8 April 2016
SITE TOUR
2 Phase D-B Building 245 Radiological Research Laboratory Modernization
Building 245 Design Build RFP
Slide ‹#›
AGENDA
Introductions and Opening Remarks Steve Jennison/FMG Contracting Brief Brian Johnson/AMD Review of Ground Rules Steve Jennison/FMG Security Brief Elizabeth Zimmerman/OSY Safety Brief Manny Mejias/GRSD Site Walk Jack Connolly/FMG 2 Phase D-B Building 245 Radiological Research Laboratory Modernization
Building 245 Design Build RFP
Slide ‹#›
CONTRACTING BRIEF
All questions shall be submitted in writing to the Contract Specialist Last day to submit questions is April 13 @ 3pm EST Phase 1 proposals are due by April 29 @ 1:00pm EST Up to 3 selected for Phase 2 Bid Bond with Phase 2 proposal Second Site Visit Bid Schedule Security Background Checks Superintendence by Contractor L&M Sections & SOW Teaming
Building 245 Design Build RFP
Slide ‹#›
GROUND RULES
2 Phase D-B Building 245 Radiological Research Laboratory Modernization Visitors should have radiation safety and tour route flyers (from the sign-in desk).
Visitors will board the shuttle bus at the main entrance. Bus will be making round trip route. No private vehicles to Bldg 245.
Stay with the group you have been assigned Exterior Photographs are allowed on the walking tour.
No Interior Photographs Tour Leaders will identify certain locations inside for vendors where government photos will be taken.
Groups must leave cell phones/cameras at B245 security entry All questions shall be submitted in writing
SECURITY BRIEF
2 Phase D-B Building 245 Radiological Research Laboratory Modernization Documentation from Binder #2, Background Investigation forms are provided to NIST Office of Security.
Instructions and criteria in Section L- Each named individual who will be screened through the OPM database Individuals did not have to be previously cleared by NIST The T&R Official will make a favorable or unfavorable determination and advise the Contracting Officer for each proposal of results.
SAFETY BRIEF
2 Phase D-B Building 245 Radiological Research Laboratory Modernization Stay together as a Group
Tour does not include Radiation Restricted Areas; Do Not Enter areas posted with:
For this tour, our Safety policy requires a Tour Group member to wear a Pocket radiation dosimeter
Your escort will advise of actions to take for any emergency
SATOC – Project Scope B/C Wing Addition (Initial Task Order)
Conceptual Project Design (Initial Task Order)
D Wing Addition
HVAC Improvements
Renovate Existing Facility
Waterproofing Below Grade
Demo G Wing
Demo E Wing
Hazmat Characterization & Abatement
Studies for vibration and shielding
Building Entrance 2 - B/C Wing Area 3 - Loading Dock 4 - F Wing 5 - G Wing 6 - A Wing 7 - D Wing 8 – E Wing
E C B F D A G image1.png image2.png image3.jpeg image4.gif image5.gif image6.png image7.jpeg image8.JPG