTTON & R10-3b(R) SIGN
PEDESTAL, FDN
PEDESTAL, ALUM
= 40 MPH)
(SPEED LIMIT
M-32 (MAIN ST.)
= 55 MPH)
(SPEED LIMIT
M-32 (MAIN ST.)
9'2' 10'
VAR.
VAR.12'VAR.
32'9'
21'
VAR.
VAR.
11' VAR.
9'
9' 2'
20'
14' 11'
REMOVE HH & CONDUIT
29'
9'
12'
49'
34'
12'
11'
65'
21'
11'
10'
43'
40'
12'
9'
17'
SENSOR NODE (TYP.)
WIRELESS VEHICLE
(CROSSING M-32; FACING WEST)
PUSHBUTTON & R10-3b(R) SIGN
POCH=24'-5" (SPAN #2)
POCH=25'-5" (SPAN #1)
CASING (10')
STRAIN POLE FDN, 6 BOLT (42"Ø, 13.5')
STRAIN POLE, 30', STEEL, 6 BOLT
SERIAL PORT PROTOCAL (SPP) RADIO
EX YAGI ANTENNA (FACING EAST)
SERVICE DISCONNECT (NEMA 4X-STAINLESS STEEL)
EX ELECTRIC SERVICE (BY C.E. CO.)
POCH=26'-0" (SPAN #4)
POCH=25'-0" (SPAN #1)
CASING (12')
STRAIN POLE FDN, 6 BOLT (42"Ø, 15')
STRAIN POLE, 30', STEEL, 6 BOLT
NO. ITEM QUANTITIES
LIST OF MATERIAL
Fdn, Rem 1 Ea
Hh, Rem 1 Ea
Conduit, Rem 10 Ft
REGION ELECTRICIAN, (989) 370-1181
EQUIPMENT TO OWEN WERTH, MDOT NORTH
RETURN ALL REMOVED TRAFFIC SIGNAL
REMOVE SPAN#4
REMOVE SPAN#1
REMOVE SPAN#2
REMOVE SPAN#3
TS#3
REM
TS#4
REM
TS#5
REM
TS#6
REM
TS#7
REM
TS#8
REM
TS#1
REM
TS#2
REM
CS#1
REM
CS#2
REM
CS#3
REM
TS#4
REM
TS, Span Wire Mtd, Rem 8 Ea
Case Sign, Rem 4 Ea
Span Wire, Rem 4 Ea
Steel Pole, Rem 1 Ea 1
TS, Pedestrian, Bracket Arm Mtd, Rem 1 Ea
Pushbutton, Rem 1 Ea 8
POCH=25'-5" (SPAN #3)
POCH=24'-5" (SPAN #2)
(CROSSING M-32; FACING WEST)
REMOVE PUSHBUTTON & R10-3b(L) SIGN
REMOVE 2W LED CD PED SIGNAL
TO CASING (13'), MIN 2' BELOW GRADE
REMOVE FDN, 6 BOLT (42"Ø, 16.5'), DOWN 3.5'
REMOVE STRAIN POLE, 30', STEEL, 6 BOLT
R
Y
G
TS#7, TS#8
TS#5, TS#6,
TS#3, TS#4,
TS#1, TS#2,
LED TS
1W-3C-SA
REMOVE
LED CASE SIGN
24" X 30"
ONE-WAY
REMOVE
PhillipsK7 Text Box Schedule A - Attachment 1 Removal Items of Work
EX. ROW
EX. ROW
EX. ROW
EX. ROW
E X
R O
W
E X
R O
W
E X
R O
W
E X
R O
W
STEADY
FLASHING
START CROSSING
Watch For Vehicles
DON'T START
Finish Crossing If Started
DON'T CROSS
TO CROSS
PUSH BUTTON
STEADY
FLASHING
START CROSSING
Watch For Vehicles
DON'T START
Finish Crossing If Started
DON'T CROSS
TO CROSS
PUSH BUTTON
STEADY
FLASHING
START CROSSING
Watch For Vehicles
DON'T START
Finish Crossing If Started
DON'T CROSS
TO CROSS
PUSH BUTTON
STEADY
FLASHING
START CROSSING
Watch For Vehicles
DON'T START
Finish Crossing If Started
DON'T CROSS
TO CROSS
PUSH BUTTON
CAUTION - CRITICAL
UNDERGROUND UTILITY
HAZARDOUS OR
FLAMMABLE MATERIAL
WATERMAIN
CAUTION
WATERMAIN
CAUTION
HAZARDOUS OR
FLAMMABLE MATERIAL
HAZARDOUS OR
FLAMMABLE MATERIAL
103' (EX. ROW)
(E
X
R O
W
(E
X
R O
W
66' (EX. ROW)
HAZARDOUS OR
FLAMMABLE MATERIAL CAUTION - CRITICAL
UNDERGROUND UTILITY
SA
T
G
T
W
W
CS:
JN:
TSC:
DATE:
DESIGN UNIT:
DRAWING SHEET
69021
213873 EPE
TWA#18157
6/23/22
STEADY WATTS:
PLAN:
0 30'
HORZ. (FT)
SIGNAL
GAYLORD
M-32 (MAIN ST) @ MURNER RD/MCVANNEL DR
LIVINGSTON TOWNSHIP, OTSEGO COUNTY
TRAFFIC SIGNAL CONSTRUCTION SHEET
OPENINGS:
CYCLIC WATTS:
69021-01-002
SIGNALS
Michigan Department of Transportation
SECT
DATE NO. DATENO.
FINAL ROW PLAN REVISIONS (SUBMITTAL DATE: )
FILE:xxxxxx_6902101002_CON001.dgn
TS
SAN
SAN
SAN
SAN
SAN
SAN
0.
0.
0.
0.
.5
0.
.4
.7
HH
HH
PS#2
PS#3
PS#4
PS#1
EAST (CS#4)
NORTH (CS#3)
WEST (CS#2)
SOUTH (CS#1)
FACING:
EX. 40' WOOD POLE
EX. 55' WOOD POLE
HH, ROUND, 3' DIA.
= 55 MPH)
(SPEED LIMIT
MURNER ROAD
= 25 MPH)
(SPEED LIMIT
McVANNEL DRIVE
WIRELESS VEHICLE DETECTION SYSTEM
WIRELESS INTERCONNECT SYSTEM (REMOTE)
CONTROLLER FDN, BASE MOUNT
& 16 LOAD SWITCH BAY BASE MOUNTED CABINET
DIGITAL TYPE ACTUATED CONTROLLER (MOD 50)
(CROSSING M-32; FACING EAST)
PUSHBUTTON & R10-3b(L) SIGN
PEDESTAL, FDN
PUSHBUTTON PEDESTAL, ALUM
POCH=28'-6" (SPAN #4)
POCH=23'-11" (SPAN #3)
CASING (13')
STRAIN POLE FDN, 6 BOLT (42"Ø, 16.5')
STRAIN POLE, 30', STEEL, 6 BOLT
(CROSSING M-32; FACING EAST)
PUSHBUTTON & R10-3b(R) SIGN
PEDESTAL, FDN
PEDESTAL, ALUM
= 40 MPH)
(SPEED LIMIT
M-32 (MAIN ST.)
= 55 MPH)
(SPEED LIMIT
M-32 (MAIN ST.)
9'2' 10'
VAR.
VAR.12'VAR.
32'9'
21'
VAR.
VAR.
11' VAR.
9'
9' 2'
20'
14' 10'
29'
9' 12'
49'
34'
12'
11'
65'
25'
11'
10'
43'
40'
12' 9'
17'
SENSOR NODE (TYP.)
WIRELESS VEHICLE
(CROSSING M-32; FACING WEST)
PUSHBUTTON & R10-3b(R) SIGN
POCH=25'-3" (SPAN #2)
POCH=26'-3" (SPAN #1)
CASING (10')
STRAIN POLE FDN, 6 BOLT (42"Ø, 13.5')
STRAIN POLE, 30', STEEL, 6 BOLT
SERIAL PORT PROTOCAL (SPP) RADIO
EX YAGI ANTENNA (FACING EAST)
SERVICE DISCONNECT (NEMA 4X-STAINLESS STEEL)
EX ELECTRIC SERVICE (BY C.E. CO.)
POCH=26'-10" (SPAN #4)
POCH=25'-10" (SPAN #1)
CASING (12')
STRAIN POLE FDN, 6 BOLT (42"Ø, 15')
STRAIN POLE, 30', STEEL, 6 BOLT
NO. ITEM QUANTITIES
LIST OF MATERIAL
Strain Pole Fdn, 6 Bolt 17 Ft
Casing 13 Ft
Conduit, DB, 1, 1 1/2 inch 10 Ft
TS, One Way Span Wire Mtd (LED) 8 Ea
Case Sign (LED), One Way, 24 inch by 30 inch 4 Ea
TS, Pedestrian, Two Way Bracket Arm Mtd, Salv 1 Ea
Strain Pole, Steel, 6 bolt, 30 foot 1 Ea 1
POLE
STEEL
HH
TYPICAL
POCH=26'-3" (SPAN #3)
POCH=25'-6" (SPAN #2)
CS#1
INSTALL
TS#1
INSTALL
TS#2
INSTALL
CS#2
INSTALL
TS#3
INSTALL
TS#4
INSTALL
CS#3
INSTALLTS#5
INSTALL
TS#6
INSTALL
TS#8
INSTALL
TS#7
INSTALL
TS#4
INSTALL
Pushbutton and Sign, Salv 1 Ea
Hh, Round 1 Ea
Span Wire 4 Ea
TS#7, TS#8
TS#5, TS#6,
TS#3, TS#4,
TS#1, TS#2,
BOX SPAN CALCULATIONS
NOT TO SCALE
17' 09' 12' 40'
1W-CS 1W-3C 1W-3C
1W-CS
1W-3C
1W-3C
1W-CS1W-3C1W-3C
1W-CS
1W-3C
1W-3C33"
24"
30"
31"
24" 31"
30"
24"
33"
30"24"32"
25'
11'
10'
43'
29' 09'12'
49'
34'
12'
11'
65'
SPAN #4 POCH: 28'-01"
SPAN #1 POCH: 26'-10"
SPAN #2 POCH: 26'-04"
SPAN #1 POCH: 26'-10"
SPAN #4 POCH: 28'-01"
SPAN #3 POCH: 25'-06"
SPAN #3 POCH:25'-06"
SPAN #2 POCH:26'-04"
SPAN #1
TENSION=1000
SPAN #2
TENSION=1000
SPAN #3
TENSION=1000
FIELD ADJUSTMENTS SHOULD BE MADE TO MAINTAIN MIN 17' BOTTOM HEIGHT.
NOTE: POCH AND STEM LENGTHS ARE SUGGESTIONS ONLY.
Backplate, TS 8 Ea 8
R
Y
G
LED CASE SIGN
24" X 30"
ONE-WAY
INSTALL
ONLY
W/ BACKPLATE
LED TS
1W-3C-SA
INSTALL
Span Wire Tether 4 Ea 9
W/ TOP TETHER
TENSION=1000
SPAN #4
W/ TOP TETHER
W/ TOP TETHER
W/ TOP TETHER
9 & TOP TETHER
INSTALL SPAN#1
& TOP TETHER
INSTALL SPAN#2
& TOP TETHER
INSTALL SPAN#3
(CROSSING M-32; FACING WEST)
SALVAGE PUSHBUTTON & R10-3b(L) SIGN
SALVAGE LED CD PED SIGNAL
INSTALL FDN, 6 BOLT (42"Ø, 16.5'), CASING (13')
INSTALL STRAIN POLE, 30', STEEL, 6 BOLT
& TOP TETHER
INSTALL SPAN#4
1-1•" DB CONDUIT
3-3" DB CONDUITS
Conduit, DB, 3, 3 inch 10 Ft
INSTALL HH & CONDUITS
PhillipsK7 Text Box Schedule A - Attachment 2 Construction Items of Work
NOT TO SCALE
FILE:
Michigan Department of Transportation
MAY 2021
A DOUBLE LANE SHIFT
ON A 7-LANE UNDIVIDED ROADWAY
1 BOUND AND CLTL CLOSURE WITH DATE:
SHEET:
NO:
100-GEN-KEY.dgn 3(1R+2L)LC-2(L)SHIFT
152-CLT(7)-
MAINTAINING TRAFFIC TYPICAL
FILE:
Michigan Department of Transportation
DECEMBER 2021
TYPICAL NUMBERING KEY
DATE:
100-GEN-KEY.dgn
MAINTAINING TRAFFIC TYPICAL
100-GEN-KEY
NO:
TYPICAL NUMBER KEY
CODES
ZIP = ZIPPER MERGE
TS = TEMPORARY SIGNAL
TR = TRAFFIC REGULATOR
STA = STOPPED TRAFFIC ADVISORY
SPEED = SPEED
SP = SPECIAL
SIGN = SIGN
SHL = SHOULDER CLOSURE
SD = SHORT DURATION
RUM = RUMBLE STRIP
ROLL = ROLLING ROADBLOCK
(R) = RIGHT
PCMS = PORTABLE CHANGEABLE MESSAGE SIGN
PARK = PARKING LANE
NFW = NON-FREEWAY
MID = MIDDLE OF INTERSECTION OR ROAD
OUT = OUTSIDE OF SHOULDER
O = OUTSIDE (LANE CLOSURE)
LO = LANE OPEN
LD = LONG DURATION
LC = LANE CLOSURE
(L) = LEFT
L = LANE
INT = INTERSECTION
IN = INSIDE
GORE = FREEWAY GORE AREA
GEN = GENERAL INFORMATION
FW = FREEWAY
ExR = EXIT RAMP
EnR = ENTRANCE RAMP
EM = EARLY MERGE
CruSha = CRUSH AND SHAPE
CROSS = CROSSOVER
CLT = CENTER LEFT TURN LANE
C = CLOSURE
AW = ADVANCE WARNING
AB = ARROW BOARD
2(L)SHIFT = 2 LANES SHIFTED TO THE LEFT.
3(1R+2L)LC = 3 LANES CLOSED, (1 RIGHT LANE AND 2 LEFT LANES).
CTL(7) = CENTER LEFT TURN LANE, 7 LANES TOTAL.
152 - TYPICAL NUMBER
CODE: 152-CTL(7)-3(1R+2L)LC-2(L)SHIFT
EXAMPLE TYPICAL
5000 - SURVEY
4000 - MAINTENANCE
360 - ROLLING ROADBLOCK
350 - GORE LOCATIONS
340 - MERGE SYSTEMS
320 - CRUSH AND SHAPE
310 - CROSSOVER CLOSURE
300 - ADVANCE WARNINGS
230 - FREEWAY EXIT RAMPS
220 - FREEWAY ENTRANCE RAMPS
210 - FREEWAY LANE SHIFTS
200 - FREEWAY CLOSURES
160 - SIGNAL WORK
150 - CLT 7 LANE SECTIONS
140 - PARKING LANES
130 - CENTER LEFT TURN (CLT) LANES
120 - NON-FREEWAY
110 - TRAFFIC REGULATORS
100 - GENERAL NOTES
PhillipsK7 Text Box Schedule A - Attachment 3 Maintaining Traffic Typicals (8 Pages)
Michigan Department of Transportation
MAY 2021
"B", "D" AND "L" TABLES
CHANNELIZING DEVICE SPACING,
SIGN BORDER KEY, AND ROLL-AHEAD SPACING
101-GEN-SPACING-CHARTS.dgn
SPACING-CHARTS
101-GEN-
NO:
DISTANCE BETWEEN TRAFFIC SIGNS, "D"
POSTED SPEED LIMIT, MPH (PRIOR TO WORK AREA)
D (FEET)
DISTANCES
"D"
B (FEET)
GUIDELINES FOR LENGTH OF LONGITUDINAL BUFFER SPACE, "B"
LENGTHS
"B"
30 35 40 45 50 55 60 65 70
25 30 35 40 45 50 55 60 65 70
250 300 350 400 450 500 550 600 650 700
SPEED, MPH (PRIOR TO WORK AREA)
132 181 230 279 329 411 476 542 625
OPERATING SPEED.
* POSTED SPEED, OFF-PEAK 85TH PERCENTILE SPEED PRIOR TO WORK STARTING, OR THE ANTICIPATED
POSTED SPEED LIMIT, MPH (PRIOR TO WORK AREA)
25 30 35 40 45 50 55 60 65 70
1 11
2 100 110 120 130 140
3 135 150 165 180 195 210
4 107 180 200 220 240 260 280
5 103 134 225 250 300 325 350
6 123 160 270 300 330 360 390 420
7 143 187 315 350 385 420 455 490
8 164 214 360 400 440 480 520 560
(FEET)
OFFSET
MINIMUM MERGING TAPER LENGTH, "L" (FEET)
9 184 240 405 450 495 540 585 630
10 205 267 450 500 550 600 650 700
11 225 294 495 550 605 660 715 770
12 180 245 320 540 600 660 720 780 840
13 266 347 585 650 715 780 845 910
14 286 374 630 700 770 840 910 980
15 307 400 675 750 825 900 975 1050
15 21 27 45 50 55 60 65 70 75
90544130
32 45 62 80
42 60 82
53 75 275
63 90
33 83
Michigan Department of Transportation
MAY 2021
"B", "D" AND "L" TABLES
CHANNELIZING DEVICE SPACING
SIGN BORDER KEY AND ROLL-AHEAD SPACING
SPACING-CHARTS
101-GEN-
NO:
SHOWN IN THE ABOVE TABLES ARE AS FOLLOWS:
MERGING TAPER IN DERIVING THE "L" VALUES
THE FORMULAS FOR THE MINIMUM LENGTH OF A
60 THE WORK AREA IS 40 MPH OR LESS
WHERE POSTED SPEED PRIOR TO "L" = W X S
THE WORK AREA IS 45 MPH OR GREATER
WHERE POSTED SPEED PRIOR TO "L" = W X S
W = WIDTH OF OFFSET
S = POSTED SPEED LIMIT IN MPH PRIOR TO WORK AREA
L = MINIMUM LENGTH OF MERGING TAPER
UPSTREAM TAPERS
DOWNSTREAM TAPERS
TAPER LENGTHTYPES OF TAPERS
100' - MAXIMUM2 TO 1 LANE ROAD TAPER
1/3 L - MINIMUMSHOULDER TAPER
1/2 L - MINIMUMSHIFTING TAPER
L - MINIMUMMERGING TAPER
MAXIMUM SPACING FOR CHANNELIZING DEVICES
SPEED LIMIT
WORK ZONE
TAPERTAPER TANGENT TANGENT
< 45 MPH
> 45 MPH 25 FEET100 FEET50 FEET
1 x SPEED LIMIT 2 x SPEED LIMIT
100' (PER LANE)(USE IS RECOMMENDED)
DRUM AND 42" DEVICE SPACING (FT) NIGHTTIME 42" DEVICE SPACING (FT)
25 FEET 50 FEET
50 FEET
EXITEXIT
IS TO BE PLACED ON THE PROJECT
SOLID OUTLINES INDICATE A SIGN THAT
EXISTS ON SITE, AND NEEDS TO BE COVERED.
DASHED OUTLINES INDICATE A SIGN THAT
SIGN OUTLINE KEY
Michigan Department of Transportation
MAY 2021
"B", "D" AND "L" TABLES
CHANNELIZING DEVICE SPACING
SIGN BORDER KEY AND ROLL AHEAD SPACING
SPACING-CHARTS
101-GEN-
NO:
TO WORK ZONE)
(POSTED SPEED PRIOR
PREVAILING SPEED
25 FT
GUIDELINES FOR ROLL-AHEAD DISTANCES FOR TMA VEHICLES - TEST LEVEL 2
VEHICLE
TMA
WEIGHT OF
40 MPH OR LESS
(STATIONARY)
5.5 TONS
TO WORK ZONE)
(POSTED SPEED PRIOR
PREVAILING SPEED
50-55 MPH
100 FT
150 FT
175 FT
VEHICLE
TMA
WEIGHT OF
* ROLL-AHEAD DISTANCES ARE CALCULATED USING A 4,410 POUND IMPACT VEHICLE WEIGHT.
25 FT
25 FT
50 FT
(STATIONARY)
12 TONS
(MOBILE)
5 TONS
45 MPH
60-75 MPH
45 MPH
50-55 MPH
60-75 MPH
TMA VEHICLE TO WORK AREA)
(DISTANCE FROM FRONT OF
ROLL-AHEAD DISTANCE*
TMA VEHICLE TO WORK AREA)
(DISTANCE FROM FRONT OF
ROLL-AHEAD DISTANCE*
* ROLL-AHEAD DISTANCES ARE CALCULATED USING A 10,000 POUND IMPACT VEHICLE WEIGHT.
GUIDELINES FOR ROLL-AHEAD DISTANCES FOR TMA VEHICLES - TEST LEVEL 3
APRIL 2022
TRAFFIC TYPICALS
NOTE SHEET
102-GEN-NOTES.dgn
102-GEN-NOTES
NO:
GENERAL NOTES
BUFFER AREAS.
DO NOT STORE EQUIPMENT, MATERIALS OR PERFORM WORK IN ESTABLISHEDG4:
BY MDOT WILL BE ALLOWED.
APPLICABLE SPECIAL PROVISIONS. ONLY DESIGNS AND MATERIALS APPROVED
STANDARD SPECIFICATIONS FOR CONSTRUCTION, THE STANDARD PLANS AND
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, THE CURRENT EDITION OF THE
HARDWARE (MASH) TL-3 AS WELL AS THE CURRENT EDITION OF THE MICHIGAN
REPORT 350 (NCHRP 350) TEST LEVEL 3, OR MANUAL FOR ASSESSING SAFETY
LIGHTING MUST MEET NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM
ALL TEMPORARY SIGNS, TYPE III BARRICADES, THEIR SUPPORT SYSTEMS ANDG3:
ARE ADEQUATELY DELINEATED BY OTHER TRAFFIC CONTROL DEVICES.
WILL BE MADE FOR TRAFFIC PATTERNS FOR WORK LESS THAN THREE DAYS THAT
BE REMOVED BEFORE ANY CHANGE IS MADE IN THE TRAFFIC PATTERN. EXCEPTION
CHANGES IN TRAFFIC PATTERNS OR PROPOSED TEMPORARY TRAFFIC MARKINGS SHALL
ALL EXISTING PAVEMENT MARKINGS WHICH ARE IN CONFLICT WITH EITHER PROPOSED G5:
S9:
OF THE STOP SIGN OR IF SIGNALS ARE BEING USED TO CONTROL TRAFFIC.
STOP AHEAD SIGNS ARE NOT REQUIRED IF THERE IS ADEQUATE VISIBILITY
STOP SIGNS NOT REQUIRED IF SIGNALS ARE ON 4-WAY FLASHING RED.
S8:
PLACE THEM "D" DISTANCE APART.
WHEN SPEED LIMIT SIGNS CANNOT BE PLACED SIDE BY SIDE AS SHOWN,
S7:
THE WORK ZONE.
PLACE ADDITIONAL R8-3 SIGNS AT A MAXIMUM 500' SPACING THROUGHOUT
S6:
STANDARDS.
FABRICATE SPECIAL SIGNS IN ACCORDANCE WITH CURRENT SIGNING DESIGN
S4:
THE W20-5 SIGNS.
WHEN TRAFFIC VOLUMES ARE SIGNIFICANT ENOUGH TO CREATE BACKUPS BEYOND
ADDITIONAL SIGNING AND/OR ELONGATED SIGNING SEQUENCES SHOULD BE USED
S2:
AND CONSOLIDATE THE SEQUENCE AS APPROPRIATE.
OR LONGER. TO APPLY THIS TYPICAL WITHOUT R5-18b SIGNS, REMOVE THE SIGNS
15 DAYS OR LONGER OR NON-FREEWAY PROJECTS WITH A DURATION OF 90 DAYS
R5-18b SIGNS ARE ONLY REQUIRED ON FREEWAY PROJECTS WITH A DURATION OF
S3:
OMIT THIS SIGN IN SUBSEQUENT SEQUENCES IN THE SAME WORK ZONE.
R5-18c IS ONLY REQUIRED IN THE INITIAL SIGNING SEQUENCE IN THE WORK ZONE.
SIGN NOTES
S5:
ACCORDINGLY.
SPEED LIMIT ARE POSTED, OMIT ALL W3-5b AND R2-1 SIGNS AND REDUCE SPACING
OF THE WORK AREA AS INDICATED. IF PERMANENT SIGNS DISPLAYING THE CORRECT
SPEED LIMIT SIGNS RETURNING TRAFFIC TO ITS NORMAL SPEED BEYOND THE LIMITS
WHEN REDUCED SPEED LIMITS ARE UTILIZED IN THE WORK AREA, PLACE ADDITIONAL
ROADWAY SUCH THAT NO SPEED LIMIT SIGNS ARE MORE THAN 2 MILES APART.
IS IN EFFECT. PLACE ADDITIONAL SPEED LIMIT SIGNS AT INTERVALS ALONG THE
ENTRANCE RAMP THAT COMES ONTO THE FREEWAY WHERE THE REDUCED SPEED
EACH MAJOR CROSSROAD THAT INTERSECTS THE WORK ZONE, OR AFTER EACH
PLACE ADDITIONAL SPEED LIMIT SIGNS REFLECTING THE WORK ZONE SPEED AFTER
S1:
SAFETY AND MOBILITY MANUAL, SECTIONS 6.01.09 AND 6.01.10.
CONDITIONS, COVERED, OR REMOVED. FOR GUIDANCE SEE THE WORK ZONE
ALL NON-APPLICABLE SIGNING WITHIN THE CIA MUST BE MODIFIED TO FIT
TCD8:
REVERSE CURVE SIGN, AND THE SECOND REVERSE CURVE SIGN CAN BE OMITTED.
REVERSE CURVE SIGN (W24-1) CAN BE USED INSTEAD OF THE FIRST
WHERE THE SHIFTED SECTION IS SHORTER THAN 600 FEET, A DOUBLE
TYPE III BARRICADES MUST BE LIGHTED FOR OVERNIGHT CLOSURES.TCD3:
"ROAD CLOSED" EXTENDING COMPLETELY ACROSS THE HAUL ROAD.
WHEN THE HAUL ROAD IS NOT IN USE, PLACE LIGHTED TYPE III BARRICADES WITHTCD4:
TEMPORARY TRAFFIC CONTROL DEVICE NOTES
TCD7:
OFF ROAD FROM EDGE OF PAVEMENT TO EDGE OF PAVEMENT.
ADDITIONAL TYPE III BARRICADES MAY BE REQUIRED TO COMPLETELY CLOSE
TCD9:
ARE NOT TO EXCEED 50 FEET AT NIGHT.
45 MPH OR GREATER. THE SPACING FOR 42 INCH CHANNELIZING DEVICE TANGENTS
EXCEED 100 FEET ON ROADWAYS WITH A POSTED WORK ZONE SPEED LIMIT OF
WITH A POSTED WORK ZONE SPEED LIMIT LESS THAN 45 MPH AND SHOULD NOT
SHOULD NOT EXCEED TWICE THE WORK ZONE SPEED LIMIT IN MPH FOR ROADWAYS
THE MAXIMUM DISTANCE IN FEET BETWEEN CHANNELIZING DEVICES IN A TANGENTTCD2:
TAPERS ARE NOT TO EXCEED 25 FEET AT NIGHT.
LIMIT OF 45 MPH OR GREATER. THE SPACING FOR 42 INCH CHANNELIZING DEVICE
SHOULD NOT EXCEED 50 FEET ON ROADWAYS WITH A POSTED WORK ZONE SPEED
ROADWAYS WITH A POSTED WORK ZONE SPEED LIMIT LESS THAN 45 MPH AND
SHOULD NOT EXCEED 1.0 TIMES THE WORK ZONE SPEED LIMIT IN MPH FOR
THE MAXIMUM DISTANCE IN FEET BETWEEN CHANNELIZING DEVICES IN A TAPERTCD1:
AT A CONSISTENT DISTANCE, BETWEEN 10' AND 20' APART.
THREE RUMBLE STRIPS. PLACE THE RUMBLE STRIPS IN THE ARRAY
RECOMMENDATIONS. AN ARRAY OF RUMBLE STRIPS CONTAINS
SHOWN, AND IN ACCORDANCE WITH THE RUMBLE STRIP MANUFACTURER'S
IF NOT SPECIFIED IN THE CONTRACT, PLACE RUMBLE STRIPS AS
RUMBLE STRIPS ARE TO BE PLACED AS SPECIFIED IN THE CONTRACT.
RAMP NOTES
DIVERGE IN A FREE MANNER
CHANELIZING DEVICES MUST BE POSITIONED TO ENABLE RAMP TRAFFIC TO
WHEN CONDITIONS ALLOW, E5-1 SIGNS MUST BE REMOVED OR COVERED ANDRMP1:
WORK SHOULD BE EXPEDITED TO AVOID THE STOP AND/OR YIELD CONDITIONS.
THE RAMP TO COMPLETE WORK TO ALLOW AN ADEQUATE MERGE DISTANCE.
IN PLACE OF W3-2 SIGNS. CONSIDERATION SHOULD BE GIVEN TO CLOSING
R1-2 SIGNS. WHEN R-1 SIGNS ARE USED, W3-1 SIGNS MUST BE USED
WHEN CONDITIONS WARRANT, R1-1 SIGNS MAY BE USED IN PLACE OF
STOP AND YIELD CONDITIONS SHOULD BE AVOIDED WHENEVER PRACTICAL.RMP2:
G2:
THE ENGINEER.
GEN-KEY ARE APPROXIMATE AND MAY NEED ADJUSTING AS DIRECTED BY
DISTANCE BETWEEN SIGNS, "D", THE VALUES FOR WHICH ARE SHOWN IN TYPICAL
BOARD IN THE CLOSED LANE AS CLOSE TO THE BEGINNING OF TAPER AS POSSIBLE.
SECTIONS, IF ARROW BOARD CANNOT BE PLACED BEHIND CURB, PLACE ARROW
MOTORISTS WHEN PHYSICAL LIMITATIONS RESTRICT PLACEMENT. IN CURBED
PRACTICAL, BUT NOT IN A MANNER THAT WILL OBSCURE OR CONFUSE APPROACHING
PLACE LIGHTED ARROW PANELS AS CLOSE TO THE BEGINNING OF TAPERS AS TCD6:
S10:
A SPEED REDUCTION IN THIS DIRECTION.
PLACE REDUCED SPEED ZONE AHEAD SIGN (W3-5b) HERE WHEN USING
TCD10:
SIDES OF THE ROAD 1000 FEET FROM EACH OTHER.
CORRECT PCMS MESSAGING. STAGGER PCMS THAT ARE ON OPPOSING
CHANGEABLE MESSAGE SIGN GUIDELINES FOR RECCOMENDED AND
SEE THE WORK ZONE SAFETY AND MOBILITY MANUAL, PORTABLE
AN ANGLE OF 45 DEGREES IN THE DIRECTION VEHICULAR TRAFFIC IS TO PASS.
HAVE ALTERNATING DIAGONAL ORANGE AND WHITE STRIPES SLOPING DOWNWARD AT
AND WHITE RETROREFLECTIVE SHEETING. THE RETROREFLECTIVE SHEETING MUST
A MINIMUM OF 12 INCHES IN WIDTH AND 36 INCHES IN HEIGHT AND HAVE ORANGE
WHEN USED WITH A TEMPORARY SIGNAL SYSTEM. THE OBJECT MARKERS MUST BE
IN THE STANDARD PLAN FOR TEMPORARY CONCRETE BARRIER (R-53, AND R-126)
USE OBJECT MARKER SIGNS IN LIEU OF THE TYPE B HIGH INTENSITY LIGHT SHOWNTCD5:
ROLL AHEAD DISTANCE
B = LENGTH OF LONGITUDINAL BUFFER
L = MINIMUM LENGTH OF TAPER
D = DISTANCE BETWEEN TRAFFIC CONTROL DEVICES
SEE GEN-SPACING-CHARTS FOR COMMON VALUES INCLUDING:G1:
TRAFFIC REGULATOR NOTES
TR1:
BY THE ROADWAY ADT, GEOMETRICS, AND AS DIRECTED BY THE ENGINEER.
THE MAXIMUM DISTANCE BETWEEN THE TRAFFIC REGULATORS IS DETERMINED
AND THE VIDEO "HOW TO SAFELY REGULATE TRAFFIC IN MICHIGAN".
THE CURRENT VERSIONS OF THE TRAFFIC REGULATOR'S INSTRUCTION MANUAL
SPECIFICATIONS, THE STANDARD PLANS AND APPLICABLE SPECIAL PROVISIONS,
TRAFFIC REGULATORS MUST FOLLOW ALL THE REQUIREMENTS IN THE STANDARD
TR2:
THE HOURS OF DARKNESS.
REGULATOR'S STATIONS WHEN TRAFFIC REGULATING IS ALLOWED DURING
PROVIDE APPROPRIATE BALLOON LIGHTING TO SUFFICIENTLY ILLUMINATE TRAFFIC
S11:
LENGTH OF SHIFT AND AS PER THE ENGINEER.
SHIFTS MORE THAN 12FT, PLACE THREE OR MORE W1-6(R)(L) SIGNS DEPENDING UPON
SHIFTS 5FT TO 12FT, PLACE TWO W1-6(R)(L)
SHIFTS 4FT OR LESS, PLACE ONE W1-6(R)(L)
THE NUMBER OF W1-6 SHIFT SIGNS TO PLACE FOR A SHIFT IS AS FOLLOWS:
S12:
IN THIS DIRECTION
PLACE R2-1 SIGNS AS DETAILED IN NOTE S5 WHEN THERE IS A SPEED REDUCTION
THE FOLLOWING NOTES APPLY IF CALLED FOR ON THE TRAFFIC TYPICAL
APRIL 2022
TRAFFIC TYPICALS
NOTE SHEET
102-GEN-NOTES.dgn
102-GEN-NOTES
NO:
SIGNAL NOTES
TRUCK IS LOCATED OVER ACTIVE TRAVEL LANES.
THE CONTRACTOR MUST HAVE A DESIGNATED SPOTTER IF THE AERIAL BUCKETSIG4:
INTERSECTION WHEN TRAFFIC IS PLACED IN A 4 WAY STOP.
COMPROMIZED. USE TRAFFIC REGULATORS TO CONTROL TRAFFIC THROUGH THE
THE INTERSECTION IN A 4 WAY STOP IF THE 14 FOOT VERTICAL CLEARANCE IS
CLEARANCE. THE CONTRACTOR MUST UTILIZE AN ALTERNATE SET UP, OR PLACE
THE LOWEST POINT OF THE BUCKET MAY NOT TRAVEL BELOW 14 FOOT VERTICALSIG5:
TRUCK MAY BE MOVED TO FACILITATE WORK.
DELINEATE THE TRUCK WITH CHANNELIZING DEVICES. THE POSITION OF THESIG6:
42 INCH CHANNELIZING DEVICES FOR NIGHTTIME WORK.
DELINEATE THE WORK ZONE AREA WITH 28 INCH CONES FOR DAYTIME WORK, ORSIG3:
SIGNAL IS IN OPERATION.SIG2:
EXISTING SIGNAL MUST BE EITHER 4-WAY FLASHING RED, BAGGED, OR TURNED OFF.SIG1:
MAINTENANCE AND SURVEYING NOTES
ACTIVATED AMBER BEACON.
WORK AND SHADOW VEHICLES SHALL BE APPROPRIATELY EQUIPPED WITH AN MS4:
SIGHT DISTANCE IN ADVANCE OF VERTICAL OR HORIZONTAL CURVES.
SLOW DOWN AND TRAVEL AT A FARTHER DISTANCE TO PROVIDE ADEQUATE
AREA AND PROCEEED AT THE SAME SPEED. THE SHADOW VEHICLE SHOULD
VEHICLES SHOULD MAINTAIN THE RECOMENDED DISTANCE FROM THE WORK
WHENEVER STOPPING SIGHT DISTANCE EXISTS TO THE REAR, THE SHADOW MS1:
TABLES.
SHOULD BE PARKED ACCORDING TO THE ROLL AHEAD DISTANCE
SEPARATE THE WORK SPACE FROM TRAFFIC. IF USED, THE VEHICLES
WORK OR SHADOW VEHICLES WITH OR WITHOUT A TMA MAY BE USED TO MS3:
TO) IS THE LAYOUT OF CONCRETE PATCHES.
SPACING MUST BE USED. AN EXAMPLE OF AN OPERATION (BUT NOT LIMITED
CHANNELIZING DEVICES TO DELINEATE OPEN OR CLOSED LANES AT 50 FT
A MOBILE OPERATION IS OCCURRING DURING THE NIGHTTIME HOURS,
WHEN WORKERS ARE OUTSIDE THEIR VEHICLES IN AN EXISTING LANE WHILEMS5:
TYPE OF WORK TAKING PLACE AS PER THE ENGINEER.
W21-6 AND W20-1 SIGNS MAY BE SUBSTITUTED AS DETERMINED BY THE MS6:
"END ROAD WORK" SIGN.
AND THE "END WORK CONVOY" SIGN, OR BETWEEN THE "WORK ZONE BEGINS" AND
WITH AN ACTIVATED BEACON, BETWEEN THE "BEGIN WORK CONVOY" SIGN
WORKERS OUTSIDE OF VEHICLES SHOULD WORK WITHIN 150' OF WORK VEHICLES MS2:
THE FOLLOWING NOTES APPLY IF CALLED FOR ON THE TRAFFIC TYPICAL
MAY 2021
LONGER THAN 1 HOUR
ON A 5-LANE UNDIVIDED ROADWAY
SIGNAL WORK AT INTERSECTION DATE:
160-INT-LD-CLT-MID.dgn
INT-LD-CLT-MID
160-
NO:
SIDE STREET
SIDE STREET
M A I
S
R E
E T
M A
R E
E T
D D
D L
V a r i e s
M A
X
N
L
DDDL
100' MAX.
50' MIN.
Varies
D D
D
X
N
Varies
VariesLDDD
W O
R K
E
V
R
IE
S
WORK AREA
STOP
R1-1
STOP
R1-1
STOP
R1-1
STOP
R1-1
W3-1
W3-1
W3-1
W3-1
CLOSED
AHEAD
LEFT LANE
W20-5L
CLOSED
AHEAD
LEFT LANE
W20-5L
CLOSED
AHEAD
LEFT LANE
W20-5L
CLOSED
AHEAD
LEFT LANE
W20-5L
PROHIBITED.)
ALWAYS BE
TURN MOVEMENT SHALL
WORK AREA. (LEFT
BASED ON POSITION OF
SIGN REQUIREMENT
PROHIBITED.)
SHALL ALWAYS BE
(LEFT TURN MOVEMENT
OF WORK AREA.
BASED ON POSITION
SIGN REQUIREMENT
ALWAYS BE PROHIBITED.)
(LEFT TURN MOVEMENT SHALL
POSITION OF WORK AREA.
SIGN REQUIREMENT BASED ON
ALWAYS BE PROHIBITED.)
(LEFT TURN MOVEMENT SHALL
POSITION OF WORK AREA.
SIGN REQUIREMENT BASED ON
100' MAX.
50' MIN.
G
WORK
AHEAD
W20-1c
SINAL
G
WORK
AHEAD
W20-1c
SINAL
G
WORK
AHEAD
W20-1c
SINAL
G
WORK
AHEAD
W20-1c
SINAL
SEE NOTE S9
TRAFFIC FLOW
NIGHTTIME WORK
WORK. USE LIGHTED ARROW PANEL FOR
USE TARGET ARROW (W1-6) FOR DAYTIME
CHANNELIZING DEVICES
KEY
SIGNAL:
DEVICES:
SIGNING:
GENERAL:
SIG1, SIG3, SIG4, SIG5
TCD1, TCD2, TCD6
S1, S9
G1, G2, G3
STANDARD NOTES
(SEE 102-GEN-NOTES)
R3-5R R3-2
OR
ONLY
R3-5R R3-2
OR
ONLY
R3-5R R3-2
OR
ONLY
R3-5R R3-2
OR
ONLY
MAY 2021
ROADWAY LONGER THAN 1 HOUR
ON A 4-LANE UNDIVIDED ROADWAY
SIGNAL WORK AT INTERSECTION OUTSIDE DATE:
163-INT-LD-OUT.dgn
163-INT-LD-OUT
NO:
M A
R E
E T
SIDE STREET
SIDE STREET
M A
R E
E T
D
D
KEY
WHERE WORK IS TAKING PLACE
WHERE WORK EQUIPMENT IS LOCATED OR
SIGN IS ONLY REQUIRED IN ADVANCE OF
LIGHTS
WORK VEHICLE WITH FLASHING OR ROTATING
TRAFFIC FLOW
G
WORK
AHEAD
W20-1
SINAL
G
WORK
AHEAD
W20-1
SINAL
SIGNAL:
SIGNING:
GENERAL:
SIG4, SIG5
S1
G1, G2, G3
STANDARD NOTES
(SEE 102-GEN-NOTES)
20SP-820A-01
MICHIGAN
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
FOR
STEEL STRAIN POLE
SIG:EMS 1 of 2 APPR:NAP:POJ:04-29-20
FHWA:APPR:05-05-20
a. Description. This work consists of furnishing, fabricating, and erecting a traffic signal steel strain pole as shown on the plans, in accordance with the standard specifications, and as specified herein. This special provision is for an anchor base type (six anchor bolt system) strain pole and includes all other associated hardware required to complete the work.
b. Material. Provide material in accordance with sections 906, 908, and 921 of the Standard Specifications for Construction and this special provision.
Ensure strain pole meets ASTM A572/A572M, Grade 50 or ASTM A595/A595M, Grade A. Ensure base plate meets ASTM A36/A36M. Blast clean fabricated components to remove mill scale and welding slag before galvanizing. Galvanize strain pole and components in accordance with
AASHTO M111M/M111.
Ensure bolts, nuts, and washers meet subsection 906.07 of the Standard Specifications for Construction.
Stainless steel must meet AISI (American Iron and Steel Industry) 300 series.
Acceptance of strain pole is based on general certification in accordance with MDOT’s materials quality assurance procedures manual.
c. Fabrication. Ensure fabrication and welding is in accordance with American Welding Society (AWS) D1.1:2010, Structural Welding Code-Steel (as modified by the current 20SP-707A
- Structural Steel and Aluminum Construction), hereafter called AWS D1.1, except as modified herein.
Fabricator must possess a valid American Institute of Steel Construction (AISC) Bridge Component Quality Management System Certification (CPT).
Submit shop drawings in Portable Document Format (PDF) to the Engineer for approval in accordance with subsection 104.02 of the Standard Specifications for Construction prior to commencing fabrication. Fabricate strain pole as detailed in the contract.
Ensure all welds are 100 percent visual test (VT) inspected by an AWS certified welding inspector (CWI). Ensure all fillet welds are 25 percent magnetic particle test (MT) inspected by a technician qualified in accordance with American Society of Nondestructive Testing (ASNT) Level II, except fillet welds used to secure strain pole cap detail. Perform MT inspection in conformance with ASTM E709 with dry powder using the yoke method. Use half-wave rectified alternating current (direct current) for MT inspection. Ensure all complete joint penetration (CJP) welds are 100 percent ultrasonic test (UT) inspected by a technician qualified in accordance with ASNT Level II.
PhillipsK7 Text Box Schedule A - Attachment 5 Special Provisions (20 Pages)
20SP-820A-01
SIG:EMS 2 of 2 04-29-20
1. Base plate warpage must not exceed 1/16 inches per foot.
2. Tolerance for overall length of strain pole is ±1/8 inch. Tolerance for sweep and camber of strain pole 1/8 inch per 10 foot. Tolerance for twist of strain pole is ±10 degrees.
3. Strain pole wall may be single or multi-ply.
4. Strain pole cannot have more than one longitudinal weld. Transverse welds are prohibited.
d. Erection. Snug tighten anchor bolts in accordance with subsection 810.03.N.2 of the
Standard Specifications for Construction.
Ensure all installation procedures are witnessed by the Engineer.
e. Construction. Ensure all work is in accordance with subsection 810.03 and sections 819 and 820 of the Standard Specifications for Construction and the contract.
For repair coating, apply a coating 1½ times the thickness or thickness equivalent specified for galvanizing on the item, but not less than 5 mils. Use zinc-based solder, zinc-rich primer, or zinc metallizing in accordance with ASTM A780/A780M. Obtain the Engineer’s approval before using zinc metalizing.
f. Measurement and Payment. The completed work, as described, will be measured and paid for at the contract unit price using the following pay item:
Pay Item Pay Unit
Strain Pole, Steel, 6 bolt, __ foot ............................................................................... Each
Strain Pole, Steel, 6 bolt, __ foot includes furnishing all materials, fabrication, shop cleaning, galvanizing, shipping, and erection.
No extension of time or additional compensation will be granted due to obtaining the proper AISC certifications and/or endorsements required for this project.
Construction of the foundation will be included in other items.
20SP-820F-02
PUSHBUTTON AND SIGN, SALVAGE
SIG:EMS 1 of 1 APPR:HLO:NJB:05-26-21
FHWA:APPR:05-27-21
a. Description. This work consists of removing, storing, and reinstalling an existing pushbutton and sign at locations shown on the plans.
This work includes removal, storing and installation of interface equipment, mounting assembly, brackets, hardware, fittings, connectors, wiring, cable to controller, grounding, risers, conduit, and any other material required to ensure a complete removal and installation.
b. Materials. None specified.
c. Construction. Complete this work in accordance with sections 819 and 820 of the Standard Specifications for Construction, as shown on the plans, and as directed by the Engineer.
Remove an existing pushbutton and sign, store salvaged materials in a protected and clean environment, and re-install the materials.
d. Measurement and Payment. The completed work, as described, will be measured and
Pushbutton and Sign, Salv ........................................................................................ Each
Pushbutton and Sign, Salv includes removing a pushbutton, and sign if one is present, storing the removed materials on site and reinstalling materials at a location shown on the plans. This pay item includes removing and re-installing, as applicable, interface equipment, mounting assembly, brackets, hardware, fittings, connectors, wiring, cable to controller, grounding, risers, conduit and any other material required to ensure a complete removal and installation.
20SP-820FF-01
TRAFFIC SIGNAL BACKPLATE
SIG:EMS 1 of 2 APPR:HLO:NJB:05-01-20
FHWA:APPR:05-06-20
a. Description. This work consists of completing one or more of the following work types at location(s) shown on the plans:
1. Furnishing and installing a traffic signal backplate.
2. Removing and disposing of an existing traffic signal backplate.
3. Removing, storing and reinstalling an existing traffic signal backplate.
As applicable, this work includes removal or installation of hardware, connectors, fittings and all material necessary to complete the work.
b. Materials. Material must meet sections 819, 820, and 921 of the Standard Specifications for Construction.
1. Provide a one-piece backplate for three or four section traffic signal heads as indicated on the plans or as directed by the Engineer. Ensure that five section (doghouse) signal head combinations are provided with no more than three vacuum formed pieces.
2. Provide backplates that are designed to precisely fit the manufacturer’s signal heads and supplied with necessary hardware to attach the backplate to the signal.
3. Provide backplates that are vacuum formed from 0.125 inch thick black acrylonitrile butadiene styrene (ABS) plastic with a hair cell finish on the front side (facing approaching traffic) to reduce glare.
4. Provide backplates that are constructed with a minimum 5/8 inch flange on all sides to provide structural rigidity. Ensure the backplates are provided with a three inch corner radius.
5. Ensure that all backplates extend approximately five inches around the perimeter of the traffic signal combinations after installation.
6. Provide backplates with an ASTM Type IV reflective yellow tape border. Ensure that a one inch border is used with yellow signal heads and visors, and a two inch border is used with black signal heads and visors.
7. Warranty. Provide materials with a manufacturer’s warranty/guarantee, transferable to MDOT, that the supplied materials will be free from all defects in materials and workmanship for the stated time period from the date of shipment. Supply the Engineer with any warranty or guarantee documents from the manufacturer and a copy of the invoice showing date of
20SP-820FF-01
SIG:EMS 2 of 2 05-01-20 shipment.
c. Construction. Complete this work in accordance with sections 819 and 820 of the Standard Specification for Construction, as shown on the plans, and as directed by the Engineer.
Remove, store, and dispose of material in accordance with section 204 of the Standard Specification for Construction.
paid for at the contract unit price using the following pay items:
Backplate, TS ............................................................................................................ Each Backplate, TS, Rem ................................................................................................... Each Backplate, TS, Salv ................................................................................................... Each
1. Backplate, TS includes installing the backplate on existing or new signal head(s) at location(s) shown on the plans where installation is specified. Furnish and install a traffic signal backplate, as indicated on the plans or as directed by the Engineer.
2. Backplate, TS, Rem includes removing the existing backplate, hardware, and other appurtenances, required for a complete removal where removal is specified. Dispose of removed materials.
3. Backplate, TS, Salv includes removing the existing backplate, hardware, and other appurtenances required for a complete removal, storing salvaged materials in a clean environment, and reinstalling the materials where salvage is specified. Complete reinstallation in accordance with subsection c. of this special provision.
20SP-820GG-01
SPAN WIRE TETHER
SIG:EMS 1 of 1 APPR:NJB:HLO:05-01-20
a. Description. This work consists of furnishing and installing hardware, connector hangers, fittings, tether plate, span wire clamps, associated stainless steel fasteners and a span wire tether.
Top tether traffic signal heads. Bottom tethering can only be used with approval of the Engineer and the Statewide Signal Shop.
b. Materials. Provide material meeting the requirements of sections 819, 820, and 921 of the Standard Specifications for Construction.
1. Provide tether span wire that is 1/4 inch nominal diameter, 7-strand, galvanized, Class C in accordance with ASTM A475 with common grade breaking strength of 1900 pounds.
Maintain clearance of 17 feet over roadway.
2. Connector hanger, tether plate, span wire clamps and associates stainless steel fasteners, materials and hardware to furnish and install a span wire tether.
3. Warranty. Provide materials with a manufacturer’s warranty/guarantee, transferable to MDOT, that the supplied materials will be free from all defects in materials and workmanship for the stated time period from the date of shipment. Supply the Engineer with any warranty or guarantee documents from the manufacturer and a copy of the invoice showing date of shipment.
c. Construction. Complete this work in accordance with sections 819, 820 and 821 of the
Standard Specification for Construction, as shown on the plans, and as directed by the Engineer.
Where installation is specified, install the span wire tether on existing or new signal head(s) at location(s) shown on the plans. Furnish, install, remove or install on the project, a span wire tether, as indicated on the plans or as directed by the Engineer.
Span Wire Tether ...................................................................................................... Each
20SP-820I-01
TRAFFIC SIGNAL WORK - CONSTRUCTION METHODS
SIG:EMS 1 of 2 APPR:HLO:NJB:04-29-20
a. Description. This special provision is for electrical construction and/or relocation of traffic signal facilities is to be used in addition to the applicable sections of the standard specifications.
In case of conflict use whichever is most restrictive.
b. Materials. Furnish new material and equipment, unless specified otherwise, and comply with sections 918 and 921 of the Standard Specifications for Construction. Materials furnished by the Department to the Contractor will be picked up by the Contractor at such site as designated by either MDOT, or the Local Agency representing MDOT, with any associated costs included in pay items as indicated on the plans and will not be paid for separately.
1. General. Provide manufacturer’s certifications, in accordance with the specifications, for all wire and cable and other items or as directed by the Engineer. Do not install any wire or cable before it has been approved by the Engineer. Include statement “Materials are in accordance with the Specifications” on their material order, especially on wire and cable.
Reuse only the best of the existing material and equipment where the contract calls for reuse of existing material and equipment as directed by the Engineer. The Department will have the right to furnish the Contractor with a new part if any are found defective prior to dismantling.
Any part or parts damaged by the Contractor subsequent to starting the removal are a liability of the Contractor.
Furnish the Engineer an as-built record of all underground or overhead work installed within 5 days after completion of each section of the underground conduit, cable or overhead line work. This record must include the size and length of cable and duct lines, location of the lines, handholes and manholes, and location and size of support poles. Tag and stamp all wires and cables using a brass tag indicating the source and use of the cable.
Connect the ground wire to the ground rod with a UL rated copper or bronze ground clamp.
c. Construction. All work must comply with sections 819 and 820 of the Standard
Specifications for Construction, the applicable “typical” signal construction details, this special provision, and requirements of the NEC, National Electrical Safety Code (NESC), and the Michigan Department of Licensing and Regulatory Affairs (LARA). Contact the LARA for electric service inspection and be responsible for payment of all applicable fees.
1. Maintain all existing street lighting, traffic signal, primary, transmission, communication cables, etc. circuits in an operational condition, unless otherwise noted on the plans or as directed by the Engineer.
2. In addition to subsections 104.07 and 812.03 of the Standard Specifications for
20SP-820I-01
SIG:EMS 2 of 2 04-29-20
Construction, the following applies to Contractor maintenance of permanent or temporary traffic signal installations which are being worked on by the Contractor:
A. The Contractor is responsible for maintaining any portion of a traffic signal which has been worked on by the Contractor until final acceptance of that specific location.
B. If MDOT forces are required to work on an emergency traffic signal malfunction that is determined to have been caused by the work of a Contractor, the cost of the work will be the responsibility of the Contractor.
C. If vandalism occurs to equipment that is not energized, the Contractor is responsible for replacement.
3. Utility Coordination. Notify the System Operating Division of the local utility 72 hours in advance of any work on underground or overhead transmission or distribution circuits. If possible, the System Operating Division will shutdown and red tag the line by 8 a.m. for the day requested. Notify the System Operating Division when the work is complete.
Provide coordination and make arrangements, as described above, to work on traffic signal circuits.
Schedule, coordinate, install, and pay for work provided by the local utility company(s), as indicated on the plans or as directed by the Engineer. The Engineer will not authorize payment for delay caused by the Contractor’s failure to properly schedule and coordinate any utility work.
4. Agency Coordination. Secure all necessary permits covering the operations, including permits from the Public Authorities having jurisdiction over the streets, or other Public Properties in which the work is located, and the improvements therein. Obtain the amount of any charges for payment, including fees or inspection charges required by such authorities, and include the cost of these fees in the bid prices.
The local traffic authority may impose restrictions regarding particular times of certain days of the week wherein the Contractor cannot perform work and may, in fact, be required to clear the area of work obstacles or construction equipment. The Contractor must take note of this and there will be no extra payment to perform the work with possible restrictions imposed.
The Engineer will not authorize extra payment if the Contractor chooses to perform work during overtime status.
5. Ensure construction is performed by persons who are experienced and qualified for the work required. On-site licensed (Journeyman electrician) supervision is required for the electrical system installation (including placement of traffic loops, conduits, and/or cables in dirt, foundations, and handholes) and must be present at all times when electrical construction is in progress. Ensure the ratio of electrical journeymen or master electricians to registered apprentice electricians is on the basis of one electrical journeyman or master electrician to one registered apprentice electrician in accordance with Michigan Law section 338.883e. This ratio is to be enforced on a jobsite basis. For traffic signal work a single jobsite is defined as a single intersection or single electronic traffic control device.
20SP-1003A-01
QUALITY INDEX FOR PORTLAND CEMENT CONCRETE
CFS:CPM 1 of 9 APPR:JFS:TES:04-30-20
FHWA:APPR:05-19-20
a. Description. This special provision establishes pay factor and price adjustments for Portland cement concrete based on Department administered Quality Assurance (QA) testing of 28-day compressive strength and fresh concrete air content of Portland cement concrete (PCC).
Perform all work in accordance with the standard specifications and this special provision.
Percent-within-limits (PWL) analysis for payment adjustments apply for mainline, shoulder, miscellaneous concrete pavement (including ramps), and concrete pavement overlay applications. Non-PWL analysis for payment adjustments apply for all other applications.
b. Materials. Mixture requirements will be in accordance with section 1004 of the Standard Specifications for Construction, unless otherwise specified in the contract.
c. Sampling. Sampling will be in accordance with subsections 1003.03.H and 1003.03.L of the Standard Specifications for Construction, except as modified herein. A sample is defined as a representative quantity of concrete taken during production which is used to measure the quality characteristics for the concrete. Compressive strength specimens for each sample consist of two cylinders, either 4-inch by 8-inch or 6-inch by 12-inch.
1. PWL Applications. Production lots for PWL analysis are made of at least five approximately equal sublots. The Engineer may approve occasional small individual quantities of concrete to be combined with a larger production lot provided they are of the same grade, contain the same Job Mix Formula (JMF), and are used for the same PWL application.
The random number method for PWL sampling will be used to determine the sampling locations. A random number will be generated for each sublot. The sampling frequency for a production lot is one QA sample per sublot.
If a sublot is not completed in sufficient quantity to permit it to be randomly sampled during its production day, as planned, the quantity of concrete for the sublot that was not placed as part of the day’s production will be sampled during the following production day in accordance with the original random number sampling protocol. The random sample will then represent the total quantity of concrete for the sublot placed over the respective multiple days of production.
If the quantity of a grade of concrete to be sampled on the last day of production for the project is not sufficient to make up three or more equivalent sublots, combine the test results for these one or two remaining sublots, or fraction thereof, with the previous day’s production lot for quality index analysis.
The Engineer will mold and cure two additional compressive strength cylinders, in the same
CFS:CPM 2 of 9 04-30-20 manner as the QA specimens, that are to be retained in the event of dispute resolution.
2. Non-PWL Applications. See subsection 1003.03.L of the Standard Specifications for Construction.
3. Small Incidental Quantities. See subsection 1003.03.J in the Standard Specifications for Construction for reduced sampling and testing for small incidental quantities.
d. Quality Index Analysis. The Engineer’s QA test results will be used to determine the pay factor (PF) and price adjustment (ADJ). The Contractor QC test results will not be used for PF and ADJ analysis. The Engineer will complete PF and ADJ analysis within 7 working days after completion of all 28-day compressive strength testing for the represented production lot or quantity of concrete. All values for PWL, overall lot pay factor (OLPF), and PF are in percent.
PWL values are rounded to the nearest whole number. PF and OLPF values are rounded to two decimal places.
1. PWL Applications. The PWL, PF, OLPF, and associated ADJ will be determined using the MDOT Concrete PWL Worksheet. The acceptable quality level (AQL), rejectable quality limit (RQL), lower specification limit (LSL), and upper specification limit (USP) are shown in Table 1. The Engineer will perform the quality index analysis for all concrete represented by lot size and makeup necessary for random sampling.
Table 1: Quality Index Parameter Specification Limits for PWL Applications
Quality Index Parameters Grade of Concrete
3500/3500HP
28-Day Compressive Strength
Specification Limit – Lower (LSL) (psi) 3500
Specification Limit – Upper (USL) N/A
Acceptable Quality Level (AQL) 95 PWL
Rejectable Quality Level (RQL) 50 PWL
Rejection Limit for an Individual Strength Sample Test Result (psi) 2500
Air Content of Fresh Concrete
Specification Limit – Lower (LSL) (percent) 5.5
Specification Limit – Upper (USL) (percent) 8.5
Acceptable Quality Level (AQL) 90 PWL
Rejectable Quality Level (RQL) 50 PWL
Suspension Limits (percent) < 5.0 or > 9.0
A. Pay Factor Determination for PWL Applications. The MDOT Concrete PWL
Worksheet uses the following formulas to calculate the PF and associated ADJ for each production lot. The maximum calculated numerical values for PF and OLPF will not exceed 105.00.
(1) Pay Factor for 28-day Compressive Strength (PFs). If PWL for 28-day compressive strength (PWLs) is 95 to 100 inclusive, use the following formula to determine PFs:
PFs = 5 + PWLs
CFS:CPM 3 of 9 04-30-20
If PWLs is from 50 to less than 95, use the following formula to determine PFs:
PFs = 47.22 + (0.5556 x PWLs)
If PWLs is less than 50, the production lot is rejectable and the Engineer will require additional evaluation to decide what further action may be warranted as described in section e of this special provision.
(2) Pay Factor for Air Content of Fresh Concrete (PFac). If PWL for air content of fresh concrete (PWLac) is 70 to 100 inclusive, use the following formula to determine PFac:
PFac = 55 + (0.5 x PWLac)
If PWLac is from 50 to less than 70, use the following formula to determine PFac:
PFac = 37.5 + (0.75 x PWLac)
If PWLac is less than 50, the Engineer will elect to do one of the following:
(a) Require removal and replacement of the entire production lot with new testing conducted on the replacement concrete and repeat the evaluation procedure.
(b) Provided no individual test results for the production lot are outside the suspension limits for air content, allow the production lot to remain in place and apply an Overall Lot Pay Factor (OLPF) of 50.00.
(c) Allow submittal of a corrective action plan for the Engineer’s approval. If the Engineer does not approve the plan for corrective action, subsections d.1.A.(2).(a) or d.1.A.(2).(b) of this special provision will be applied, as determined by the Engineer. All costs associated with plan submittal and corrective action under this subsection will be borne by the Contractor. Positive ADJ (quality initiative) will not apply for production lots subject to corrective action.
(3) Overall Lot Pay Factor (OLPF). Use the following formula to calculate the
OLPF:
OLPF = (0.60 x PFs) + (0.40 x PFac)
B. Price Adjustment for PWL Applications. Both pay factors (PFs and PFac) must be
100.00 or greater for the production lot to be eligible for positive ADJ (quality initiative) consideration. Use the following formula to determine price adjustment for each production lot, using the established Base Price for the pay item included in the contract:
ADJ = (OLPF-100)(Price)/100
2 Non-PWL Applications. Positive ADJ (quality initiative) does not apply for non-PWL applications. Each individual QA strength sample test result will be used to determine the PF and ADJ for the respective quantity of concrete that it represents, based on the sampling rate.
CFS:CPM 4 of 9 04-30-20
The specification limits for non-PWL applications are defined in Tables 2 and 3. Unless otherwise specified in the contract, concrete not conforming to the requirements specified in Tables 2 and 3 is rejectable and subject to further evaluation.
Table 2: Quality Index Parameter Specification Limits for Non-PWL Applications
Quality Characteristic Specification Limits
Air Content of Fresh Concrete (percent) 5.5 – 8.5
Rejection Limit (percent) <5.0 or >9.0
Conc. Temp. (deg. F) 45 - 90 at time of placement
Slump (max.) (inch) See footnotes a through l in Table 1004-1 of the Standard Specifications for Construction
28-day Compressive Strength (psi) For LSL see Table 3
Rejection Limit - 28-day Compressive Strength See Table 3
Table 3: Quality Index Parameter Specification Limits for 28-Day Compressive Strength (psi) for Non-PWL Applications
A. Pay Factor Determination for…