SBIS_Industry Event_July 2021_Final 2021-07-27.pdf
PDF 2 MB Posted
- Attached to
- Engage with the FAA: Surveillance Broadcast and Information Services Virtual Industry Event - July 28, 2021
- Solicitation number
- Not on record
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SBIS_Industry Event_July 2021_Event Questions and Answers.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Aviation Administration
Federal Aviation Administration
Surveillance Broadcast and Information
Services (SBIS)
Industry Event
July 28, 2021
Federal Aviation Administration
Pamela Maxwell Surveillance Broadcast and
Information Services
Project Lead
3July 28, 2021 Surveillance Broadcast and Information
Services Industry Event
SBIS Industry Event
Welcome
Opening Remarks
Ground Rules
SBIS Acquisition Plans
Break
SBIS Systems Engineering
Break
SBIS Cost Estimates
Break
RFI-2 and Open Q&A
Closing
Pamela Maxwell
Dan Hicok
Phil Moyers
Pamela Maxwell
Andy Leone
Shahan Stepanian
Pamela Maxwell
Pamela Maxwell
Federal Aviation Administration
Dan Hicok Surveillance Services
Director
Federal Aviation Administration
Phil Moyers Surveillance Team
Contracting Officer
Contracts Highlights
• Questions during the event
• Posting of materials
• Proprietary information
• No acquisition sensitive information will be discussed today
• Recording of session
6Surveillance Broadcast and Information
Services Industry Event
Federal Aviation Administration
Pamela Maxwell Surveillance Broadcast and
SBIS Acquisition Highlights & Notional Timeline
Unrestricted, competitive procurement for
SBIS beyond 2025!
Targeting 2025 for
Contract Award.
Solution anticipated to remain operational through 2040.
Innovation is the name of the game!
New approaches are welcome.
Q1 Q2 Q3 Q4Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
2020 2021 2022 2023 2024 2025 2026+CY:
RFI #1
Release
P ro je c t
A c ti v it ie s
P ro c u re m e n t
M il e s to n e s
Industry
Day #1
RFI #2 /
Industry
Day #2
Industry
Engmt.
Partial Draft
SIR #1 /
Industry Day #3
Draft
SIR #2
Final
SIR
Contract
Award
J R
C
M il e s to n e s
IARD IID FID
Acquisition Strategy Analysis and Refinement
Transition and
Implementation
SIR Approval
SBIS Requirements and Document Development
Industry
Engmt.
Industry
Engmt.
Surveillance Broadcast and Information
SBIS RFI-2: Key Elements Things to know about RFI-2
There are three categories of RFI attachments: Existing SBS Documentation, Future SBIS Information, and SBIS RFI Response Fil es
The RFI covers: Acquisition Approach, Network/Communications, Transition, Enhancements and Innovation, Security/Resiliency, Cost
Service-Based
Acquisition
Utilizing FAA
Enterprise
Network Services
(FENS)
Other Transaction
Authority (OTA)
Contracts for
Oceanic / Remote
Areas and/or
Surveillance
Processing and
Networking (SPaN)
Transition
Approaches and
Risk Mitigation
Options, Rough
Order of
Magnitude (ROM)
Cost Estimates
Enhancements and Opportunities for Innovation
Responses Due
August 24, 2021
Surveillance Broadcast and Information
SBIS RFI-2: Acquisition Approach
The focus is to explore:
• A service-based acquisition alternative, using FENS, to deliver:
– Existing Services
– Enhancements
– Innovation Opportunities
Service Provider
• Owns & Operates
• Designs & Installs
• Meets Technical Performance Requirements
• Manages SBIS Configuration Management
• Maintains National Operations Center
(NOC)
FAA
• Approves the Design
• Owns the Data
• Controls Performance
Requirements
• Oversees Configuration Management
• Provides 24x7 Navigation and Surveillance Enterprise Control Center (NECC)
SBIS as a Service-Based Acquisition
Surveillance Broadcast and Information
Vendor Engagement
Oceanic and
Remote
Environments
Service Funding
Structures
Transition and
Operational Risk
Implications of
Using FENS
• Opportunities for innovation
• Suggestions for potential OTAs
• Mechanisms to support collaboration and cooperation among vendors
• Recommendations
(strategy / requirements) to provide services in oceanic and/or remote environments
• Recommended pricing construct
• Suggestions for performance incentives and disincentives
• Plans for efficient transition and implementation that minimizes risks and impacts to existing operations
• Plans for allocating performance requirements
(e.g., latency, timing, update interval)
• Plans to measure, monitor, report, and achieve / verify end-to-end performance
SBIS RFI-2: Acquisition Approach Associated RFI-2 Topics:
V.1.a V.1.b
V.1.c V.1.d
Seeking industry feedback on:
• Your recommended SBIS acquisition approach and architecture
• Your ideas for engagement to shape the future for SBIS
Surveillance Broadcast and Information
Any
Questions?
RFI Topics: Acquisition Approach, Network / Communications, Transition, Enhancements and Innovation, Security/Resiliency, Cost
Federal Aviation Administration
Andy Leone Surveillance and Broadcast
Services
Systems Engineering Lead
SBIS RFI-2: Network / Communications
The existing SBS network is a secured private network connecting the Ground Station and Control segments to
Service Delivery Points at FAA facilities.
Associated RFI-2 Topics:
V.2.a
V.2.b V.2.c
V.2.d
Service Delivery
Control Segment
Airspace Segment
Ground Station Segment
1090 ES A/V UAT A/V ATCRBS/Mode S A/V
Radio Station
Radio Station MLAT Radio Station
Control Station Control Station
FAA TIS-B Data SDPFAA ATC Automation S DP FAA Service Monitor S DP
MLAT Radio Station
NOC
Space-Based
ADS-B
Weather Data
S B
S P riv a te N e tw o rk
Existing SBS Network Architecture
S e c u rity G a te w a y
Surveillance Broadcast and Information
S e c u rity G a te w a y
SBIS RFI-2: Network / Communications
FAA Facilities
Control Segment
Airspace Segment
Ground Station Segment
1090 ES A/V UAT A/V ATCRBS/Mode S A/V
Radio Station
Radio Station MLAT Radio Station
Control Station Control Station
FAA Radar DataFAA ATC Automation FAA Service Monitor
MLAT Radio Station
NOC
Space-Based
ADS-B
Weather Data
S B
IS
P riv a te N e tw o rk
FENS
Associated RFI-2 Topics:
V.2.a
V.2.b V.2.c
V.2.d
The FAA is exploring the appropriate use of FENS within the
SBIS architecture and is looking for input on how industry would integrate FENS into their proposed solution.
G o v e rn m e n t V e n d o r
Notional SBIS FENS Network Architecture
Security Gateway SDPs
Surveillance Broadcast and Information
SBIS RFI-2: Transition
An SBIS transition may be complex.
Implementation considerations have been provided in Attachment 10.
Seeking industry feedback on:
• A transition approach and timeline for your implementation strategy
• Major assumptions and constraints
• An approach to de-conflict undue frequency interference (1030, 1090 and 978MHz) and account for coordination of the UAT channel management of the ground segment time slots between the operational SBS system and the new SBIS system
• Transition risks and mitigation opportunities
• Technical suggestions for transition risk mitigation which could be implemented prior to SBIS contract award, should a transition be required
Site Logistics
Uplink Advisory Services
Flight Inspection
Automation Integration
Transition Considerations
Associated RFI-2 Topics:
V.3.a
V.3.b V.3.c
V.3.d
Surveillance Broadcast and Information
SBIS RFI-2: Enhancements
• Minimum Operational Performance Standards (MOPS)
• Updated Interfaces
• Alternate/Backup Timing Source
• ADS-B Surface Expansion
• Surveillance Services for Remote Towers
• WAM Expansion (En Route and Terminal WAM Service Volumes)
• Expansion of 3NM Separation throughout En Route Airspace
• Information Systems Security
• Supply Chain Risk Management
The FAA is considering the list of enhancements below for inclusion in the future SBIS system. RFI-2 requests input specifically for those in black;
however, responses are also welcome for the topics in grey.
Note: See Attachment 7 – SBIS ConOps Supplement
Key:
• Topic included in RFI-2
• Topic not included in RFI-2
Surveillance Broadcast and Information
SBIS RFI-2: Enhancements Minimum Operational Performance Standards (MOPS)
New 1090 ES MOPS
(DO-260C)
• Phase Overlay
• Increased maximum squitter rate
• Additional data fields in ABS-B messages
– Weather messages
– Interrogation and reply monitoring
– UAS contingency
– High altitude, high velocity extended squitter
Associated RFI-2 Topics:
V.4.c
V.4.k
Surveillance Broadcast and Information
SBIS RFI-2: Enhancements Alternate non-GPS Dependent Timing Source
• SBIS will require the use of an alternate timing source
• Global Positioning System (GPS) timing has potential to expose systems to unintended or malicious signal jamming
• System owners must migrate to a
National Institute of Standards and
Technology (NIST) or United States Naval
Observatory (USNO) traceable source provided by resilient FAA enterprise timing systems and/or services
• Department of Transportation (DOT) is in the process of defining the requirements and parameters for Reference Timing
• See Executive Order 13905 and FAA
Order 1770.68
GPS Timing (UTC)
Radio Station
Alternate
Timing Source
Associated RFI-2 Topics:
V.4.d
V.5.b
Surveillance Broadcast and Information
SBIS RFI-2: Enhancements Reduced 3NM Separation throughout En Route Airspace
Efficiency benefits can be obtained by expanding the airspace where ADS-B can be used for 3NM separation to all en route airspace, including that above Flight Level 230.
• Requires changes in performance requirements for en route service volumes to provide ADS-B updates at 3 seconds (95%) or better in all 1090 MHz interference environments.
• Position validation capabilities will be required to utilize thresholds applicable for 3NM airspace.
• Conflict alert and conflict probe thresholds for FAA Automation Systems will need to be adjusted to support reducing separation in the airspace above Flight Level 230.
20Surveillance Broadcast and Information
SBIS RFI-2: Enhancements Information Systems Security
• SBS/SBIS is a FIPS-199 “High” security categorized system
– Subject to all governmental reporting requirements
– Infrastructure migration for predominately Internet Protocol (IP)-based capabilities and transport
(versus legacy Time Division
Multiplexing)
– Resiliency requirements include mitigation of GPS and ADS-B jamming
/ spoofing threats, cyber resiliency / operational redundancy
– Integration with NAS Cyber
Operations
Associated RFI-2 Topics:
V.5.a
V.5.b V.5.c
V.5.d
Surveillance Broadcast and Information
SBIS RFI-2: Opportunities for Innovation
• Oceanic and Remote Service Coverage
• Gulf of Mexico
• Surveillance Processing and Networking (SPaN)
• Surveillance Services for Staffed VFR Towers
• Enhanced Weather/New FIS-B Products
• Incentives to Support Commercial Space Evolution
• Surveillance Architecture
• Future SBIS Enabled Applications
• Contingency / Disaster Recovery Planning
The FAA is looking for feedback on innovative approaches to the list of topics below for inclusion in the future SBIS system. RFI-2 requests input specifically for those in black; however, responses are also welcome for the topics in grey.
Key:
• Topic included in RFI-2
• Topic not included in RFI-2
Surveillance Broadcast and Information
SBIS RFI-2: Innovation Opportunities Oceanic and Remote Service Coverage
• The FAA is looking for solutions to provide services in oceanic and remote airspace
– Airspace where deploying a ground-based infrastructure is challenging, due to terrain, water, lack of infrastructure, etc.
• Draft requirements are included in Attachment 9 -
Oceanic/Remote Service
Specification
Associated RFI-2 Topics:
V.4.h
V.4.j V.6.a.ii
V.6.a.iii V.6.a.iv
ZNY
ZAN
Oceanic
ZOA
ZAN
Arctic
1 Average Daily ATOP Operations from October 2015 to September 2016
Facility Miles of Airspace Flights per Day1
New York (ZNY) 3.3M sq miles 680
Oakland (ZOA) 18.6M sq miles 878
Anchorage (ZAN) 1.2M sq miles 255
1 Average Daily ATOP Operations from March 2019 to February 2020
Surveillance Broadcast and Information
SBIS RFI-2: Innovation Opportunities Gulf of Mexico
Challenges
• Platform availability and longevity
– Affected by oil prices
• Restricted access (helicopters, boats)
– No scheduled transportation methods available to
FAA and FAA contractors
• Environmental impacts on equipment
– Tropical storms, hurricanes, high temperatures, high humidity, and saltwater have a heavy impact on equipment
• Space limitations on platforms
– Unobstructed line of site is challenging and may require costly platform modifications
• Reliance on platform telecom
– Not designed to meet FAA reliability requirements
Associated RFI-2 Topics:
V.1.b
V.4.h V.4.i
V.4.j V.6.a.ii
Source: Helicopter Association International
Surveillance Broadcast and Information
Security Gateway SDPs
SBIS RFI-2: Innovation Opportunities Surveillance Processing and Networking (SPaN)
• Manage and process surveillance information (ADS-B, WAM, and Radar)
• Enhance FAA surveillance processing and networking capabilities and broaden the surveillance infrastructure
• Increase data distribution capabilities allowing new applications
• Additional processing applications and capabilities
FAA Facilities
SBIS Segment
Radio Stations Control Station
External Users (e.g., UAS, Commercial Space)FAA ATC Surveillance Sensors
MLAT Radio Station
SBIS Private Network
FENS
Associated RFI-2 Topics:
V.1.a
V.1.d V.4.g
Surveillance Processing and Network
NOC
Centralized Tracking (CSTS)
Advanced Applications for
TBO
Inter-Sensor Coordination
Sensor Data Integration xTM/UTM/Space Vehicle Data Integration
Service-Level Centralized Monitor ing
Future Application
Surveillance Broadcast and Information
SBIS RFI-2: Innovation Opportunities Surveillance Architecture
• Evolve surveillance architecture to an open, standards-based, modular architecture
• SPaN would be the backbone of this architecture
Benefits include:
• Reducing costs to develop, operate, and sustain NAS surveillance and automation systems (in support of Automation Evolution)
• Reducing time to develop, integrate, and deploy new capabilities
• Leveraging commercial industry best practices
• Establishing a broad industry base to support the FAA across a range of development and deployment capabilities
SPaN
Surveillance Broadcast and Information
SBIS RFI-2: Other Innovation Opportunities
• Improved capabilities to track commercial spacecraft
• Commercial spacecraft equipped with ADS-B would provide real-time surveillance information to both Air Traffic and the operators z y x
RX 1 RX 2
RX 3RX 4
Intersecting
Hyperbolas
Mode A/C/S Replies and ADS-B Squitters
TDOA
Processing
NAV Position Uplink
ADS-B Phase Overlay
• Provide operators real-time
ADS-B data for a more complete picture of the airspace in which they are operating
• Provide Air Traffic improved visibility and allow for better airspace management
Commercial Space Evolution
UAS/UTM Support
APNT Support / Applications
• SBIS provision of APNT through phase overlay broadcast service
• Alternative Navigation Application
Surveillance Broadcast and Information
SBIS RFI-2: Service Volumes for Cost ROM
Southern California TRACON (SCT)
• Terminal (both ADS-B and WAM)
• Three underlying surface ADS-B volumes (LAX, SAN, SNA) were also included
• They fall within SCT, and their infrastructure would likely contribute to the terminal ADS-B and WAM SVs
– ADS-B and associated ADS-B In services are intended to meet the current coverage provided to ATC and aircraft operators
– WAM coverage will be to the published MVAs – 300 feet
– It should be assumed that the overlying en route SV will have a ceiling of 1,051,500 feet (173 NM)
ADS-B Coverage WAM Coverage
Surveillance Broadcast and Information
SBIS RFI-2: Service Volumes for Cost ROM
29Surveillance Broadcast and Information
Services Industry Event
Alaska
Gulf of Mexico
• Looking for innovative approaches for tackling these more challenging environments
• Ceiling for all of the en route SVs will include Upper Class E, up to 1,051,500 feet (173 NM)
New York Oceanic
Any
Questions?
RFI Topics: Acquisition Approach, Network / Communications, Transition, Enhancements and Innovation, Security/Resiliency, Cost
Federal Aviation Administration
Shahan Stepanian Surveillance Broadcast and
Cost Lead
RFI-2 requests the following details pertaining to cost estimates:
• Provide a ROM for development/first article costs
• Provide a ROM for your preferred acquisition approach to include all SBS services and the SBIS enhancements described in Attachment 7, for the following Service Volumes:
– Southern California TRACON (SCT)
• Terminal (both ADS-B and WAM), plus three underlying surface ADS-B volumes (Los Angeles, San
Diego, John Wayne-Orange County)
– Gulf of Mexico
– Alaska
– New York Oceanic
• Please provide the methodology that may be used to extrapolate NAS-wide for all service volumes
• Please discuss your recommended pricing construct and performance incentives/disincentives
• Reminder, mark all confidential and proprietary information accordingly
SBIS RFI-2: Cost Estimates Associated RFI-2 Topics:
V.1.c
V.6.a V.6.b
V.6.c
Surveillance Broadcast and Information
SBIS RFI-2: Cost Estimate
RFI-2 provides cost templates for the following:
Development / First Article
Costs (1) Individual Service Volumes (7) Summary (1)
Includes non-recurring costs and costs to stand up the system
(e.g., software development, Factory
Acceptance Testing)
Terminal Southern California plus three underlying surface ADS-B volumes (Los Angeles, San Diego, John Wayne-Orange County)
Alaska, Gulf of Mexico, and New York
Oceanic
Summary of all the individual cost templates
Surveillance Broadcast and Information
SBIS RFI-2: Cost Estimate Inputs – Labor, Material and Schedule
WBS
• FAA WBS v5.3 (WBS dictionary provided as attachment: FAA WBS
5.3)
Material / ODC
• Build up of Material and ODC
• All additional details to be captured in the cost template backup tabs (e.g., source information, specific information on cost buildup, etc.)
Labor
• High-level labor categories
• Fully loaded labor rates
Schedule
• Provide a high-level production and installation schedule
Surveillance Broadcast and Information
SBIS RFI-2: Cost Estimate WBS Matrix
35Surveillance Broadcast and Information
SBIS RFI-2: Cost Estimate WBS Matrix (Continued)
Review of cost model template
Surveillance Broadcast and Information
Any
Questions?
RFI Topics: Acquisition approach, Network / Communications, Transition, Enhancements and Innovation, Security/Resiliency, Cost
Federal Aviation Administration
Pamela Maxwell Surveillance Broadcast and
RFI-2 and Open Q&A
Submit Your RFI Responses
• Submit RFI-2 Responses by August 24, 2021 to Phil Moyers, Phillip.L.Moyers@faa.gov and
Aleksandra Skoric, Aleksandra.Skoric@faa.gov
• Today's presentation will be posted on SAM.gov
Please provide your solutions for the SBIS missions and/or ideas for engagement to define the acquisition.
Looking ahead:
Partial Draft SIR #1
3rd Quarter 2022
*Note: Any proprietary or confidential information contained in any industry submissions that should not be released to the public should be appropriately marked, and industry should be prepared to provide justification to the FAA of such designations, if requested.
Surveillance Broadcast and Information
Services Industry Event https://sam.gov/opp/df36f5fa43904cb48b02468594eb567c/view
BACKUP
SBIS RFI-2 Attachments
• Attachments reflecting current SBS requirements o Attachment 1 – SBS Services Description Document o Attachment 2 – ConOps for SBS o Attachment 3 – Gulf of Mexico o Attachment 4 – SBS ADS‐B and ADS‐R Critical Services Specification o Attachment 5 – SBS Essential Services System Specification o Attachment 6 – WAM Critical Service Specification
• Attachments describing future SBIS requirements/concepts o Attachment 7 – SBIS ConOps Supplement o Attachment 8 – SBIS Service Volume Description Document o Includes SBIS_SCT_SV-T1_ADS-B_Coverage.kmz o Attachment 9 – Oceanic/Remote Service Specification (DRAFT) o Attachment 10 – SBIS Implementation Considerations
• Attachments for responding to the RFI o Attachment 11 – COST/ROM Template o Attachment 12 – SBIS RFI-2 Comment and Question Matrix