August 12, 2016

Dear Prospective Quoter:

SUBJECT: Solicitation Number SBN15016R0001 – Maintenance of water Treatment of HVAC and Potable water systems at NEC.

The Embassy of the United States of America invites you to submit a proposal for preventive maintenance of water treatment of HVAC and potable water systems at NEC.

Enclosed is a Request for Proposal (RFP) for maintenance of domestic water systems at NEC. If you would like to submit a proposal, follow the instructions in Section 4 of the solicitation and complete the required portions of the Standard Form 1449.

Your quotation must be submitted in a sealed envelope marked "Quotation Enclosed" to the attention of:

General Services Officer Boulevard de la Marina, 01 BP 2012, Cotonou, Benin CotonouGSOBids@State.gov

On or before 11:00 am local time September 12, 2016. No quotation will be accepted after this time. Embassy encourages submission of electronic version to the email address cited above.

In order for a quotation to be considered, you must also complete and submit the following:

1. SF-1449

2. Section 1 pricing;

3. Section 5, Representations and Certifications;

4. Additional information as required in Section 3.

The successful offeror(s) will be required to have a DUNS number and be registered in SAM/CCR through the following sites: DUNS – www.dnb.com and SAM/CCR www.sam.gov .

Direct any questions regarding this solicitation to the Contracting Officer Amber J McCoy by letter or by telephone number +229 21-300-650 during regular business hours or by email at CotonouGSOBids@state.gov.

Sincerely, David Treleaven Facility Manager

TABLE OF CONTENTS

Section 1 - The Schedule

· SF 1449 cover sheet

· Continuation To SF-1449, RFQ Number SBN15016R0001, Prices, Block 23

· Continuation To SF-1449, RFQ Number SBN15016R0001, Schedule Of Supplies/Services, Block 20 Description/Specifications/Work Statement

· Exhibit A – Statement of Work: HVAC Water Treatment System

· Exhibit B – Statement of Work: Potable Water Treatment System Section 2 - Contract Clauses

· Contract Clauses

· Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12

Section 3 - Solicitation Provisions

· Solicitation Provisions

· Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in Part 12

Section 4 - Evaluation Factors

· Evaluation Factors

· Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in Part 12

Section 5 - Representations and Certifications

· Offeror Representations and Certifications

· Addendum to Offeror Representations and Certifications - FAR and DOSAR Provisions not Prescribed in Part 12

1. SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

PAGE 1 OF

2. CONTRACT NO.

3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

5. SOLICITATION NUMBER

SBN15016R0001

6. SOLICITATION ISSUE DATE

08/12/2016

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME David Treleaven

b. TELEPHONE NUMBER(No collect calls) +229 2136 7523 CotonouGSOBids@State.gov

8. OFFER DUE DATE/ LOCAL TIME

09/12/2016 11:00AM Local Time

9. ISSUED BY CODE

10. THIS ACQUISITION IS
|X| UNRESTRICTED OR
|_| SET ASIDE:____ % FOR:

AMERICAN EMBASSY COTONOU

MARINA AVENUE

|_| SMALL BUSINESS
|_| WOMEN-OWNED SMALL BUSINESS

COTONOU, REPUBLIC OF BENIN

|_| HUBZONE SMALL

BUSINESS

|_| (WOSB) ELLIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM NAICS:

|_| SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

|_| EDWOSB

|_| 8 (A)
SIZE STANDARD:

11. DELIVERY FOR FOB DESTINAT-

TION UNLESS BLOCK IS

MARKED

|_| SEE SCHEDULE

12. DISCOUNT TERMS
|_| 13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

|_| RFQ |_| IFB |X| RFP

15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE

American Embassy Marina Avenue Cotonou, Republic of Benin

General Services Office American Embassy Cotonou Cotonou, Benin

17a. CONTRACTOR/

OFFERER

TELEPHONE NO.

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

FINANCIAL MANAGEMENT OFFICE

AMERICAN EMBASSY COTONOU

COTONOUDBO@STATE.GOV

CODE

|_|17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED|_| SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

Preventive Maintenance Domestic Water Systems

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

|X| 27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
|X| ARE |_| ARE NOT ATTACHED
|_| 27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
|_| ARE |_| ARE NOT ATTACHED
|X| 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 03_ COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
|_| 29. AWARD OF CONTRACT: REF. _________________ OFFER DATED ____________. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print)

30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER (Type or print)

31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTIONSTANDARD FORM 1449 (REV. 02/2012)
PREVIOUS EDITION IS NOT USABLEComputer GeneratedPrescribed by GSA - FAR (48 CFR) 53.212
1.INTRODUCTIONComment by "%username%": Numbering corrected

1.1 The United States Department of State (DOS) requires services at the unclassified clearance level, to provide water treatment maintenance services at the new Compound, U.S. Embassy, Cotonou, Benin in accordance with this contract.

1.2 The water treatment systems to be maintained are as follows:

· HVAC Water Treatment System

· Domestic (Potable) Water Treatment System

1.3 The Overseas Buildings Operations (OBO) has a requirement to obtain water treatment maintenance services to execute this work, including logistics, customs, shipping, transportation, labor, water treatment chemicals, tools, water treatment testing kits/equipment, administrative and all associated management support functions. The water treatment service contract will include but not limited to combinations of physical methods, chemical methods, equipment servicing and testing to control water-related problems such as corrosion, scaling, general deposits, and microbiological fouling of the HVAC and potable water systems. All work shall comply with the requirements described in the following, as a minimum:

· National Sanitation Foundation (NSF) Standards

· American Water Works Association(AWWA) American National Standards Institute (ANSI) Standards

· Safety Data Sheets (SDS) Regulations American Society for Testing & Materials – D Standards (ASTM D)

· (National Fire Protection Association (NFPA) Codes

· Underwriters Laboratories (UL) Standards

· Institute of Electrical & Electronics Engineers (IEEE) Standards National Electrical Manufaturers Association (NEMA) Standards Occupational Safety & Health Administration (OSHA) StandardsAnd all applicable manufacturer Operation and Maintenance (O&M) and installation instructions/requirements.

OBJECTIVES

The purpose of this scope of work is to define the requirements for the planning, procurement, and maintenance of the HVAC and potable water systems located at the Embassy Compound. The intent of this service contract is to preserve the current piping, HVAC equipment, potable water systems, and sprinkler piping/equipment, and establish a cost effective water treatment program to control water related problems such as corrosion, scaling, general deposits, and microbiological fouling and meet water treatment goals. All work shall be executed in accordance with the project SOW, approved water treatment chemicals, associated contract documents and be compliant with all applicable safety, equipment and building codes and standards.

TYPE OF CONTRACT

This is a firm fixed price contract. No additional sums will be payable for any escalation in the cost of materials, equipment or labor, or because of the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required. The contract price will not be adjusted due to fluctuations in currency exchange rates.

The currency of this contract is ___________________ (Offeror to identify currency) Local companies shall offer in local currency.

PERIOD OF PERFORMANCE

The contract will be for a period of one (1) base year with four (4) 12-month option periods which will be exercised at the sole discretion of the Government.

PRICING

The rates below include all costs associated with providing preventive maintenance services in accordance with the attached scope of work, and the manufacturer’s warranty including materials, labor, insurance (see FAR 52.228-4 and 52.228-5), overhead, profit and Goods & Services Tax (GST) (if applicable).

Value Added Tax (VAT) is not applicable to this contract and shall not be included in the CLIN rates or Invoices because the U.S. Embassy Cotonou has a tax exemption certificate from Benin Republic government.

5.1 Base Year. The Contractor shall provide the services shown below for the base period of the contract and continuing for a period of 12 months.

CLIN
Description
Quantity of Equipment
Type of services
No. of service
Unit price / service
Total per year
001
Potable Water Treatment System
1

Semiannual

002
HVAC Water Treatment System
1

Total Base Year

5.2. Option Year 1. The Contractor shall provide the services shown below for Option Year 1 of the contract, and continuing for a period of 12 months.

CLIN
Description
Quantity of Equipment
Type of services
No. of service
Unit price / service
Total per year
101
Potable Water Treatment System
1
102
HVAC Water Treatment System
1

Total Option Year 1

5.3. Option Year 2. The Contractor shall provide the services shown below for Option Year 2 of the contract, and continuing for a period of 12 months.

CLIN
Description
Quantity of Equipment
Type of services
No. of service
Unit price / service
Total per year
201
Potable Water Treatment System
1
201-B
HVAC Water Treatment System
1

Seminnual

Total Option Year 2

5.4. Option Year 3. The Contractor shall provide the services shown below for Option Year 3 of the contract, and continuing for a period of 12 months

CLIN
Description
Quantity of Equipment
Type of services
No. of service
Unit price / service
Total per year
301
Potable Water Treatment System
1
302
HVAC Water Treatment System
1

Total Option Year 3

5.5. Option Year 4. The Contractor shall provide the services shown below for Option Year 4 of the contract, and continuing for a period of 12 months

CLIN
Description
Quantity of Equipment
Type of services
No. of service
Unit price / service
Total per year
401
Potable Water Treatment System
1
402
HVAC Water Treatment System
1

Total Option Year 4

5.6. Total for all years:Base Year__________
Option Year 1__________
Option Year 2__________
Option Year 3__________
Option Year 4__________
TOTAL__________

NOTICE TO PROCEED

After Contract award and submission of acceptable insurance certificates and copies of all applicable licenses and permits have been provided, the Contracting Officer will issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of ten (10) calendar days from date of Contract award unless the Contractor agrees to an earlier date) on which performance shall start.

GENERAL REQUIREMENTS

7.1 This statement of work (SOW) describes the preventive maintenance and testing services and deliverables to be performed by the Contractor at the new Compound, U.S. Embassy Cotonou, Benin.

7.2 The assigned Contracting Officer and Contracting Officer's Representative are the sole points of contact for all technical and contractual discussions or issues regarding the scope of work and its intent and execution. The Contractor shall take no direction verbal or otherwise from United States Government (USG) personnel other than the Contracting Officer or Contract Officer's Representative.

7.3 This Statement of Work requires the Contractor to provide site assessment and survey services, project management, professional water treatment services, water treatment logistics and material procurement services, preventive maintenance and testing services and scheduling services, and general support services for this water treatment maintenance contract.

7.4 All deliverables, documents, proposals, etc. submitted by the Contractor under this statement of work shall remain the property of the U.S. Government. All U.S. Government documents and data provided to the Contractor shall remain the property of the U.S. Government. The Contractor shall limit duplication and dissemination of all U.S. Government documents and Contractor developed documents under this statement of work to/within the Contractor’s execution team. Duplication or distribution of project documents outside the Contractor’s team is strictly prohibited without the express written approval and authorization of the contracting officer.

Upon completion of each service visit all documents, electronic media, photos, etc. shall be submitted to the Government, including all documents and data the Government provided to the Contractor. All service contract documents and media shall be submitted to the Government along with the Contractor’s service report.

The Contractor shall schedule, coordinate and arrange all work so as to cause the least interference with the normal occurrence of post operations. In those cases where some interference is unavoidable, the Contractor shall make every effort to minimize the impact of the interference and its effects on the occupants or users. All detailed work schedules required by this statement of work shall be electronically documented and updated and made available to the Contracting Officer's Representative (COR) upon request, oral or written. If the COR determines that the Contractor’s schedule conflicts with critical post operations, the Contractor shall modify the schedule as required.

7.5 The Contractor shall not use any method or substances which may cause damage to the equipment or systems. Any damage or loss through negligence and/or maintenance practices by the Contractor, Sub-contractor, or Contractor's staff shall be the entirely the responsibility of the Contractor. The U.S. Embassy, Cotonou, Benin will require the Contractor to repair/replace any damaged systems or pay for the cost of rectification. Comment by "%username%": If the contractor breaks something during his performance or recommended wrong water treatment chemicals, he will be responsible to repair or pay for the cost

7.6 The Contractor must, for the duration of the contracted Services, continue to maintain a quality control process which has been agreed to by the U.S. Embassy, Cotonou, Benin COR and the Contractor.

PERFORMANCE CRITERIA

8.1 Performance Objective

The objective of this Contract is to provide, within the Term of this Contract, a professional level of service, which provides:

· US Embassy satisfaction in respect to the maintenance of water treatment systems and prompt reaction to any change in arrangements or operational requirements of the US Embassy;

· compliance with the statutory and regulatory provisions of the laws of the jurisdiction;

· best in class practices within the industry;

· risk reduction for the US Embassy;

· preservation of asset value; and

· reduction in operating costs.

The Service Contractor agrees that its performance under the Contract shall be measured against performance criteria specified in this document.

8.2 Performance Benchmarks

The Service Contractor must for the duration of the contracted Services continue to maintain a quality control process, which has been agreed by the US Embassy and the Service Contractor.

The Service Contractor must allow the US Embassy access to the quality control system as well as the relevant quality systems of its subcontractors so as to enable monitoring and quality auditing of the maintenance service.

The US Embassy may reject any aspect of the Services that fails to comply with the requirements of the Contract, or its quality system, at any time.

8.3 Performance Monitoring and Reporting

The Service Contractor shall monitor its own performance against the criteria and benchmarks identified in this document, and shall provide reports when required by the US Embassy.

SPECIFICATIONS

9.1 All equipment, chemicals, and testing procedures and kits shall be approved by the COR prior to use in the service contract.

9.2 The Contractor shall be responsible for submitting the manufacture specifications, and SDS sheets for all chemicals (including chemical composition). All SDS sheets shall be in both English and French languages. Comment by "%username%": Edited as Contractor is not installing nor providing any equipment.

as required.emove restrictiongstalling nor furnishing any equipment.e responsible to repair or payd

9.3 HVAC Water Treatment System:

9.3.1 The Contractor shall use a molybdate based corrosion and scale inhibitor designed for closed hot and chilled recirculating water systems. The molybdate shall be in a liquid form with a pH level ranging from 10.8 to 12.5. The density of the molybdate shall be between 1.03 to 1.07 kg/L. The molybdate shall not contain any sodium nitrites. The chemicals shall be compatible with propylene glycol. The chemical composition of the molybdate shall contain at the minimum the following chemicals: Sodium Molybdate, Sodium Hydroxide, Sodium Tetraborate, and Pentahydrate.

9.3.2 The Contractor shall provide propylene glycol and maintain a 30% concentration in the chilled water systems. The glycol shall contain propylene with inhibitors and meet all specification requirements as the “Dowfrost” by Dow Chemical Company or approved equal.

9.3.3 The hot water / chilled water filter media shall be rated at 98 percent efficiency for 20 micrometer particulates. The filters shall fit in the Embassy’s current filtration unit.

9.3.4 The hot and chilled water shall be maintained with the parameters specified in Exhibit A HVAC Water Treatment Systems Statement of Work

9.4 Potable Water Treatment System:

9.4.1 The potable water shall be maintained with the parameters specified in Exhibit B Domestic (Potable) Water Treatment Systems Statement of Work

SAFETY HEALTH AND ENVIROMENTAL MANAGEMENT (SHEM)

10.1 The Service Contractor shall take all reasonable and proper safety precautions to prevent death or injury to any person or damage to any property at the US Embassy Cotonou Compound and in particular all equipment used by the Service Contractor shall be used in such a manner and maintained so as to minimize the danger of accident, death, injury, loss or damage arising from the use of such equipment. In addition to relevant statutory requirements, standards and other provisions of this Contract, the Service Contractor shall have the following requirements:

· Proper disposal of toxic substances where applicable.

· The Service Contractor’s personnel shall be knowledgeable with and adhere to all relevant occupational health and safety legislation and MSDS sheets.

· All electrical equipment and associated materials for the Services Contract comply with UL requirements.

· Follow all NFPA guidelines against fire, production of smoke or the venting of any noxious substances

· Ensure that the Service Contractor’s personnel comply with all safety procedures and requirements

· Ensure that the Service Contractor’s personnel are adequately trained and instructed in the safe and correct usage, handling and operation of materials and equipment relevant to the Services and provide reasonable proof of such to the US Embassy Cotonou on request.

· Ensure the Service Contractor’s personnel are certified as having completed occupational health and safety training and have been issued all the necessary Personal Protection Equipment (PPE) required for safe implementation of this contract;

· Training program(s) shall be presented and must satisfy the US Embassy Cotonou during the submittal process.

MAINTENANCE SPECIFICATION DETAILS

11.1 Precedence of Specifications. If and to the extent that there is an inconsistency between this maintenance specification and any Manufacture’s maintenance specification, the Manufacture’s maintenance specification shall prevail.

11.2 Hours of Work. The Service Contractor shall schedule all preventive maintenance during normal working hour which are defined as 8:00am to 5:30pm Monday thru Thursday and 7:30am to 1:30pm on Fridays, inclusive of periodic maintenance that may be required on Saturdays, with the exception of any regular or special public holidays on which the US Embassy Compound is not open, or as agreed with the US Embassy prior to commencement of the contract.

SCOPE OF WORK

12.1 The water treatment Contractor shall provide both the required chemical products and necessary services to apply the chemicals, monitor their performance, and report the results. The water treatment service contract shall 1) preserve the interior waterside of current piping in order to protect the HVAC equipment, potable water systems, and sprinkler piping/equipment, 2) reduce operating costs and establish a cost effective water treatment program to control water related problems such as corrosion, scaling, general deposits, and microbiological fouling, and 3) ensure the proper operation of water treatment equipment.

12.2 The support service water treatment program shall consist of the embassy facility management staff conducting routine (daily, weekly, monthly, quarterly, and semi-annually) water treatment tests and control of the HVAC and potable water treatment systems and emailing the results to the water treatment Contractor on a weekly basis. The Contractor shall then be responsible for conducting a technical analysis of the weekly water treatment testing results from the embassy. The Contractor shall then respond to the embassy within 24 hours to direct the embassy facility management staff to make any changes to the chemical dosages and/or equipment operations as necessary.

12.3 The water treatment Contractor shall visit the embassy on a semiannual basis at 3 days consecutive intervals. The Contractor shall be responsible for all logistics including but not limited to transportation and hotel reservations for their staff.

12.4 The water treatment Contractor shall provide the chemicals necessary for the operation of the HVAC Water Treatment system to include, but no limited to, liquid form molybdate and propylene glycol. Chemicals should have a storage life expectance of at least 1 year. In the case of the Potable Water Treatment system, the US Embassy’s Facilities Maintenance staff is responsible for maintaining recommended quantities of chemicals and other consumable and expendable supplies such as filters. The contractor will develop a complete list of the necessary chemicals as well as other consumable and expendable supplies the Facilities Maintenance must maintain on hand. The contractor will develop min-max stock levels for all chemicals, consumables, and expendables.

12.5 The water treatment Contractor shall establish minimum and maximum control ranges for each treatment chemical and avoid unnecessary high levels of chemicals to mitigate cost and adverse chemical reactions from improper high level chemical dosage.

12.6 The water treatment Contractor shall perform the required services as described in the following SOW attachments, as applicable:

Exhibit A – HVAC Water Treatment System Exhibit B – Potable Water Treatment System

12.7 The water treatment Contractor shall provide 4 hours of familiarization annually in both English to acquaint operators in the necessary water treatment tests, the control ranges for each treatment chemical, safe handling of equipment and chemicals, and new water treatment procedures/technologies.

12.8 The water treatment Contractor shall review the facility water treatment logs and the operating logs to verify the chemicals levels are within design parameters.

12.9 The water treatment Contractor shall discuss the water treatment conditions with the Facility Manager and operating engineers on a monthly basis and follow up with a written service report within 2 business days after each visit. The report shall be in English and contain the results of water treatment Contractor’s on-site and laboratory tests, comment on the status of each system, and specific recommendations for action if necessary.

ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT

13.1 The Contractor shall designate a representative who shall supervise the Contractor’s technicians and be the Contractor's liaison with the US Embassy Cotonou. The Contractor's employees shall be on-site only for contractual duties and not for any other business or purposes. Contractor employees shall have access to the systems dedicated rooms with or without security escorts, only with specific permission by the Facility Manager, Contracting Officer, or the COR.

13.2 Personnel security: The US Embassy reserves the right to deny access to U.S owned and U.S.-operated facilities to any individual. The Contractor shall provide the names, biographic data and police clearance on all Contractor personnel, who shall be used on this contract prior to their utilization on this contract. It is recommended that U.S. contractor personnel complete a 5 hour online training course; High Threat Security Overseas Seminar (HTSOS).

13.2.1 Security Clearances: Security clearances are not a requirement for performance on this contract, as there will be no access to classified information or areas. Comment by "%username%": Inserted, from Elena

13.3 Standards of Conduct.

13.3.1 General: The Contractor shall maintain satisfactory standards of employee competency, conduct, cleanliness, appearance, and integrity and shall be responsible for taking such disciplinary action with respect to employees as necessary. Each Contractor employee shall adhere to standards of conduct that reflect credit on themselves, their employer, and the United States Government. The US Embassy reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The Contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the Government.

13.3.2 Uniforms and Personal Equipment. The Contractor's employees shall wear clean, neat and complete uniforms when on duty. The Contractor shall provide, to each employee and supervisor, uniforms and personal equipment. The Contractor shall be responsible for the cost of purchasing, cleaning, pressing, and repair of the uniforms.

13.3.3 Neglect of Duties. Neglect of duties shall not be condoned. This includes sleeping while on duty, unreasonable delays or failures to carry out assigned tasks, conducting personal affairs during duty hours and refusing to render assistance or cooperate in upholding the integrity of the worksite security.

13.3.4 Intoxicants and Narcotics. The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances which produce similar effects.

EXHIBIT A

Statement of Work HVAC Water Treatment Systems

I. GENERAL INFORMATION:

The United States Embassy in Cotonou requires professional services to perform preventive maintenance services of the facility’s HVAC Water Treatment Systems.

II. PROJECT REQUIREMENTS:

· HVAC System Description: Cooling-Loop system: One bypass feeder on each system with isolating and drain valves downstream from circulating pumps, unless otherwise indicated.

· Introduce chemical treatment through bypass feeder when required or indicated by test.

· Test Source water quality in accordance with the AWWA RTW analysis to determine the CCPP, Ryznar Index, Aggressiveness Index, and Langelier Index. Use the RTW analysis to determine the proper chemical balance to prevent corrosions and scaling.

· Maintain water quality for HVAC systems that controls corrosion and build-up of scale for maximum efficiency of installed equipment without posing a hazard to operating personnel or the environment.

· Base chemical treatment performance requirements on quality of water available at Project site, HVAC system equipment material characteristics and functional performance characteristics, operating personnel capabilities, and requirements and guidelines of authorities having jurisdiction.

· Closed System: Maintain system essentially free of scale, corrosion, and fouling tosustain the following water characteristics:

a. pH: 7.0 to 10.0.

b. Chilled Water Corrosion: 50 to 100 PPM (as Molybdate).

c. Heating Hot Water Corrosion: 100 to 150 PPM (as Molybdate).

· Primary and Secondary Chilled Water Loop 3,482 liters or 920 gallons

DESCRIPTION OF EQUIPMENT *:

*Please see attachment at the end of this sheet for more details
III.GENERAL REQUIREMENTS:

The Contractor shall provide all labor, tools, and materials required to carry out all preventive maintenance of HVAC Water Treatment Systems.

US Embassy staff may have service manuals for all equipment included in HVAC water treatment systems. If they do not, the Contractor shall assist Embassy Staff in obtaining the manuals.

IV. SCOPE OF WORK - PREVENTIVE MAINTENANCE

Contractor shall provide all materials, supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post Occupation Safety and Health Officer (POSHO). Safety Data Sheets (SDS) shall be provided by the Contractor for all HAZMAT materials. Copies shall be provided to the COR for approval.

At a minimum, the following work shall be accomplished:

HVAC Water Treatment Preventive Maintenance (PM)

Semiannually (2 times per year):

Water Treatment System, Closed Loop

i. Safety & Special Instructions:

1. Chemicals must comply with the Environmental Protection Agency (EPA) regulations and handled in accordance with occupational safety requirements. Employ personal protection against corrosive or hazardous treatment chemicals as appropriate.

2. Be familiar with the Safety Data Sheets of any chemicals used in the water treatment program.

3. Water treatment specialists must be properly trained and certified.

4. Water treatment must be based on proven standard engineering practices.

5. Follow treatment as directed by manufacturer and in accordance with requirements specified under Section 10.

6. Maintenance includes chemicals, chemical feeding, maintaining proper water conditions, controlling bleed off, protecting idle equipment, and record keeping.

7. Ensure chemicals are properly stored; test equipment clean, and that chemicals have not passed expiration date.

8. Maintain records and test results.

9. All tests shall conform to the manufacturer test procedures and standard values.

ii. Maintenance Description:

1. Inspect system and complete water analysis.

2. Monitor and test corrosion coupons (every 90 days for mold steel and copper coupons)

iii. Maintenance Procedures:

1. Sample water from the closed loop system per manufacturer’s recommendations.

2. Test for the proper levels of chemicals in the closed loop system and adjust chemical feeds as necessary to maintain optimal conditions in the system.

3. Record test results in a logbook.

4. Use the conductivity meter to test for total solids and plot in a logbook. Record and analyze abnormal changes.

5. Check the total conductivity of the system with a conductivity meter. Record results in a logbook.

6. Check pH with the pH test strips and/or pH meter.

7. Clean sample bottles and wipe down all chemical treatment equipment.

8. Change corrosion coupons. Send used coupons to the laboratory for analysis. Contractor to supply written coupon corrosion test report to the Facilities Manager within fourteen (14) calendar days after analysis.

iv. Process Instrumentation Engineer Checks and Adjustments

1. Visual inspection for the controller, sensor, pumps, tubing and other accessories

2. Testing of the chemical parameters

a. pH

b. Total dissolved solids

c. Conductivity

d. Aerobic Plate Count

e. Corrosion Inhibitor Level

f. Biocide dosage of both the Biocides

g. Test supply water for base conditions (iron, manganese, alkalinity, total hardness, silica chloride)

3. Calibration of the sensor with known standard

4. Process calibration of conductivity by a calibrated instrument with a known standard

5. Make sure that the controller is functioning properly.

6. Make sure that the solenoid valves, contact water meter, inhibitor pump and biocide pumps are physically functioning properly as per the settings in the controller.

7. Make sure that the chemical is dosed only as per the specification

8. Submit service report with detailed description of errors and causes (if any) and corrective action taken.

The water treatment Contractor shall determine the dosage levels of chemicals and stay within the specified operating parameters:

Parameters
Maintenance Levels
Open System
Closed System
Corrosion on mild steel
Less than 2.0 mpy
Less than 1.0 mpy
Pitting attack on mild steel
None
None
Corrosion on copper alloys
Less than 0.2 mpy
Less than 0.1 mpy
Scaling and deposition
None
None
Microbiological fouling
1. No visible deposits

2. No health hazards

3. Total aerobic count less than 10,000/ml

1. No visible deposits

2. No health hazards

3. Total aerobic count less than 10,000/ml

List of Equipment:

Control Panel and Valves
Manufacturer
Model
Number
Specifications
Location
Valves & Switches
WATTS
LF 25AUB Z3
740
SET: 25- 75PSI
NOB 3RD FL MECH RM 31M1
Valves & Switches
WATTS
M1
740
SET: 50PSI
NOB 3RD FL MECH RM 31M1

Filtration/Water Treatment Equipment

Filtration and Membranes
Manufacturer
Make
Model
Number
Specifications
Location
Micron rating ()
Absolute or nominal
Replaceable Filter Media
GUARDIAN IPCO
NEPTUNE
Fine
106453
5micron

NOB 3RD FL MECH RM 31M1

Chemical Feeding
Manufacturer
Make
Model
Number
Specifications

(Media) Location

Chemical Pot Feeder
GUARDIAN IPCO
NEPTUNE
FTF-

5DB FEEDER

CUSTOMIZED MOLYBDATE
NOB 3RD FL MECH RM 31M1
Chemical
Manufacturer
Make
Model
Number
Specifications

Location

System Cleaner
Guardian-IPCO

GI#415

Corrosion Inhibitor
Guardian-IPCO

GI#379

Maintain treatment residual in the range of 50-ppm to 100-ppm as Molybdate.

Pumps
Manufacturer
Model Number
Serial Number
Capacity
Electrical
PUMP, N-CHP-1 (PRI LOOP- CHIL WTR)
BELL AND GOSSETT
1510 BF 9.25

3BC

PRD11716-1
385GPM
7.5HP
PUMP, N-CHP-2 (PRI LOOP- CHIL WTR)
BELL AND GOSSETT
1510 BF 9.25

3BC

PRD11716-2
385GPM
7.5HP
PUMP, N-CHP-3 (PRI LOOP- CHIL WTR)
BELL AND GOSSETT
1510 BF 9.125

3BC

PRD11714-1
615GPM
15HP
PUMP, N-CHP-4 (PRI LOOP- CHIL WTR)
BELL AND GOSSETT
1510 BF 9.125

3BC

PRD11714-2
615GPM
15HP

EXHIBIT B

Statement of Work Domestic (Potable) Water Treatment System

I. GENERAL INFORMATION:

The United States Embassy in Cotonou requires professional services and contractor cost proposals to perform preventive maintenance services of the facility’s Potable Water Treatment System.

II. PROJECT REQUIREMENTS:

· Description: See below at the end of this section a complete description of the sequence of the operation of the Domestic Water Treatment System installed in US Embassy, Cotonou

· Volume: Domestic Water 25,000liters or 6604 gallons

DESCRIPTION OF EQUIPMENT *:
* Please see attachment at the end of this Exhibit A sheet for examples
III.GENERAL REQUIREMENTS:

The Contractor shall be responsible for labor, tools, and materials required to carry out all preventive maintenance of Potable Water Treatment System. Embassy staff should have service manuals for all equipment included in the maintenance of potable water treatment system. If they do not, the Contractor shall assist Embassy Staff in obtaining the manuals and ensure they have been received.

IV. SCOPE OF WORK - PREVENTIVE MAINTENANCE

Contractor shall provide all materials, supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post Occupation Safety and Health Officer (POSHO). Safety Data Sheets (SDS) shall be provided by the Contractor for all HAZMAT materials. Copies shall be provided to the COR for approval.

At a minimum, the following work must be done:

Semiannually (2 times per year):

Booster Pumps

i. Safety & Special Instructions:

1. Perform applicable lockout/tag-out steps of site safety procedures.

2. Schedule outage with operating personnel.

3. Follow site and manufacturer’s safety procedures.

4. Record and report equipment damage or deficiencies.

5. Obtain and review manufacturer operation and maintenance instructions.

6. All tests shall conform to the manufacturer test procedures and standard values.

ii. Maintenance Description:

1. Clean and inspect the booster pump.

2. Clean and inspect motor.

3. Lubricate motor.

iii. Maintenance Procedures:

1. Tag out unit.

2. Clean and inspect pump.

a. Clean accumulated dirt and grime from pump casing, shaft coupling, and motor.

b. Inspect electrical wiring, motor, and controls for signs of over-heating, broken insulation, loose or corroded connections, or damaged conduit.

c. Check for evidence of leaks.

d. Check alignment of coupling and security of base-plate mounting bolts.

3. Lubricate pump (if applicable).

4. Conduct operational test of the circulating pump.

a. Start pump. Check flanges and fittings for leaks.

b. Check for unusual noise or vibration.

c. Return the unit to service.

5. Check the motor.

a. Inspect electrical wiring, motor, and controls for signs of over-heating, broken insulation, loose or corroded connections, or damaged conduit.

b. Meggar check motor, record results.

c. Check running current and voltage for each phase, record results.

6. Lubricate the motor (if applicable). NOTES: DO NOT OVERGREASE THE MOTOR. USE MOTOR RATED GREASE. DO NOT USE PUMP GREASE IN THE MOTOR.

Semiannually (2 times per year) :

Potable Water Treatment System

i. Safety & Special Instructions:

1. Schedule outage with operating personnel.

2. Follow site and manufacturer’s safety procedures.

3. Record and report any equipment damage or deficiencies found during this maintenance task.

4. Record all test results in the component maintenance log.

5. Obtain and review manufacturers operation and maintenance instructions.

ii. Maintenance Description:

1. Check the system for proper performance.

2. Service the system.

3. Check the backwash flow controller for proper operation.

4. Evaluate filter media for replacement (as applicable)

iii. Maintenance Procedures (General)

1. Cycle the backwash flow controller and verify proper operation (as applicable).

2. Evaluate any media for replacement.

3. Conduct water quality testing to verify maintenance of water quality treatment goals as specified by section 10 of this contract. Have treated water tested by a certified laboratory for an analysis of the following parameters: pH, alkalinity, aluminum, calcium, copper, bromide, fluoride, nitrite, nitrate, orthophosphate, silica, strontium, iron, manganese, lead, magnesium, sodium, chloride, total hardness, total dissolved solids (TDS), turbidity, free chlorine, coliform bacteria, HPC, and temperature.

iv. Maintenance Procedures

1. Check backwash filter

2. Check softening

3. Flush softening

4. Check dosage/metering

5. Adjust dosage/metering

6. Measure water hardness and adjust system to achieve desired hardness level.

7. Measure water conductivity

8. Measure water pH number

9. Check pressure gauges for proper operation

10. Check density of brine solution in salt tank

11. Check operation of float control in brine

12. Inspect water softening piping, fittings and valves for leaks

13. Lubricate valves and motors

14. Inspect softener base and brine tank for corrosion and repair as needed

15. Check operation of automatic fill valve in brine tank

16. Check electrical wiring and phasing

17. Check cleanliness

18. Check control system

19. Check system functioning

20. Measure turbidity, free chlorine residual, iron, manganese, total dissolved solids (TDS), alkalinity, and temperature of finished water

Controllers: Chemical and Other Treatment Processes (for example: Chlorine addition, Reverse Osmosis (R/O) treatment, pH adjustment, corrosion inhibitor addition), and Pumps (Circulation and Well)

i. Safety & Special Instructions

1. Schedule outage with operating personnel.

2. Perform applicable lockout/tag-out steps of site safety procedures.

3. Record and report equipment damage or deficiencies.

4. Review and follow the manufacturer OM instructions.

5. Record results in the equipment history log.

ii. Maintenance Description:

1. Clean and inspect controller.

2. Operational test controller.

iii. Maintenance Procedures:

1. Visually inspect for broken parts, contact arcing, or any evidence of overheating.

2. Check line and load connections for tightness (check manufacturer instructions for torque specifications).

3. Check mounting screws for tightness.

4. Check all control wiring connections for tightness.

5. Check all timers/clocks for proper operation.

6. Clean interior and exterior of cabinet.

7. Energize circuit and check operation of the controller. Verify each controlled circuit operates properly.

8. Replace burned out pilot lights. Check alarm and remote indicators where applicable.

9. Evaluate UPS Power supplies for replacement.

Pump, Water (Submersible)

i. Safety & Special Instructions:

1. Schedule outage with operating personnel.

2. Follow site and manufacturer’s safety procedures.

3. Record and report any equipment damage or deficiencies found while performing this maintenance task.

4. Record all test results in the component maintenance log.

5. Obtain and review manufacturer operating and maintenance instructions.

6. All tests shall conform to the manufacturers test procedures and standard values.

ii. Maintenance Description:

1. Test the pump. (Semiannually)

iii. Maintenance Procedures:

1. Inspect electrical wiring for damage.

2. For recirculation pumps, verify pump is pumping at capacity.

3. For jockey pumps, verify pump is pumping at the required pressure.

4. Measure actual current draw and compare to nameplate readings.

5. Measure voltage at the pump and compare to nameplate readings.

6. Meggar test the motor.

Water Wells

i. Safety & Special Instructions:

1. Schedule work with operating personnel.

2. Follow site and manufacturer’s safety procedures.

3. Record and report any equipment damage or deficiencies found during this maintenance task.

4. Record all test results in the component maintenance log.

5. Obtain and review manufacturer operation and maintenance instructions.

ii. Maintenance Description:

1. Inspect the well-head casing and seals for cleanliness and water tightness integrity.

2. Perform a water chemistry and bacterial test.

iii. Maintenance Procedures:

1. Note any sources of potential well contamination and verify chemicals, fertilizers, fuel or oil, paint, etc., are not stored near the well. Maintain clearance of 50 to 100 feet between the well and buildings, parked cars or other vehicles, etc.

2. Check the well cover or well cap on top of the well casing to ensure it is in good repair.

3. Check that the casing is free of cracks.

4. Check that the sanitary seal is secure and watertight.

5. Check that the ground slopes away from the well for at least 15 feet in all directions.

6. Check all backflow preventers and anti-siphon devices to ensure water is not siphoning back into the well.

7. Provide backflow annual certification test.

8. Sample the well and send to a certified laboratory for chemical and bacteriological analysis. Bacteriological tests to include: total coliform, fecal coliform, E. coli, and heterotrophic plate count (HPC) bacteria. Chemical/Physical tests to include: pH, alkalinity, total dissolved solids (TDS), turbidity, total iron (Fe), total manganese (Mn), nitrate, nitrite, total hardness, and ammonia.

Water Tanks with Controls (Above and Underground)

i. Safety & Special Instructions:

1. Perform applicable lockout/tag-out steps of site safety procedures to ensure machinery will not start.

2. Schedule outage with operating personnel.

3. Follow site and manufacturer’s safety procedures.

4. Record and report to the post any equipment damage or deficiencies found while performing this maintenance task.

5. Record all test results in the component maintenance log.

6. Obtain and review manufacturer operation and maintenance instructions.

7. All tests shall conform to the manufacturer test procedures and standard values.

ii. Maintenance Description:

1. Test operation of sluice gate.

2. Operational test of the water tank

3. Test operation of controls.

iii. Maintenance Procedures:

1. Examine visible interior of tank including fittings, hatches, ladders, manholes, and hand-holes for signs of corrosion, and correct as indicated.

2. Clean, test and inspect sight glasses, valves, fittings, drains and controls.

3. Clean and inspect tank level control panel.

a. Clean exterior of panel and inspect front panel components for damage.

b. Clean interior panel components of dust and foreign material.

c. Inspect electrical wiring for damage and loose connections.

d. Inspect relays for damaged contacts and signs of over-heating.

4. Operational Test panel/electronic control units and mechanical level control equipment.

a. Verify that all alarm, control, and communication circuits operate correctly.

b. Verify that mechanical level indicating and control devices are functioning properly.

5. Look for presence of contamination (bugs, frogs, snakes, paper, plastic, etc.). Notify the post if found.

6. Tanks should be drained, cleaned, and disinfected as per current U.S. Department of State Guidelines (ALDAC 137958).

7. Return system to service.

The water treatment Contractor shall determine the dosage levels of chemicals and stay within the specified operating parameters:

Parameters
Maintenance Levels

For Maintenance of Potable Water Quality Treatment Goals

Chlorine Residual
0.2 – 0.5 mg/L in all parts of the distribution system
Microbiological and Chemical constituents
Treated water meets U.S. Environmental Protection Agency Primary and Secondary Drinking Water Regulations (40 CFR Parts 141-143)

For Maintenance of Piping and Equipment

Corrosion on mild steel
Less than 2.0 mpy
Pitting attack on mild steel
None
Corrosion on copper alloys
Less than 0.2 mpy
Scaling and deposition
None
Microbiological fouling
1. No visible deposits

2. No health hazards

3. Total Heterotrophic Plate Count (HPC) less than 500/CFU

Potable Water Treatment System Components and Equipment List:

Control Panel and Valves
Manufacturer
Make
Model
Specifications
Location

Panel Controls:

Chlorination Control Skid

WATER PROFESSIONALS

CUSTOMIZED
WATER

PROFESSIONALS

DWG 14272-01

UTIL PUMP RM U103

CNTLR, U-DWP-1 (DOM WTR BST)
TIGER FLOW

DVMV-259FA3(2) S6-VM-PVFD-

NSF

346825
UTIL PUMP RM U103

CNTLR, U-MWP-1 (CITY

PUMPS)

TIGER FLOW

DVMB 29F-C-S-

2-U-M P VFD

346921
UTIL PUMP RM U103

CNTLR, U-WTP-1 (PRESS

PUMPS)

TIGER FLOW

DVMV 29F-C-S-

2-V-M P VFD.UL

346826
UTIL PUMP RM U103

Water Treatment Skids/Equipment

Filtration and Membranes
Manufacturer
Make
Model
Number
Specifications
Location
Micron rating ()
Absolute or nominal
Bag Filtration
HARMSCO

BCB-1-2-STD

(DUPLEX)

1843 (TYP)
1

UTIL PUMP RM U103

Cartridge Filtration
HARMSCO

WB-40 SC-2 (6

FILTERS)

02280 (TYP)
5µ, 1 µ and 1 µ absolute

UTIL PUMP RM U103

Softening and Ion Exchange
Manufacturer
Make
Model
Number
Specifications

(Media) Location

Softening
HARMSCO

HF X N 150-

2CD-ASME

(DUPLEX)

T14677454

Iron/Manganese Removal
CULLIGAN

HF X N-242RASME

(DUPLEX)

T14677452

Storage
Number of Tanks
Material
Volume
Location

(above or below ground)

Raw Water Storage
2
400,000 liters
ABOVE

GROUND, CONCRETE

Finished Water Storage
1
25,000 liters
ABOVE

GROUND, CONCRETE

Pumps
Manufacturer
Model Number
Serial Number

Well

Booster
GRUNDFOS PUMPS

CORP

CR64-4-2 A-GA-E-HQQE
B98661882P114

230599

Booster
GRUNDFOS PUMPS

CORP

CR64-4-2 A-GA-E-HQQE
B98661882P114

230600

TANK, EXP UHT-1 (DOMESTIC WATER)
AMERICAN WHEATLEY
WBF-2000-200
2388-02
TANK, EXP UHT-1 (DOMESTIC WATER)
AMERICAN WHEATLEY
WBF-2000-200
2388-01

Sequence of Operations for Water Treatment for US Embassy Cotonou, Benin

The following is a sequence description which covers the step by step treatment process and the role each skid plays in the treatment scheme.

Water is currently supplied from either the city water main or a well water source. The water sources enter the building with a service valves for maintenance. Both water supplies are treated to meet primary and secondary EPA requirements for drinking water.

The treatment system is designed to treat either the municipal water supply or the well water supply. The water treatment system is designed to first treat a large volume of water which will be held in the Raw Water Cistern. The initial treatment removes sediment in the water and provides chlorination. This water is used as a storage basin for the Potable Water Treatment System, as well as Fire Protection and Irrigation. This cistern provides a 7 day water supply (Approximately 400,000L). The next phase of the treatment is designed to bring the Raw Water to EPA primary and secondary requirements for drinking water.

Once this water is treated, it is stored in the potable water cistern. Both cisterns are constantly circulated, monitored and maintained using the steps described below to prevent bacterial growth.

Initial Raw Water Treatment

Municipal Water Booster Pumps (Tag: U- MWP-1) The incoming water from the city water supply will pass through a duplex booster pump. This pump skid is designed to increase the water pressure and ensure that sufficient pressure is provided to overcome light dirt loading on the bag filters.

The pump skid consists of two pumps, each capable of producing 30 gpm at 50 psi. The pump system is designed to maintain a constant pressure in the line with VFD control. If the pressure drops due to a valve opening to fill the raw water cistern, the lead pump will automatically start and continue to run as long as the pressure is below the set…