Appendix B to Statement of Work - Quallity Assurance Surveillance Plan - QASP

View the file

Other files

File Type Posted
QUESTIONS ON SBAHQ11R0022.doc DOC document
Att1-Clauses-Provisions-ComServSoln-SBAHQ-11D-0003.doc DOC document
Attach2-PB-SOW-StaffAugmentn.docx DOCX document
Attach4-MockTO.docx DOCX document
SF1449-SBAHQ-11-R-0022.pdf PDF
Att1-Clauses-Provisions-ComServSoln-SBAHQ-11D-0003.doc DOC document
Att3-PricingSchedule-SBAHQ-11-D0003.doc DOC document
AppendixA-PositionDescriptions.doc DOC document
Attach2-PB-SOW-StaffAugmentn.docx DOCX document
SF1449-SBAHQ-11-R-0022.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE OF FINANCIAL PROGRAM OPERATIONS

STAFF AUGMENTATION - SUPPORT SERVICES

STATEMENT OF WORK

QUALITY ASSURANCE SURVEILANCE PLAN (QASP)

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

Category
ID
Indicator
Standard
Acceptable Quality Level
Method of Surveillance
Incentive
Routine Reporting
1
Monthly invoices
15 calendar days following the last day of the month invoiced
100%
100% inspection
Positive Past Performance Rating
2
Contract Employee Report
On the 1st and 16th of every month
100%
100% inspection
Positive Past Performance Rating
3
Monthly Status Report
15 calendar days following the last day of the month invoiced
100%
100% inspection
Positive Past Performance Rating
4
Performance Metrics
15 calendar days following the last day of the month invoiced
100%
100% inspection
Positive Past Performance Rating
Contractor Personnel Security Clearance
5
Delivery of security packages of all requested positions
Within 30 days from award date
90%
Periodic Inspection
Positive Past Performance Rating
6
Complete security packages (includes all items outlined in Statement of Work)
All security packages are complete upon delivery to COTR
90%
100% Inspection
Positive Past Performance Rating
Project Management
7
Adherence to project cost
Cost as dictated in SOW, proposal and subsequent modifications should average an on-target burn rate
95%
Analysis of Contractor Reports
Positive Past Performance Rating
8
Adherence to contract scope
Scope as outlined in the statement of work is strictly maintained
100%
Periodic Inspection
Positive Past Performance Rating

INCENTIVES

The Government shall use Positive Past Performance Rating as incentives. Incentives shall be based on the rating scheduled referenced in this QASP.

METHODS OF QUALITY ASSURANCE SURVEILLANCE

Various methods exist to monitor performance. The Contracting Officer’s Technical Representative (COTR) shall use the surveillance methods listed below in the administration of this QASP.

PERIODIC INSPECTION

The COTR review and evaluate all relevant information on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled.

100% INSPECTION

The COTR will review and evaluate all relevant information to determine adherence to quality indicator.

ANALYSIS OF CONTRACTOR REPORTS

The COTR will review and evaluate Contractor provided progress reports – particularly focusing on adherence to contract scope and cost.

RATINGS

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

Exceptional:
Performance significantly exceeds contract requirements to the Government’s benefit.
Satisfactory:
Performance meets contractual requirements.
Unsatisfactory:
Performance does not meet contractual requirements.

DOCUMENTING PERFORMANCE

ACCEPTABLE PERFORMANCE

The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.

UNACCEPTABLE PERFORMANCE

When unacceptable performance occurs, the COTR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COTR shall document the discussion and place it in the COTR file.

When the COTR determines formal written communication is required, the COTR shall prepare a Contract Discrepancy Report and present it to the contractor's program manager.

The contractor shall acknowledge receipt of the Contract Discrepancy Report in writing. The Contract Discrepancy Report will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The Contract Discrepancy Report will also state how long after receipt the contractor has to present this corrective action plan to the COTR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any Contract Discrepancy Reports may become a part of the supporting documentation for any contractual action deemed necessary by the Contracting Officer.

SBAHQ-11-$-0022 – Appendix B – QASP –STAFF AUGMENTATION SUPPORT SERVICES