SBE_CMAR_Clause_Language.pdf
PDF 251 KB Posted
- Attached to
- ESTRELLA CIVIC SPACE BRANCH LIBRARY (GO BOND) AND ROAD IMPROVEMENTS CONSTRUCTION MANAGER AT RISK SERVICES
- Solicitation number
- PA75200751 & LS71200119
- Issued by
- Maricopa County, Phoenix City, Arizona
About this file
This is a Small Business Enterprise (SBE) Program clause document for a Construction Manager at Risk (CMAR) contract issued by the City of Phoenix for the Estrella Civic Space Branch Library and Road Improvements project (Project #: PA75200751 & LS71200119). The document establishes SBE participation requirements and compliance procedures for contractors selected to perform construction management and related services. Contractors must submit qualifications through the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix by 12:00 pm on Friday, December 4, 2026. The contract imposes mandatory SBE utilization goals that contractors must meet or exceed on each Guaranteed Maximum Price (GMP) proposal submitted throughout the contract term.
The SBE program requires that only firms certified by the City of Phoenix under Chapter 18, Article VIII of the Phoenix city code are eligible to satisfy participation goals. Contractors must submit a Contractor's Statement of Proposed SBE Utilization and Letters of Intent to Perform from each SBE subcontractor with each GMP proposal. SBE firms must perform at least 75% of the total cost of their assigned contract with their own workforce to be considered performing a commercially useful function. The use of SBE suppliers and brokers to meet goals is limited to 25% of the total SBE goal requirement, with specified exceptions for manufacturers, fabricators, and professional service providers. Contractors unable to meet the goal must submit fully documented waiver requests demonstrating good faith efforts, including proof of SBE firm contact, bid solicitations, and assistance provided. Post-award compliance requires contractors to contract in good faith with all proposed SBE firms, maintain detailed records, submit monthly compliance reports through the City's online system, and comply with prompt payment and retention requirements. Failure to comply results in noncompliant status, potential payment withholding, bid rejection, or contract cancellation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Small Business Enterprise Program
SBE – CMAR CONTRACT CLAUSE
PROJECT #: PA75200751 & LS71200119 CONTRACT #: TBD
PROJECT TITLE: Estrella Civic Space Branch Library and Road Improvements GO Bond
SBE PROGRAM DEFINITIONS
Broker, Packager, Manufacturers’ Representative, or Jobber means a firm that is not a manufacturer or regular dealer as defined herein.
Commercially Useful Function (CUF) means that an SBE firm is responsible for execution of the work of the contract and is carrying out its responsibilities by actually performing, managing, and supervising the work involved. An SBE must perform at least 75% of the total cost of its contract with its own work force in order to be determined to be performing a CUF on the contract.
Contract is a written agreement obligating the seller or business enterprise to furnish goods or services as submitted and the Purchaser or Buyer to pay for such goods or services.
Contractor is an individual, partnership, joint venture, corporation or firm that executes a contract with the City to perform services requested by a solicitation or procurement. The Contractor may be direct or through an authorized representative.
Joint Venture (JV) is an association between two or more persons, partnerships, corporations, or any combination thereof, formed to carry on a single business activity. The JV is limited in scope and duration to this contract. The resources, assets and labor of the participants must be combined in an effort to accrue profit.
Manufacturer means a firm that operates or maintains a factory or establishment that produces, on the premises, the materials, supplies, articles, or equipment required under the contract.
Purchaser for purposes of this contract means the City.
Regular Dealer or Supplier means a business that owns, operates, or maintains a store, warehouse, or other establishment in which the materials, supplies, articles or equipment of the general character described by the specifications are bought, kept in stock, and regularly sold or leased to the public in the usual course of business. The firm must be an established, regular business that engages, as its principal business and under its own name, in the purchase and sale or lease of the products in question.
Small Business Enterprise (SBE) means a small business that has been determined to meet the requirements for SBE certification with the City of Phoenix and whose certification is in force at the time of the award of business by the City. A directory of currently certified SBE firm is located at https://phoenix.gob2g.com.com.
Subcontract is a contract at any tier below the prime contract, including purchase orders.
Subcontractor is an individual, partnership, joint venture, corporation or firm that holds a contract at any tier below the prime contract, including purchase orders.
Successful Submitter is a Submitter who has been selected to perform services requested by a solicitation or procurement.
https://phoenix.gob2g.com.com/
SECTION I. SBE CERTIFIED FIRMS
Only firms certified by the City of Phoenix under Chapter 18, Article VIII of the Phoenix city code are eligible to fulfill the participation goal stated above. A firm’s certification must be in the trade areas listed on the proposed utilization form and current and in force at the date and time of the bid opening deadline.
The most current electronic directory of all certified SBE firms can be accessed at:
https://phoenix.diversitycompliance.com
If you need to verify certification status, please contact the Equal Opportunity Department at (602) 262- 6790 and identify yourself as a prime contractor. Prime contractors should verify that the certifications of the SBE firms are current prior to each GMP proposal. If a firm’s certification expires and is not renewed prior to the firms starting work, that firm will be ineligible to satisfy the goal.
SECTION II. SBE SUBMITTAL REQUIREMENTS
As a matter of compliance:
Successful Submitter must submit the following as part of each GMP submittal:
1. A Contractor’s Statement of Proposed SBE Utilization - The form shall document the name of each SBE firm that will be awarded a subcontract; services to be performed by each subcontractor; dollar amount to be paid for those services; and the total dollar amount that is being proposed in SBE participation.
2. A Letter of Intent to Perform as a SBE Subcontractor/Supplier (required for each SBE subcontractor/supplier proposed) – With the exception of the last two columns in Part B Section 1 and the Total Amount indicated in Part E of the LOI, the form shall be completed by the SBE firm that will be awarded the subcontract. The form documents services to be performed by the subcontractor/suppler and the total dollar amount of the subcontract that will be awarded to the SBE. Only the services performed in the area(s) described by the SBE’s certification description can be counted towards the SBE goal requirement.
The proposed utilization of SBE firms to fulfill the participation goal must be submitted on the “Contractor’s Statement of Proposed SBE Utilization” form included in the specification packet.
Additionally, each of the SBE subcontractors/suppliers the contractor is proposing to use to meet the goal requirement on this contract must complete the “Letter of Intent to Perform as an SBE Subcontractor/Supplier” form. Both forms must be completed and submitted as part of each GMP Proposal.
In instances where an exact dollar amount to be subcontracted with a SBE firm cannot be determined, the contractor shall indicate on Columns 3 and 4 of Part B Section 1 of the “Letter of Intent To Perform as a SBE Subcontractor/Supplier” form the minimum guaranteed hours/units and dollar amount that will be paid to the SBE firm. This situation applies only when the contractor proposes to utilize an SBE firm that engages in work related to a broker, supplier or; a bid that is based on a per hour charge as in hauling/trucking or construction site security. Please note that this exception does not permit the contractor to complete or modify any other part of the LOI document. Both, the SBE and the contractor must sign the LOI document prior to bid submittal. By signing the document, the bidder affirms that it has not altered or modified the document in any way other than, if applicable, entering the Unit/Hours and Total Quote Amount in Part B SECTION 1.
If the contractor proposes to utilize a firm not certified by the City of Phoenix and/or not certified in the proposed scope of work at the time of bid, the proposed utilization amount for that firm will be deducted from the total proposed SBE utilization amount and shall not be counted toward the SBE contract goal requirements. Contractor shall not include any amount the SBE firm has indicated in the LOI document as work it will sublet or is not covered in their certification description in the Contractor’s Statement of Proposed SBE Utilization form. Only amounts associated with the work to be performed by the SBE, and indicated in the SBE’s certification description, may be counted towards the SBE participation goal requirement of this section.
A certified SBE firm bidding as a Prime Contractor cannot count the work it will self-perform towards meeting the required SBE subcontracting goal.
SECTION III. IF THE CONTRACTOR IS UNABLE TO MEET THE GOAL
1. Contractor will be required to submit a fully documented waiver request detailing why contractor was unable to meet the SBE utilization goal in whole, or in part, and the “good faith efforts” it made to obtain SBE participation for each GMP submittal. In order to be viewed as good faith efforts, the contractor’s activities must be consistent with all activities that could reasonably be expected from a contractor who was actively and aggressively seeking to meet the SBE goal. To show proof of having exercised good faith efforts in trying to obtain bids from SBE firms to meet the utilization goals. The following factors are illustrative of those matters that shall be considered when judging whether the bidder made “good faith efforts”.
a. A cover letter addressed to the Street Transportation Procurement Section clearly indicating whether a full or partial waiver is being requested, the percentage to be waived, and the reasons the waiver is being sought.
b. If a partial waiver is being requested, a Bidder’s Statement of Proposed Utilization listing firms that will satisfy the portion of the goal that will be met must be included with the bid proposal. Additionally, a Letter of Intent to Perform as a Subcontractor/Supplier from each SBE firm that is proposed to be utilized must be included with the bid proposal.
c. Proof of contact with SBE firms, including but not limited to, fax logs, telephone logs, mail receipts, etc, including documentation of the number of times that firms were contacted, the dates of contact, and the name, phone number, fax number, and address of the contact person associated with each SBE firm. Solicitation of SBE subcontractors must be consistent with the solicitation of all subcontractors and must clearly demonstrate that SBE firms had sufficient time to submit an effective response.
d. Copies of the documents submitted to all subcontractors requesting their bid. This should include the scope of work to be bid and performed on the project.
e. Copies of bid responses/quotes from all subcontractors who bid to perform work on the project in the areas that SBE firms were also bidding on, including information as to why SBE bids were not considered.
f. Documentation that shows efforts made to provide assistance to SBE firms in the areas of bonding, insurance, or other contracting requirements.
g. Documentation of attendance at the pre-bid conference held for the project.
h. Documentation of contact made with City personnel seeking assistance in identifying eligible SBE firms for contracting opportunities on the project.
SECTION IV. LIMITATION OF THE USE OF SUPPLIERS & BROKERS TO FULFILL THE SBE GOAL
Proposed expenditures to brokers and suppliers can be used to meet the utilization goal, provided that the combined applicable expenditures do not exceed 25 percent (25%) of the total SBE goal requirement.
Contractors may count one hundred percent (100%) of the dollars proposed to be paid to an SBE supplier, and all costs associated with fees and commission to be paid to a SBE broker, up to the 25% limitation.
Supplier (or Wholesaler) is defined as firm that does not directly manufacture the product being supplied and has an established, regular business that engages, as its principal business and under its own name, in the purchase and sale or lease of the products in question. A supplier is a firm that owns, operates, or maintains a store, warehouse, or other establishment in which the materials, supplies, articles or equipment of the general character described by the specifications and required under the contract are bought, kept in stock, and regularly sold or leased to the public in the usual course of business.
EXAMPLE: An SBE goal of 5% has been established on a project where the contractor has submitted a base bid of $1,000,000. This results in a dollar goal of $50,000 to be subcontracted to SBEs. The contractor proposes to contract with an SBE supplier for $100,000. Only $12,500, or 25 percent (25%), may be counted towards achievement of the SBE goal for this project. The remaining $37,500 must be achieved through the use of firms that are not suppliers or brokers.
Broker is defined as firm that arranges or expedites services or transactions through the use of individuals not directly employed by the company. Brokers are not regular suppliers. Only costs associated with the fees and commission paid to the certified firm for providing such services may be applied towards the SBE contract goal.
The following defines the expenditures to SBE firms that are NOT subject to the 25% limitation. The following expenditures may be counted in their entirety towards fulfilling 100% of the utilization goal:
1. Expenditures to certified SBE firms that operate and maintain an establishment or factory to produce, on the premises, the materials or supplies purchased for the contract.
2. Expenditures to a certified SBE fabricator that operates and maintains a factory to substantially alter materials or supplies before resale.
3. Expenditures, including fees and commissions, charged to provide bona fide technical and professional personnel recruitment for the contract. The total cost paid that shall be comparable to the industry standards customarily charged for the same or similar services.
4. Expenditures, including fees and commissions, charged for providing bonds and insurance specifically required for the performance of the contract. The total cost shall be comparable to the industry standards charged for the same or similar services.
All SBE firms proposed to participate on this contract opportunity must be SBE certified by the City of Phoenix prior to the date and time of each GMP.
Participation on the contract will be calculated based on that portion (dollar value) of the contract that the SBE actually performs with its own forces. This includes the cost of supplies and materials obtained by the SBE for the work on the contract, except in cases when; it has been determined by the City not to be part of the firm’s certification description; the SBE is certified as a “placer”, “finisher”, or “installer” of those materials only, or when the supplies and/or equipment it uses to perform its work is purchased or leased from the Contractor or its affiliate.
Fees & Commissions: SBE firms that supply a bona fide service for a fee or commission may be counted only to the extent of the fees or commissions charged by the SBE. This includes, but is not limited to, providing professional, technical, consultant, or managerial services, and bonds or insurance specifically required for the performance of a contract. The fees must be reasonable and not excessive as compared with fees customarily allowed for similar services.
Example: An SBE firm that supplies uniformed officers for security or traffic control may count only the amounts charged as a commission. The hourly amount paid to the officers may not be counted. If the “per hour” bid amount to the prime contractor is $35, and $25 per hour will be paid to the officers, only $10 per hour can be counted towards achieving the SBE goal. If the firm or bidder estimates that there will be 200 hours of work bid at a rate of $35 per hour, only $2,000 of the total $7,000 bid could be counted.
Trucking & Hauling: The amount of a trucking/hauling subcontract that may be counted towards the utilization requirements may be limited.
An SBE must itself own and operate at least one fully licensed, insured, and operational truck that will be used on the contract. In addition, trucks the SBE leases without drivers under a long-term leasing agreement may be considered part of the trucking firm’s workforce and counted in full, provided the leasing agreement(s) is/are for a period of not less than 6 months and; the leased vehicles have been recorded with the City’s Equal Opportunity Department’s Certification Office prior to the submittal of the LOI document.
Example: A SBE trucking firm uses seven trucks on a job; two are owned by the SBE and five are leased from other firms. If two of the five trucks are leased without drivers and the remaining three are leased with drivers from another firm, then the amount paid to the SBE for the services provided by the trucks it owns and the two it leases without drivers and operates with its own employees can be counted in full towards meeting the SBE requirements. The Contractor may not count any portion of the amount the SBE receives for the two trucks it leases with drivers towards the SBE utilization goal.
SECTION V. POST AWARD SBE COMPLIANCE INFORMATION - CMAR
Acceptance of the GMP proposal shall constitute an agreement by the contractor to comply with the SBE utilization requirements of this section. This includes, but is not limited to, the following compliance activities:
1. The contractor shall contract, or attempt to contract, in good faith with all SBE firms listed on the Contractor’s Statement of Proposed SBE Utilization form submitted with the GMP Proposal.
The subcontract shall be for an amount that is equal to, or greater than, the total proposed dollar amount listed on the form, with the exception of instances where the City changes a scope of work in the contract that would reduce the available work in the subcontractor’s area of performance.
2. The contractor shall not reduce any of the proposed SBE scopes of work or amounts indicated on the Contractor’s Statement of Proposed SBE Utilization form without first submitting a Request for Exemption and receiving approval in writing from the City’s Equal Opportunity Department (EOD), Contract Compliance section.
3. The contractor shall notify the City of Phoenix Equal Opportunity Department immediately if any firm listed on the Contractor’s Statement of Proposed SBE Utilization form refuses to enter into a subcontract or fails to perform according to the requirements of the subcontract.
4. Any reduction of retention by the City to the contractor shall result in a corresponding reduction to subcontractors or suppliers who have performed satisfactory work. The contractor has 14 days from the date their retention reduction takes effect to reduce retention to the subcontractors.
5. The contractor shall return all retention monies to subcontractors at such time as the work originally proposed by the subcontractor, and expressed in the original subcontract agreement, is complete and the purchaser (City) has accepted the work and paid the prime for the work performed by the subcontractor. Retention shall be paid no later than 30 days after such payment is made by the City.
6. The contractor shall act in good faith to meet or exceed the contract SBE utilization goal requirement on each GMP and provide all necessary documentation to show proof of those efforts as requested by the City. Approval of a partial SBE Goal waiver for a specified GMP does not automatically release contractor from its obligation to meet or exceed the overall SBE goal requirement established for this contract.
If for any reason the SBE firm is decertified prior to the execution of a subcontract agreement, the contractor shall find additional SBE participation in the amount equivalent to or greater than that which was originally proposed for the SBE firm. Contractor shall make every good faith effort possible in finding a SBE replacement in the proposed trade area first, before considering SBE participation in other trade areas.
SECTION VI. Subcontract Assurances
Each contract signed by the Agency and the Successful Bidder and each subcontract signed by the Successful Bidder with a Subcontractor, including Subcontractors with lower tier Subcontractors must include the following assurances verbatim:
Prompt Payment of Subcontractors The Contractor and Subcontractor shall promptly pay its lower tier subcontractors, sub consultants, or suppliers upon receipt of payment from the City of Phoenix (Agency).
Progress Payments: In accordance with the Arizona Revised Statues (ARS), Section 34-221(G), the Contractor(s) shall promptly pay its subcontractors, sub consultants, or suppliers within seven (7) calendar days of receipt of each progress payment from the Agency. Any diversion by the Contractor(s) of payments received for work performed on the contract, or failure to reasonably account for the application or use of such payments, constitutes grounds for a declaration of breach of the contract with the Agency.
Retention Payments: If the Agency reduces the Contractor’s retention, the Contractor shall correspondingly, within 14 days, reduce the retentions held against the Subcontractors and suppliers that have performed satisfactory work.
Release of Retention: The Contractor(s) shall ensure prompt and full payment of retentions to Subcontractors and suppliers when their work is complete, the Agency has accepted the work, and the Agency has paid the Contractor for the work. The Contractor shall pay each Subcontractor’s and supplier’s retention no later than 30 days after the Agency pays Contractor for the completed scope of work.
Changes to Subcontracts and Values The City of Phoenix prohibits Contractor(s) from altering the Contractor’s Statement of Proposed SBE Utilization form without receiving prior, written consent from the City. The Equal Opportunity Department must be informed, in writing, and in advance of the following:
• Reduction to the scope of work performed by subcontractors working on the contract
• Changes in any of the subcontract values resulting in a reduced dollar amount
• Replacement and/or release of any subcontractor after contract award
Contractor(s) and Subcontractor(s) are required to complete a Request for Exemption Form and have the written approval of the Contract Compliance Office prior to taking action on any of the above listed matters related to SBE subcontractors.
In the event that any provision of this subcontract varies from the provisions of the contract or subcontract, the provisions for SBE contract compliance as contained in Administrative Regulation 1.89, Section lX, shall provide definitive guidance.
Disclaimer: Nothing in this section prevents the Contractor or Subcontractor from enforcing its subcontract with a lower tier Subcontractor or supplier for defective work, late performance, and other claims arising under the Subcontract.
SECTION VII. RECORDS and REPORTING REQUIREMENTS
1. Records During performance of the Contract, the Successful Submitter shall keep all records necessary to document the participation of all Subcontractors and Suppliers. The Successful Submitter shall provide the records to the Agency within 72 hours of the Agency’s request and at final completion of the Contract. The Agency will prescribe the form, manner, and content of reports. The required records may include but not limited to:
a) A complete listing of all Subcontractors and suppliers on the project;
b) Each Subcontractor’s and supplier’s scope performed;
c) The dollar value of all subcontracting work, services, and procurement;
d) Copies of all executed Subcontracts, purchase orders, and invoices: and
e) Copies of all payment documentation.
2. Reports
a. The contractor shall participate in all compliance reviews determined necessary by the
City. This includes, but is not limited to participating in on-site reviews, providing monthly utilization reports of SBE activity, providing signed copies of subcontracts and/or purchase orders with each SBE listed on the Bidder’s Statement of Proposed SBE Utilization form, and complying with any and all requests for information the City deems appropriate for effectively monitoring this contract for compliance with the SBE Program requirements.
b. The contractor shall provide regular, monthly report/audit information that will assist us in effectively monitoring your compliance with the SBE Program requirements. This shall include listing all subcontractors working on the contract and reporting payments into the Certification and Compliance System https://phoenix.gob2g.com.com. Reporting audits shall include all payments received from the City and payments you have issued to all subcontractors and suppliers. All Monthly audit reports are to be completed online by the 15th of every month. (https://phoenix.gob2g.com.com).
i. The total of all payments received from the City during the previous month.
ii. The first two pages of each payment application submitted for those payments.
iii. All payments made to Subcontractors during the previous month.
Before the Agency processes the Successful Submitter’s final payment and/or outstanding retention held against the Successful Submitter, the Successful Submitter shall submit to the Agency a final certification of full and final payment to each Subcontractor in the form prescribed by the Agency. The form must be completed and certified by the Successful Submitter’s and each Subcontractor’s duly authorized agents.
SECTION VIII. PERFORMANCE OF A COMMERCIALLY USEFUL FUNCTION
The prime contractor may count only expenditures to SBE subcontractors that perform a commercially useful function in the work of the contract, as defined in Chapter 18 Article VI of the City Code. A "commercially useful function” constitutes performing real and actual services related to the contract.
SBE subcontractors may enter into second-tier subcontracts consistent with normal industry practices. If an SBE subcontracts greater than twenty-five (25) percent of the work of their contract, the SBE subcontractor shall be presumed not to be performing a commercially useful function. In this event, the prime contractor will not be allowed to claim any expenditure to the SBE subcontractor.
SECTION IX. FAILURE TO COMPLY WITH THE SBE PROGRAM REQUIREMENTS
If the Equal Opportunity Department determines that the contractor will fail, or has failed to meet the SBE subcontracting goals, and/or has failed to act in good faith to ensure compliance with the SBE conditions of its contract; it shall deem the contractor “noncompliant” and not in good standing. A noncompliant status shall result in the rejection of all future contract bids or offers for all projects or other procurements with the City until such time that the contractor has cured its breaches and demonstrates that it has faithfully performed its approved SBE utilization plan and all other provisions of this article required to be deemed in good standing. In addition to this action, the City may also exercise its option to impose any or all of the following remedies:
1. Withholding from the contractor ten percent (10%) of all future payments on the involved eligible project until it is determined that the contractor is in compliance.
2. Withholding from the contractor all future payments on the involved project until it is determined that the contractor is in compliance.
Failure to cure a non-compliance status within the time frame provided by the City may result in further action, including but not limited to imposing any or all of the following sanctions:
1. Rejection of all future bids or offers from the contractor for any eligible project with the City or any of its departments or divisions for a period of (1) year after substantial completion of the contract.
2. Cancellation of the contract.