SBR-T5__10-28-1968_Rail.pdf

PDF 4 MB Posted

Attached to
I-90 Bridge Rail Repair
Solicitation number
MDT-315146-NO
Issued by
Montana

About this file

This is a standard steel bridge rail technical drawing (Drawing No. SBR-T5) prepared by the State of Montana State Highway Commission for Type No. 5 standard steel bridge rail design. The detailed schematic provides comprehensive engineering specifications for bridge rail components, including end post and terminal sections, sleeve expansion joints, rail splices, anchor bolt assemblies, and anchor plate details. The drawing includes multiple scaled views and cross-sections with precise measurements and construction notes, indicating specific technical requirements for steel bridge rail installation and construction.

The technical drawing includes detailed notes specifying material requirements, such as using high-tensile strength bolts, structural tubing, and galvanized components. The design appears standardized for state highway bridge infrastructure, with precise engineering specifications to ensure consistent rail installation across Montana's highway system. The drawing is dated 10-28-1968, suggesting it is a historical engineering standard that may have been referenced for the I-90 Bridge Rail Repair project, providing technical guidance for rail repair or replacement specifications.

View the file

Other files

File Type Posted
I-90-309EB_RAIL_SPECIALS_final.docx DOCX document
as-built_Draw-no-9027.pdf PDF
Wage Rates_2023.pdf PDF
1132763-event.pdf PDF
Transition rail rehab as-builts.pdf PDF
as-built_Draw-no-9007.pdf PDF
as-built_Draw-no-9026.pdf PDF
MRL Bridge work_Requirements.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .