SCH A - BID FORM - B25-T049CA.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- B25-T049CA
- Issued by
- El Paso County, Colorado
About this file
This is a Bid Form (Schedule A) for the Sinton Trail Improvements project issued by the City of Colorado, focusing on trail reconstruction from Chestnut to Holland Park. The bid document details 40 line items covering a comprehensive trail improvement project, including mobilization, clearing, traffic control, erosion management, and various construction activities. The project involves approximately 0.5 miles of trail improvements, with specific tasks such as removing existing asphalt (5,196 square yards), installing new concrete sidewalk (5,020 square yards), adding split-rail fence (1,791 linear feet), and implementing erosion control measures including rock socks, sediment control logs, and native seeding.
The total estimated project cost is $40,000, with a line item for minor contract revisions. Key construction elements include potholing (35 hours), tree and concrete removal, aggregate base course installation, concrete flatwork, stair construction, signage, and extensive erosion and environmental control measures. The bid form allows contractors to input unit prices for each specified item, with quantities predetermined, suggesting a unit price contract approach. The project appears to focus on trail accessibility, surface improvement, and environmental considerations, with specific attention to native landscaping, sediment control, and creating more accessible trail connectivity between Chestnut and Holland Park.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| SCHEDULE A - BID FORM | ||||||
| B25-T049CA | ||||||
| SINTON TRAIL IMPROVEMENTS (CHESTNUT TO HOLLAND PARK) | ||||||
| (Please fill bid number in shaded cells) | ||||||
| BID ITEM NUMBER | COS CONTRACT ITEM NO. | CONTRACT ITEM | UNIT | QTY | UNIT PRICE | EXTENDED COST |
| 1 | 100-00000 | Mobilization | LS | 0.25 | $ - 0 | |
| 2 | 100-10000 | Clearing And Grubbing | LS | 0.25 | $ - 0 | |
| 3 | 100-20001 | Temporary Traffic Control | LS | 0.25 | $ - 0 | |
| 4 | 100-30010 | Erosion Control Management | LS | 0.25 | $ - 0 | |
| 5 | 100-51000 | Potholing | HR | 35 | $ - 0 | |
| 6 | 203-00000 | Embankment Material | CY | 400 | $ - 0 | |
| 7 | 220-00010 | Removal of Tree | EA | 6 | $ - 0 | |
| 8 | 220-00180 | Removal of Concrete Flatwork | SY | 103 | $ - 0 | |
| 9 | 220-00220 | Removal of Asphalt Mat | SY | 5,196 | $ - 0 | |
| 10 | 220-00810 | Removal of Sign Post | EA | 4 | $ - 0 | |
| 11 | 220-01100 | Removal of Guardrail | LF | 54 | $ - 0 | |
| 12 | 240-00817 | Reset Ground Sign | EA | 6 | $ - 0 | |
| 13 | 240-04015 | Adjust Manhole | EA | 9 | $ - 0 | |
| 14 | 240-04040 | Adjust Valve | EA | 1 | $ - 0 | |
| 15 | 240-04065 | Adjust Pullbox | EA | 8 | $ - 0 | |
| 16 | 300-06000 | Aggregate Base Course (Class 6) | TON | 200 | $ - 0 | |
| 17 | 300-08000 | Aggregate Base Course (Shouldering Material) | TON | 250 | $ - 0 | |
| 18 | 500-00805 | Concrete Flatwork (8 Inch) | SY | 74 | $ - 0 | |
| 19 | 500-00905 | Concrete Flatwork (Stair) | LS | 1 | $ - 0 | |
| 20 | 500-01050 | Concrete Sidewalk (5 Inch Fiber Reinforced) | SY | 5,020 | $ - 0 | |
| 21 | 500-58000 | Concrete Curb Head (8 Inch) | LF | 435 | $ - 0 | |
| 22 | 530-52000 | Fence (Split-Rail) | LF | 1,791 | $ - 0 | |
| 23 | 540-00205 | Stair Railing | LS | 1 | $ - 0 | |
| 24 | 636-01000 | Reinforced Concrete Collar | EA | 9 | $ - 0 | |
| 25 | 814-00010 | Sign Panel (Class I) | SF | 7 | $ - 0 | |
| 26 | 814-20200 | Steel Sign Post (2 Inch Square Punched) | EA | 1 | $ - 0 | |
| 27 | 820-00020 | Sanitary Facility | EA | 0.25 | $ - 0 | |
| 28 | 825-00000 | Construction Surveying | LS | 0.25 | $ - 0 | |
| 29 | 900-00205 | Topsoil | CY | 645 | $ - 0 | |
| 30 | 901-00003 | Rock Socks | LF | 130 | $ - 0 | |
| 31 | 901-00005 | Sediment Control Log | LF | 950 | $ - 0 | |
| 32 | 901-00045 | Concrete Washout Structure | EA | 2 | $ - 0 | |
| 33 | 901-00051 | Inlet Protection (Sump Inlet) IP-2 | EA | 2 | $ - 0 | |
| 34 | 901-00052 | Inlet Protection (On-grade) IP-1 | EA | 1 | $ - 0 | |
| 35 | 901-00070 | Vehicle Tracking Control | EA | 2 | $ - 0 | |
| 36 | 901-01622 | Sweeping (Pickup Broom) | HR | 25 | $ - 0 | |
| 37 | 902-00006 | Seeding (Native) With Soil Preparation | AC | 0.8 | $ - 0 | |
| 38 | 903-00061 | Mulch Tackifier | LB | 80 | $ - 0 | |
| 39 | 906-00001 | Erosion Control Blanket (Class 1) | SY | 3895 | $ - 0 | |
| 40 | 990-70010 | F/A Minor Contract Revisions | FA | 1 | $ 40,000.00 | $ 40,000.00 |
| TOTALS (please calculate total bid) | $ 40,000.00 |
File details come from the government source that posted it. Updated .