About this file
This is a Statement of Work document for Request for Proposal (RFP) No. 210000002006 issued by the State of Michigan Department of Natural Resources (DNR). The RFP seeks two factory rebuilt Lycoming IO-540AB1A5 aircraft engines to replace engines approaching their Time Between Overhaul dates on two DNR aircraft used for fire surveillance missions. The specific engines required are a factory new 2009 Cessna 182T engine (Core engine from N5101U, S/N L-33567-48E) and a factory rebuilt 2004 Cessna 182T engine (Core engine from N2463B, S/N RL-12301-48E). The engines must be delivered within 120 calendar days of order to two locations: DNR Forest Fire Experiment Station in Roscommon, Michigan, and Kubick Aviation in Kingsford, Michigan. No alternate engine manufacturers or brands will be considered. Bidders must appoint a dedicated Contractor Representative available during normal business hours (8 a.m. to 5 p.m. EST, Monday through Friday) and provide a toll-free customer service number. Delivery must occur between 8 a.m. and 4 p.m. EST on weekdays.
The pricing for this contract is firm for the entire contract period, with payment to be made via Electronic Funds Transfer (EFT) following submission of compliant invoices to the project manager. Bidders must describe their delivery programs, transportation methods, quality assurance programs, warranty offerings, and recall procedures. All products must comply with hazardous chemical identification requirements under federal Emergency Planning and Community Right-to-Know Act regulations, and bidders must confirm mercury-free status and disclose any brominated flame retardants content. Packaging must be optimized for lowest freight rates and palletized using manufacturer standard 4-way shipping pallets whenever possible. The State reserves the right to inspect and test delivered engines within 30 calendar days of receipt and may reject, accept with deficiencies, or accept the products. Contractors must cure any deficiencies within 10 business days at no additional cost to the State.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| proposal-instructions-confidential-treatment-vendor-questions-worksheet-pass-fail-low-bid.docx | DOCX document | |
| schedule_b_pricing.docx | DOCX document | |
| standard-contract-terms-short-form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Michigan.gov/MiProcurement
Michigan.gov/MiProcurement Schedule a – statement of work contract activities Request for Proposal (RFP) No. 210000002006 Factory Rebuilt Aircraft Engines This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term “bidder” is used to identify where specific responses to the RFP are required.
The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.
IMPORTANT NOTE TO CONTRACTORS/BIDDERS: There are specific requirements for which acceptance must be simply acknowledged through a checkbox(es), and others that require further explanation. Click one checkbox and complete the entries as identified.
BACKGROUND
The DNR flies multiple aircraft across the state to provide fire surveillance and other necessary assignments to further the DNR’s mission. These flights are necessary to help detect and inform of wildland fires. Currently two of the DNR’s planes have engines that are approaching their Time Between Overhaul dates, and if not replaced, the aircraft will be grounded.
SCOPE
The DNR is soliciting two factor rebuilt aircraft engines to be delivered to Roscommon and Iron Mountain. These engines will replace the current engines that are approaching the Time Between Overhaul (TBO) set by the manufacturer.
REQUIREMENTS
1. General Requirements
1.1. Product Specifications
The Contractor must provide the following:
Two (2) Factory Rebuilt Lycoming IO-540AB1A5 engines.
Core engine from N5101U is IO-540AB1A5, S/N L-33567-48E, Factory new from 2009 Cessna 182T (S/N 18282156) Core engine from N2463B is IO-540AB1A5, S/N RL-12301-48E, Factory rebuilt from 2004 Cessna 182T (S/N 18281735)
Delivered to:
DNR Forest Fire Experiment Station 1337 E. Robinson Lake Rd.
Roscommon, MI 48653 Kubick Aviation 250 Riverhills Road Kingsford, MI 49802
Bids on alternate brand or manufacturer lines will not be considered.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
1.2. Warranties
Describe any warranties included in the bid – add additional rows as needed. Explain the process for reporting warranty issues and how the Contractor will handle any repairs or replacements.
The State reserves the right to require additional warranties other than those identified by the Contractor in its response to this RFP.
Bidder must provide detailed information requested below:
Describe any warranties included in the bid (if none, write N/A):
Provide the length of the warranty:
Explain the process for reporting warranty issues:
Explain how any repairs or replacements are made, including timing, etc.:
If the warranty is provided through a third-party or manufacturer, the Contractor must confirm that the manufacturer’s warranty passes through to the State.
Provide the name, address, contact name, phone number and email address of the party responsible for the warranty:
1.3. Recall Requirements and Procedures
The Contractor must describe any recall procedures.
Bidder must provide detailed information as requested in the above requirement(s). If none, enter N/A.
1.4. Quality Assurance Program
Explain your Quality Assurance Program(s).
Bidder must provide detailed information as requested in the above requirement(s):
2. Service Requirements
2.1. Delivery
Delivery will be expected within 120 calendar days upon date of order between 8:00 a.m. and 4:00 p.m. EST Monday through Friday. (See Section 1.1 Product Specifications for delivery location.)
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
Bidder must describe how they comply with the above requirement(s):
3. Staffing
3.1. Contractor Representative
The Contractor must appoint one individuals specifically assigned to State of Michigan accounts who will respond to State inquiries regarding the Contract Activities, answer questions related to ordering and delivery, etc. (the “Contractor Representative”).
The Contractor must notify the Contract Administrator at least 7 calendar days before removing or assigning a new Contractor Representative.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
3.2. Customer Service Toll-Free Number
The Contractor must specify its toll-free number for the State to contact the Contractor Representative who must be available for calls during the hours of 8 am to 5 pm EST Monday through Friday, at a minimum. Identify customer service availability for this proposal by hours and days of the week.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
The Bidder must specify its toll-free number for the State to make contact with the Contractor Representative.
Identify customer service availability for this proposal by hours and days of the week.
3.3. Security
The Contractor’s staff may be required to make deliveries to or enter State facilities. The State may require the Contractor’s personnel to wear State issued identification badges.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
4. Pricing
4.1. Price Term
Pricing is firm for the entire length of the Contract.
5. Ordering
5.1. Authorizing Document
The appropriate authorizing document for the Contract will be a Purchase Order.
6. Delivery
6.1. Delivery Programs
The Contractor must explain in detail its delivery programs (e.g., standard delivery and quick-ship), including any limitations such as quantity.
The Contractor must explain the transportation method (e.g., UPS, FedEx, Contractor fleet, or other third-party carrier) it intends on utilizing in delivery of the Contract Activities.
Bidder must describe how they comply with the above requirement(s):
6.2. Packaging and Palletizing
Packaging must be optimized to permit the lowest freight rate. Shipments must be palletized whenever possible using manufacturer's standard 4-way shipping pallets.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
Bidder must describe how they comply with the above requirement(s):
7. Acceptance
7.1. Acceptance, Inspection and Testing
Contract Activities are subject to inspection and testing by the State within 30 calendar days of the State’s receipt of them (“State Review Period”), unless otherwise provided in Schedule A. If the Contract Activities are not fully accepted by the State, the State will notify Contractor by the end of the State Review Period that either: (a) the Contract Activities are accepted but noted deficiencies must be corrected; or (b) the Contract Activities are rejected. If the State finds material deficiencies, it may: (i) reject the Contract Activities without performing any further inspections; (ii) demand performance at no additional cost; or (iii) terminate this Contract in accordance with Section 23, Termination for Cause.
Within 10 business days from the date of Contractor’s receipt of notification of acceptance with deficiencies or rejection of any Contract Activities, Contractor must cure, at no additional cost, the deficiency and deliver unequivocally acceptable Contract Activities to the State. If acceptance with deficiencies or rejection of the Contract Activities impacts the content or delivery of other non-completed Contract Activities, the parties’ respective Program Managers must determine an agreed to number of days for re-submission that minimizes the overall impact to the Contract. However, nothing herein affects, alters, or relieves Contractor of its obligations to correct deficiencies in accordance with the time response standards set forth in this Contract.
If Contractor is unable or refuses to correct the deficiency within the time response standards set forth in this Contract, the State may cancel the order in whole or in part. The State, or a third party identified by the State, may perform the Contract Activities and recover the difference between the cost to cure and the Contract price plus an additional 10% administrative fee.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
8. Invoice and Payment
8.1. Invoice Requirements
All invoices submitted to the State must include: (a) date; (b) purchase order; (c) quantity; (d) description of the Contract Activities; (e) unit price; (f) shipping cost (if any); (g) vendor-generated invoice number and (h) total price.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
8.2. Payment Methods
The State will make payment for Contract Activities via EFT.
8.3. Procedure
Invoices will be submitted to the project manager for review and approval.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
9. Licensing Agreement The Contractor must provide a copy of any applicable licensing agreement.
Bidder must provide a copy of any applicable licensing agreement either in this response box or identified here as an attachment to this RFP.
10. Additional Requirements
10.1. Hazardous Chemical Identification
In accordance with the federal Emergency Planning and Community Right-to-Know Act, 42 USC 11001, et seq., as amended, the Contractor must provide a Material Safety Data Sheet listing any hazardous chemicals as defined in 40 CFR §370.2, to be delivered. Each hazardous chemical must be properly identified, including any applicable identification number, such as a National Stock Number or Special Item Number.
The Contractor must identify any hazardous chemicals that will be provided under any resulting contract.
| ☐ |
| I confirm the above requirement and agree with no exception. |
10.2. Mercury Content
Pursuant to MCL 18.1261d, mercury-free products must be procured when possible. The Contractor must explain if it intends to provide products containing mercury, the amount or concentration of mercury, and whether cost competitive alternatives exist. If a cost competitive alternative does exist, the Contractor must provide justification as to why the particular product is essential. All products containing mercury must be labeled as containing mercury.
| ☐ |
| I confirm the above requirement and agree with no exception. |
10.3. Brominated Flame Retardants
The State prefers to purchase products that do not contain brominated flame retardants (BFRs) whenever possible. The Contractor must disclose whether the products contain BFRs. Contractor must describe how products that meet these requirements are identified or otherwise labelled.
| ☐ |
| I confirm the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s): (Add rows as necessary.)
| Item #: |
| Response: |
Version 2021-1 1 of 21
Version 2021-1 1 of 24 image1.png