This is a Specialized Experience Supplemental Information form template for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for Architect-Engineer (A/E) services. The form requests documentation of specialized experience through up to ten example projects demonstrating the firm's qualifications in utility design and engineering work.
For each project example, firms must provide: project title and location; design completion year (excluding PCAs); estimated construction completion year; project role (Prime A/E, Design-Build Designer of Record, or Sub Consultant); construction cost excluding A/E design fees; A/E firm name or joint venture information; and project type classification (New Construction or Repair). The form requires firms to identify the delivery method used (Design-Bid-Build, NAVFAC Design-Build RFP, Design-Build DOR, or Engineering Studies) and to check all applicable engineering disciplines involved, including Civil, Electrical, Telecom, Architect, Structural, Mechanical, Fire Protection, Geotech, and Fuels/POL. Additionally, firms must identify relevant project types from a comprehensive list including water treatment, wastewater collection and treatment systems, storm drainage systems, utility switching stations, electrical primary and secondary distribution systems, power generation, alternative energy systems, pump stations, utility substations, and telecommunications systems for facilities. This template serves as the standardized submission format for evaluating bidders' past experience and technical capabilities for the Navy's utility projects contract solicitation N6247826R5049, with responses due by June 9, 2026 at 2:00 p.m. Hawaii Standard Time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SBSA Utilities 26R5049 Attach_(B)_Key_Personnel.docx | DOCX document | |
| SBSA Utilities 26R5049 Attach_(C)_PPQ.docx | DOCX document | |
| N6247826R5049SYNOPSIS_SBSA UTILITIES_04MAY2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT (A)
SPECIALIZED EXPERIENCE SUPPLEMENTAL INFORMATION
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 1 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
(NOT INCLUDING PCAS)
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER TREATMENT
WATEWATER COLLECTION SYSTEMS
STORM DRAINAGE SYSTEMS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
WATER DISTRIBUTION SYSTEMS
WASTEWATER TREATMENT SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
ALTERNATIVE ENERGY SYSTEMS
WATER PUMP STATIONS
WASTEWATER PUMP STATIONS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 2 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER TREATMENT
WATEWATER COLLECTION SYSTEMS
STORM DRAINAGE SYSTEMS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
WATER DISTRIBUTION SYSTEMS
WASTEWATER TREATMENT SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
ALTERNATIVE ENERGY SYSTEMS
WATER PUMP STATIONS
WASTEWATER PUMP STATIONS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 3 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER TREATMENT
WATEWATER COLLECTION SYSTEMS
STORM DRAINAGE SYSTEMS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
WATER DISTRIBUTION SYSTEMS
WASTEWATER TREATMENT SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
ALTERNATIVE ENERGY SYSTEMS
WATER PUMP STATIONS
WASTEWATER PUMP STATIONS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 4 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER TREATMENT
WATEWATER COLLECTION SYSTEMS
STORM DRAINAGE SYSTEMS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
WATER DISTRIBUTION SYSTEMS
WASTEWATER TREATMENT SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
ALTERNATIVE ENERGY SYSTEMS
WATER PUMP STATIONS
WASTEWATER PUMP STATIONS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 5 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER TREATMENT
WATEWATER COLLECTION SYSTEMS
STORM DRAINAGE SYSTEMS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
WATER DISTRIBUTION SYSTEMS
WASTEWATER TREATMENT SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
ALTERNATIVE ENERGY SYSTEMS
WATER PUMP STATIONS
WASTEWATER PUMP STATIONS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 6 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER TREATMENT
WATEWATER COLLECTION SYSTEMS
STORM DRAINAGE SYSTEMS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
WATER DISTRIBUTION SYSTEMS
WASTEWATER TREATMENT SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
ALTERNATIVE ENERGY SYSTEMS
WATER PUMP STATIONS
WASTEWATER PUMP STATIONS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 7 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER TREATMENT
WATEWATER COLLECTION SYSTEMS
STORM DRAINAGE SYSTEMS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
WATER DISTRIBUTION SYSTEMS
WASTEWATER TREATMENT SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
ALTERNATIVE ENERGY SYSTEMS
WATER PUMP STATIONS
WASTEWATER PUMP STATIONS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 8 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER TREATMENT
WATEWATER COLLECTION SYSTEMS
STORM DRAINAGE SYSTEMS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
WATER DISTRIBUTION SYSTEMS
WASTEWATER TREATMENT SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
ALTERNATIVE ENERGY SYSTEMS
WATER PUMP STATIONS
WASTEWATER PUMP STATIONS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 9 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER TREATMENT
WATEWATER COLLECTION SYSTEMS
STORM DRAINAGE SYSTEMS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
WATER DISTRIBUTION SYSTEMS
WASTEWATER TREATMENT SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
ALTERNATIVE ENERGY SYSTEMS
WATER PUMP STATIONS
WASTEWATER PUMP STATIONS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 10 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER TREATMENT
WATEWATER COLLECTION SYSTEMS
STORM DRAINAGE SYSTEMS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
WATER DISTRIBUTION SYSTEMS
WASTEWATER TREATMENT SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
ALTERNATIVE ENERGY SYSTEMS
WATER PUMP STATIONS
WASTEWATER PUMP STATIONS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
File details come from the government source that posted it. Updated .