Attachment_2_-_Slides_from_Briefing_-_Phase_I_Site_Tour_8_Apr_16_Power_Point_Presentation_Slides.pptx

PPTX presentation 1 MB Posted

Attached to
Two Phase Design-Build Building 245 Radiological Research Laboratory Modernization
Solicitation number
SB1341-16-RP-0005
Issued by

About this file

Attachment 2 - Slides from Briefing

View the file

Other files

File Type Posted
SPECIAL_NOTICE_FBO_NOTICE_OF_DOWN_SELECTED_CONTRACTORS_FOR_BLDG._245.docx DOCX document
SB1341-16-RP-0005_-_Amendment_003.pdf PDF
P42.JPG JPG image
Attachment_6_-_Current_Interested_Bidders_List.pdf PDF
P48.JPG JPG image
Attachment_4_-_Sign_In_Sheets_-_Phase_I_Site_Visit_8_Apr_16.pdf PDF
P68.JPG JPG image
P61.JPG JPG image
P63.JPG JPG image
P70.JPG JPG image
FormSF30_Amendment_002_20_Apr_16.pdf PDF
P41.JPG JPG image
P59.JPG JPG image
P36.JPG JPG image
P46.JPG JPG image
P45.JPG JPG image
P64.JPG JPG image
P62.JPG JPG image
P60.JPG JPG image
P51.JPG JPG image
P55.JPG JPG image
P67.JPG JPG image
P56.JPG JPG image
P66.JPG JPG image
P40.JPG JPG image
Attachment_1_-_Questions_with_Responses.docx DOCX document
P53.JPG JPG image
P57.JPG JPG image
P44.JPG JPG image
P38.JPG JPG image
P50.JPG JPG image
P49.JPG JPG image
P54.JPG JPG image
P35.JPG JPG image
Attachment_5_-_Building_Drawings_of_Tour_8_Apr_2016_-_NIST_Bldg_245_Site_Tour_Route.pdf PDF
P47.JPG JPG image
P43.JPG JPG image
P52.JPG JPG image
FormSF30_Amendment_001.pdf PDF
FINAL_30_MAR_16__FormSF1442.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8 April 2016

SITE TOUR

2 Phase D-B Building 245 Radiological Research Laboratory Modernization

Building 245 Design Build RFP

Slide ‹#›

AGENDA

Introductions and Opening Remarks Steve Jennison/FMG Contracting Brief Brian Johnson/AMD Review of Ground Rules Steve Jennison/FMG Security Brief Elizabeth Zimmerman/OSY Safety Brief Manny Mejias/GRSD Site Walk Jack Connolly/FMG 2 Phase D-B Building 245 Radiological Research Laboratory Modernization

Building 245 Design Build RFP

Slide ‹#›

CONTRACTING BRIEF

All questions shall be submitted in writing to the Contract Specialist Last day to submit questions is April 13 @ 3pm EST Phase 1 proposals are due by April 29 @ 1:00pm EST Up to 3 selected for Phase 2 Bid Bond with Phase 2 proposal Second Site Visit Bid Schedule Security Background Checks Superintendence by Contractor L&M Sections & SOW Teaming

Building 245 Design Build RFP

Slide ‹#›

GROUND RULES

2 Phase D-B Building 245 Radiological Research Laboratory Modernization Visitors should have radiation safety and tour route flyers (from the sign-in desk).

Visitors will board the shuttle bus at the main entrance. Bus will be making round trip route. No private vehicles to Bldg 245.

Stay with the group you have been assigned Exterior Photographs are allowed on the walking tour.

No Interior Photographs Tour Leaders will identify certain locations inside for vendors where government photos will be taken.

Groups must leave cell phones/cameras at B245 security entry All questions shall be submitted in writing

SECURITY BRIEF

2 Phase D-B Building 245 Radiological Research Laboratory Modernization Documentation from Binder #2, Background Investigation forms are provided to NIST Office of Security.

Instructions and criteria in Section L- Each named individual who will be screened through the OPM database Individuals did not have to be previously cleared by NIST The T&R Official will make a favorable or unfavorable determination and advise the Contracting Officer for each proposal of results.

SAFETY BRIEF

2 Phase D-B Building 245 Radiological Research Laboratory Modernization Stay together as a Group

Tour does not include Radiation Restricted Areas; Do Not Enter areas posted with:

For this tour, our Safety policy requires a Tour Group member to wear a Pocket radiation dosimeter

Your escort will advise of actions to take for any emergency

SATOC – Project Scope B/C Wing Addition (Initial Task Order)

Conceptual Project Design (Initial Task Order)

D Wing Addition

HVAC Improvements

Renovate Existing Facility

Waterproofing Below Grade

Demo G Wing

Demo E Wing

Hazmat Characterization & Abatement

Studies for vibration and shielding

Building Entrance 2 - B/C Wing Area 3 - Loading Dock 4 - F Wing 5 - G Wing 6 - A Wing 7 - D Wing 8 – E Wing

E C B F D A G image1.png image2.png image3.jpeg image4.gif image5.gif image6.png image7.jpeg image8.JPG