Solicitation for Bldg. 245 Phase I

View the file

Other files

File Type Posted
SPECIAL_NOTICE_FBO_NOTICE_OF_DOWN_SELECTED_CONTRACTORS_FOR_BLDG._245.docx DOCX document
SB1341-16-RP-0005_-_Amendment_003.pdf PDF
P42.JPG JPG image
Attachment_6_-_Current_Interested_Bidders_List.pdf PDF
P48.JPG JPG image
Attachment_4_-_Sign_In_Sheets_-_Phase_I_Site_Visit_8_Apr_16.pdf PDF
P68.JPG JPG image
P61.JPG JPG image
P63.JPG JPG image
P70.JPG JPG image
FormSF30_Amendment_002_20_Apr_16.pdf PDF
P41.JPG JPG image
P59.JPG JPG image
P36.JPG JPG image
P46.JPG JPG image
P45.JPG JPG image
P64.JPG JPG image
P62.JPG JPG image
P60.JPG JPG image
P51.JPG JPG image
P55.JPG JPG image
P67.JPG JPG image
Attachment_2_-_Slides_from_Briefing_-_Phase_I_Site_Tour_8_Apr_16_Power_Point_Presentation_Slides.pptx PPTX presentation
P56.JPG JPG image
P66.JPG JPG image
P40.JPG JPG image
Attachment_1_-_Questions_with_Responses.docx DOCX document
P53.JPG JPG image
P57.JPG JPG image
P44.JPG JPG image
P38.JPG JPG image
P50.JPG JPG image
P49.JPG JPG image
P54.JPG JPG image
P35.JPG JPG image
Attachment_5_-_Building_Drawings_of_Tour_8_Apr_2016_-_NIST_Bldg_245_Site_Tour_Route.pdf PDF
P47.JPG JPG image
P43.JPG JPG image
P52.JPG JPG image
FormSF30_Amendment_001.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NO.

5. REQUISITION/PURCHASE REQUEST NO.

CODE

6. PROJECT NO.

8. ADDRESS OFFER TO

4. CONTRACT NO.

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

11. The contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

NSN 7540-01-155-3212

calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

See Attached

STANDARD FORM 1442 (REV. )

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( )

20b. SIGNATURE 20c. OFFER DATE

STANDARD FORM 1442 (REV. ) BACK

Attachment Page

PAGE 3 OF 119 SB1341-16-RP-0005

The National Institute of Standards and Technology (NIST) is soliciting for a single award task order construction (SATOC) contract. NIST anticipates awarding an Indefinite Delivery Indefinite Quantity (IDIQ) contract with firm fixed price task orders. NIST will use two-phase design-build source selection procedures in accordance with the Federal Acquisition Regulation (FAR) Subpart 36.3.

The Period of Performance (POP) is 60 months for the IDIQ, with Task Orders issued against it. The last Task Order must be issued during the POP of the IDIQ.

This requirement is being solicited using Full and Open Competition.

The Magnitude of Construction Cost is between $350 Million and $450 Million. The first task order is between $50 Million and $60 Million.

The North American Industry Classification System (NAICS) Code for this requirement is 236220, and the size standard is $36.5 Million.

Location of Project: 100 Bureau Drive, Gaithersburg, MD 20899.

THIS IS A REQUEST FOR QUALIFICATIONS ONLY, PHASE ONE (I) OF THE TWO

PHASE DESIGN-BUILD PROCESS. TECHNICAL AND PRICE PROPOSALS WILL NOT

BE ACCEPTED DURING PHASE I.

Up to three of the most highly qualified Design-Build firms will be selected for participation in the submittal of proposals for Phase two (II).

To be evaluated, firms must submit information in response to the criteria established in this Request for Qualification (RFQ).

Please see Clause 52.236-27 for date and location for the site visit for Phase I. Due to security requirements, firms should submit a list containing the first name, last name, company, and whether a US citizen (or country if foreign citizen) for all person(s) that will be attending the site visit not later than 11:00 A.M. Eastern Time, April 4, 2016 to Kandy Clark and Teresa Harris at kandy.clark@nist.gov and teresa.harris@nist.gov. In no event shall failure to submit a list prior to the time and date listed or the failure to attend the site visit constitute grounds supporting a protest or contract claim.

The Government is planning a site visit during which potential contractors may obtain a better understanding of the work required. Firms are strongly urged to visit this site, to fully inform themselves about the location and conditions under which the work is to be performed.

NOTE: IN ORDER TO BE ON TIME FOR THE SITE VISIT, FIRMS ARE ENCOURAGED

TO ALLOW ADDITIONAL TIME TO GET THROUGH SECURITY.

VISITOR CENTER INFORMATION TO ACCESS CAMPUS: When a Guest/Visitor checks in at the NIST Visitor Center and intends to drive into the campus, they will have to show two documents:

a Photo I.D. (State issued driver’s license, Federal I.D., or passport) and a Vehicle Registration card.

If a visitor/guest does not have a valid vehicle registration, they will be required to park at the Visitor’s Center and take the NIST Campus Shuttle. Visitors driving rental cars can show their rental agreement in lieu of vehicle registration.

During the conference, an opportunity to visit the site of the work will be offered to attendees.

Access to the interior of Building 245 is restricted to Government escort only and will require

PAGE 4 OF 119 SB1341-16-RP-0005

dosimetry for the group. Access will be restricted to the public and laboratory spaces that will not impact research operations at this site visit.

Firms are expected to satisfy themselves regarding all conditions that may affect the work required or the cost of contract performance. In no event shall failure to inspect the site and/or equipment constitute grounds for any protest or contract claim.

PLEASE NOTE: Effective July 21, 2014, under the REAL ID Act of 2005, agencies, including NIST, can only accept a state-issued driver’s license or identification card for access to federal facilities if issued by states that are REAL ID compliant or have an extension. Drivers’ licenses from the following states and territories will not be accepted for entry to NIST: Minnesota and American Samoa.

NIST currently accepts other forms of federally issued identification in lieu of a state-issued driver’s license, such as a valid passport, passport card, DOD’s Common Access Card (CAC), Veterans ID, Federal Agency HSPD-12 IDs, Military Dependents ID, Transportation Workers Identification Credential (TWIC), and TSA Trusted Traveler ID.

All questions for Phase I must be submitted via e-mail to Kandy Clark AND Teresa Harris at kandy.clark@nist.gov and teresa.harris@nist.gov, respectively, not later than 3:00 P.M. Eastern Time, April 13, 2016. Any responses to questions will be made in writing, without identification of the questioner, and will be included in an amendment to the solicitation. Offerors are cautioned that, notwithstanding any remarks, clarifications, or responses provided at the site visit, all terms and conditions of the solicitation remain unchanged unless they are changed by written amendment. It is the responsibility of each offeror, prior to submitting qualifications (Phase I) and/or a proposal (Phase II), to seek clarification of any perceived ambiguity in the solicitation or created by an amendment of the solicitation.

Firms must have an active registration in the System for Award Management (SAM) database at www.sam.gov and have completed the Online Representations and Certifications prior to contract award.

All contractor (and subcontractor) personnel proposed to be employed under this contract shall undergo National Agency Check and Inquiries (NACI) security processing by the Department’s Office of Security before being eligible to work on the NIST Gaithersburg campus. Once a favorable NACI determination is made, Building 245 project access will be limited to specific individuals trained and authorized through the Trustworthy and Reliability (T&R) process. Personnel will need to obtain a favorably adjudicated background investigation by the NIST Office of Security and Investigations (OSI) in accordance with 10 CFR Part 37 Subpart B. Please see CAR Clause 1352.237-70 for additional security information.

NOTE: The Architectural-Engineering (A/E) firm that prepared the performance requirements documents are not eligible to participate in this solicitation or resultant award. To prevent a conflict of interest, contractors submitting responses to this RFP are prohibited from teaming, partnering, subcontracting or engaging in any other business relationship regarding the building 245 Renovation project with the following firm:

OKKS Studios 2 Wisconsin Circle, Suite 820 Chevy Chase, MD 20815-7003 United States

PAGE 5 OF 119 SB1341-16-RP-0005

DUNS: 054427042

CAGE Code: 3N814

Any other Architectural-Engineering (A/E) firms or individuals that were involved in the preparation of the preliminary planning for this project are also not eligible to participate in the subsequent Design-Build process.

Bid Bond to cover the first Task Order will be required with Phase II. Do not send a Bid Bond with your Phase I proposal.

SCHEDULE Continued

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

PAGE 6 OF 119 SB1341-16-RP-0005

Design Build SATOC; Bldg 245 Modernization Project

Pricing is not required for Phase I of the solicitation. Bid schedule will be included in the Phase II portion of the solicitation.

0001 See Attached SOW.

1.00 LS

Table of Contents

PAGE 7 OF 119 SB1341-16-RP-0005

SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C. 1 Building 245 - Statement of Work

C. 2 Task Order 1 Table of Contents

SECTION D PACKAGING AND MARKING

D. 1 Not used

SECTION E INSPECTION AND ACCEPTANCE

E. 1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

SECTION F DELIVERIES OR PERFORMANCE

F. 1 Not used

SECTION G CONTRACT ADMINISTRATION DATA

G. 1 Contract Administration

SECTION H SPECIAL CONTRACT REQUIREMENTS

H. 1 1352.237-70 SECURITY PROCESSING REQUIREMENTS - HIGH OR MODERATE RISK CONTRACTS (APR 2010). 43

H. 2 1352.237-75 KEY PERSONNEL (APR 2010)

SECTION I CONTRACT CLAUSES

I. 1 52.202-1 DEFINITIONS (NOV 2013)

I. 2 52.203-3 GRATUITIES (APR 1984)

I. 3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

I. 4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

I. 5 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

I. 6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY

(MAY 2014)

I. 7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

I. 8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)

I. 9 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT 2015)

I. 10 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF

WHISTLEBLOWER RIGHTS (APR 2014)

I. 11 52.204-2 II SECURITY REQUIREMENTS (AUG 1996)--ALTERNATE II (APR 1984)

I. 12 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)... 45

I. 13 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

I. 14 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (OCT 2015).. 45

I. 15 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JULY 2013)

I. 16 52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-DELIVERY CONTRACTS (JAN

2014)

I. 17 52.209-6 PROTECTING THE GOVERNMENT`S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS

DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)

I. 18 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY

2013)

I. 19 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015)

I. 20 52.210-1 MARKET RESEARCH (APR 2011)

I. 21 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)

I. 22 52.215-2 II AUDIT AND RECORDS--NEGOTIATION (OCT 2010)--ALTERNATE II (APR 1998)

I. 23 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

I. 24 52.217-2 CANCELLATION UNDER MULTI-YEAR CONTRACTS (OCT 1997)

I. 25 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014)

PAGE 8 OF 119 SB1341-16-RP-0005

I. 26 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2015)

I. 27 52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (JAN 1999)

I. 28 52.222-3 CONVICT LABOR (JUN 2003)

I. 29 52.222-5 Construction Wage Rate Requirements Secondary Site of the Work (May 2014)

I. 30 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

I. 31 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)

I. 32 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)

I. 33 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY

2014)

I. 34 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

I. 35 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2104)

I. 36 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

I. 37 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)

I. 38 52.222-26 EQUAL OPPORTUNITY (APR 2015)

I. 39 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (APR 2015)

I. 40 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)

I. 41 52.222-38 COMPLIANCE WITH VETERANS` EMPLOYMENT REPORTING REQUIREMENTS (FEB 2016)

I. 42 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC

2010)

I. 43 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)

I. 44 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)

I. 45 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015)

I. 46 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION

CONTRACTS (SEP 2013)

I. 47 52.223-3 I HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)--

ALTERNATE I (JUL 1995)

I. 48 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)

I. 49 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

I. 50 52.223-12 REFRIGERATION EQUIPMENT AND AIR CONDITIONERS (MAY 1995)

I. 51 52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (DEC 2007)

I. 52 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION

CONTRACTS (MAY 2008)

I. 53 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011). 48

I. 54 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

I. 55 52.227-17 RIGHTS IN DATA--SPECIAL WORKS (DEC 2007)

I. 56 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)

I. 57 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

I. 58 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (MAY 2014)

I. 59 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)

I. 60 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

I. 61 52.229-4 FEDERAL, STATE, AND LOCAL TAXES (STATE AND LOCAL ADJUSTMENTS)(FEB 2013)

I. 62 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)

I. 63 52.232-17 INTEREST (MAY 2014)

I. 64 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014)

I. 65 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (JUL 2013)... 49

I. 66 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)

I. 67 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)

I. 68 52.233-1 DISPUTES (MAY 2014)

I. 69 52.233-3 PROTEST AFTER AWARD (AUG 1996)

I. 70 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

I. 71 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

PAGE 9 OF 119 SB1341-16-RP-0005

I. 72 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)

I. 73 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)

I. 74 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

I. 75 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

I. 76 52.236-8 OTHER CONTRACTS (APR 1984)

I. 77 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (APR 1984)

I. 78 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)

I. 79 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

I. 80 52.236-12 CLEANING UP (APR 1984)

I. 81 52.236-13 I ACCIDENT PREVENTION (NOV 1991)--ALTERNATE I (NOV 1991)

I. 82 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)

I. 83 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

I. 84 52.236-17 LAYOUT OF WORK (APR 1984)

I. 85 52.236-21 I SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)--ALTERNATE I (APR

1984)

I. 86 52.236-23 RESPONSIBILITY OF THE ARCHITECT-ENGINEER CONTRACTOR (APR 1984)

I. 87 52.236-25 REQUIREMENTS FOR REGISTRATION OF DESIGNERS (JUN 2003)

I. 88 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

I. 89 52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS (JAN 1997)

I. 90 52.242-13 BANKRUPTCY (JUL 1995)

I. 91 52.242-14 SUSPENSION OF WORK (APR 1984)

I. 92 52.243-4 CHANGES (JUN 2007)

I. 93 52.244-4 SUBCONTRACTORS AND OUTSIDE ASSOCIATES AND CONSULTANTS (ARCHITECT-ENGINEER

SERVICES) (AUG 1998)

I. 94 52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)

I. 95 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (FEB 2016)

I. 96 52.245-1 GOVERNMENT PROPERTY (APR 2012)

I. 97 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)

I. 98 52.248-3 VALUE ENGINEERING--CONSTRUCTION (OCT 2015)

I. 99 52.249-2 I TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012)--

ALTERNATE I (SEP 1996)

I. 100 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)

I. 101 52.203-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2015)

I. 102 52.211-10 I COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)--ALTERNATE I (APR

1984)

I. 103 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

I. 104 52.211-13 TIME EXTENSIONS (SEP 2000)

I. 105 52.216-18 ORDERING (OCT 1995)

I. 106 52.216-19 ORDER LIMITATIONS (OCT 1995)

I. 107 52.216-22 INDEFINITE QUANTITY (OCT 1995)

I. 108 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (OCT 2014)

I. 109 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS --OVERTIME COMPENSATION (MAY 2014)

I. 110 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014)

I. 111 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)

I. 112 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014)

I. 113 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)

I. 114 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT

OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

I. 115 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. [OCT 2015]

I. 116 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)

PAGE 10 OF 119 SB1341-16-RP-0005

I. 117 52.223-11 OZONE-DEPLETING SUBSTANCES (MAY 2001)

I. 118 52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (FEB 2016)

I. 119 52.227-23 RIGHTS TO PROPOSAL DATA (TECHNICAL) (JUN 1987)

I. 120 52.228-1 BID GUARANTEE (SEP 1996)

I. 121 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

I. 122 52.236-4 PHYSICAL DATA (APR 1984)

I. 123 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

I. 124 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)

I. 125 1352.201-72 CONTRACTING OFFICER?s REPRESENTATIVE (C0R) (APR 2010)

I. 126 1352.209-72 RESTRICTIONS AGAINST DISCLOSURE (APR 2010)

I. 127 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)

I. 128 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)

I. 129 1352.215-71 INSTRUCTIONS FOR ORAL PRESENTATIONS (APR 2010)

I. 130 1352.216-74 TASK ORDERS (APR 2010)

I. 131 1352.216-75 MINIMUM AND MAXIMUM CONTRACT AMOUNTS (APR 2010)

I. 132 1352.216-76 PLACEMENT OF ORDERS (APR 2010)

I. 133 1352.227-70 RIGHTS IN DATA, ASSIGNMENT OF COPYRIGHT (APR 2010)

I. 134 1352.228-70 INSURANCE COVERAGE (APR 2010)

I. 135 1352.228-72 DEDUCTIBLES UNDER REQUIRED INSURANCE COVERAGE- FIXED PRICE (APR 2010)

I. 136 1352.233-70 AGENCY PROTESTS (APR 2010)

I. 137 1352.233-71 GAO AND COURT OF FEDERAL CLAIMS PROTESTS (APR 2010)

I. 138 1352.237-70 SECURITY PROCESSING REQUIREMENTS - HIGH OR MODERATE RISK CONTRACTS (APR

2010)

I. 139 1352.237-74 PROGRESS REPORTS (APR 2010)

I. 140 1352.242-70 POSTAWARD CONFERENCE (APR 2010)

I. 141 1352.245-70 GOVERNMENT FURNISHED PROPERTY (APR 2010)

I. 142 NIST LOCAL-35 TASK ORDER PROCEDURES

I. 143 NIST LOCAL-40 BILLING INSTRUCTIONS FOR DELIVERY/TASK ORDERS

I. 144 NIST LOCAL-43 HAND DELIVERY OF QUOTES OR PROPOSALS

I. 145 NIST LOCAL-48 RESERVED

I. 146 NIST LOCAL-52 FUNDS AVAILABILITY

SECTION J LIST OF ATTACHMENTS

J. 1 List of Attachments

SECTION K REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

K. 1 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS (SEP 2007)

K. 2 52.204-5 WOMEN-OWNED BUSINESS (OTHER THAN SMALL BUSINESS) (OCT 2014)

K. 3 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

K. 4 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015)

K. 5 52.223-1 BIOBASED PRODUCT CERTIFICATION (MAY 2012)

K. 6 52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR

TRANSACTIONS RELATING TO IRAN--REPRESENTATION AND CERTIFICATIONS (OCT 2015)

K. 7 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)

K. 8 52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

K. 9 52.204-17 OWNERSHIP OR CONTROL OF OFFEROR. (NOV 2014)

K. 10 52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS-REPRESENTATION (NOV

2015)

K. 11 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (OCT 2015)

K. 12 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)

PAGE 11 OF 119 SB1341-16-RP-0005

K. 13 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014)

K. 14 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS

(MAY 2014)

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L. 1 SECTION L

L. 2 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013)

L. 3 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2015)

L. 4 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MANAGEMENT (JUL 2015)

L. 5 52.211-6 BRAND NAME OR EQUAL (AUG 1999)

L. 6 52.215-1 I INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)--ALTERNATE I (OCT

1997)

L. 7 52.216-1 TYPE OF CONTRACT (APR 1984)

L. 8 52.233-2 SERVICE OF PROTEST (SEP 2006)

L. 9 52.236-27 I SITE VISIT (CONSTRUCTION) (FEB 1995)--ALTERNATE I (FEB 1995)

L. 10 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

L. 11 Attachment L1 - Past Performance Questionnaire

L. 12 Attachment L2 - NIST 1086 Consent Form

SECTION M EVALUATION FACTORS FOR AWARD

M. 1 SECTION M

PAGE 12 OF 119 SB1341-16-RP-0005

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C. 1 Building 245 - Statement of Work

01 10 00

STATEMENT OF WORK

1. Project Background

1.1. Project objectives-

National Institute of Standards and Technology (NIST) Gaithersburg, Maryland campus is a Research and Development (R&D) facility with 52 buildings located on a 574 acre site.

NIST develops, maintains and disseminates the measurement standards for electromagnetic radiation and radioactivity in the United States. Completed in 1964, Building 245 was the first research facility built on the NIST Gaithersburg Campus.

Purpose-built to accommodate the nation’s radiation physics research, this is a highly specialized facility with concrete shield walls nearly 10 feet thick and large subterranean program areas located in basement and sub-basement levels. This uniquely constructed facility continues to support radiation physics measurements and research and is highly valued for its unique physical characteristics. NIST is undertaking a significant modernization construction program to expand the radiation physics research laboratory capacity of the facility, renovate and upgrade existing building spaces to comply with current codes, and replace aged mechanical, electrical, plumbing and other infrastructure systems completely throughout the facility. The project objectives for this modernization require a strategy that executes all work in specifically sequenced phases to maximize continued occupancy and sustain uninterrupted research activities throughout the project duration.

The contractor shall provide a design and construction solution that meets the minimum design requirements within the Requirements Document for Building 245 Modernization, inclusive of contractor offered enhancements. The following additional points are of significant importance and the narrative of the proposed design and construction solution shall address each:

1.1.1. B/C Wing Building Addition: The Building 245 Modernization includes the design and construction of a major building addition to the east of the existing facility’s B Wing and C Wing. The design and construction solution shall provide laboratory research and support space for new programs as well as for existing programs that have been identified as priorities for relocation to new construction. The design and construction solution of the building addition shall strategically phase the relocation of as many existing occupancies as possible in order to provide unoccupied area suitable for renovation in subsequent phases. The design and construction solution shall produce an outcome which will minimally impact ongoing research activities.

The addition shall house a new mechanical plant capable of supporting the building addition and produce a design and construction solution that will have capability and capacity to also support as much of the existing facility as possible, in order to enable renovation progression to replace existing mechanical systems with service from the new mechanical plant. At a minimum the design and construction solution for new mechanical plant systems shall have sufficient capacity to serve the building addition and the existing facility’s B Wing areas currently served by the existing mechanical plants housed in the B Wing basement and sub-basement levels.

PAGE 13 OF 119 SB1341-16-RP-0005

The addition shall incorporate new infrastructure for public utilities that both service the addition and are able to extend services throughout the facility in subsequent renovation phases. Utilities included in this design and construction solution strategy include, but are not necessarily limited to:

• New electrical service, including emergency and UPS power backup systems.

• New fire detection and suppression systems.

• New steam and chilled water services.

• New potable water services

• New telephone and data services.

• New Security and Intrusion Detection System (IDS) backbone

• New radioactive drainage distribution and accumulation tanks

At a minimum the design and construction solution for connected utilities shall be sufficient for full occupancy of the addition for the radiological science and operations as required in these documents.

1.1.2. D Wing Addition: The Building 245 Modernization includes the design and construction of a building addition to the existing facility’s D Wing. The design and construction solution shall provide expanded research space for the activities of NIST’s Ultraviolet Radiation Group, Group 685.02.

At a minimum the design and construction solution for connected utilities and environmental control systems (MEP) shall be sufficient for full occupancy of the addition for the radiological science and operations as required in these documents.

1.1.3. Mechanical Systems improvements for A Wing laboratory and spaces: The Building 245 Modernization includes the design and construction of a building addition within or adjacent to the existing facility’s A Wing to meet the HVAC demands of the laboratories and spaces. The design and construction solution shall provide complete new mechanical systems and air distribution ducted network to serve A Wing spaces, housed in new construction, building addition or expansion to existing designated spaces. The Contractor’s design and construction solution shall propose strategic options that integrate other work activities associated with the project objectives (such as sub-grade waterproofing) to minimize facility and utilities operational disruptions.

1.1.4. Renovations to the existing facility: The project shall include the complete phased renovation and modernization of the existing facility, including hazardous material abatement, exterior envelope improvements, replacement of interior finishes, replacement of existing mechanical, electrical and plumbing systems, installation of new fire suppression systems, and upgrades to bring the facility into compliance with Executive Orders for sustainability. The renovations shall include complete removal of all abandoned utilities and abandoned utility infrastructure

1.1.5. The project shall include waterproofing the below grade areas of the entire facility foundation structure. The Contractor shall develop a design and construction

PAGE 14 OF 119 SB1341-16-RP-0005

solution for excavation, de-watering and phased site management performance that sustains full occupancy for the radiological science and operational criteria as required in these documents. The design and construction solution shall include the protection or relocation of existing underground utilities, including the construction of temporary systems, structures and utility by-pass, in conjunction with the work phases.

1.1.6. The project shall include the demolition of the existing G Wing. The Contractor shall develop a design and construction solution for relocating the existing research occupancies in the G Wing and demolishing the G Wing to access building foundation structures below for waterproofing requirements. Portions of the G Wing have had radiological activities previously and are known to contain contaminated materials.

The demolition of the G Wing shall be performed in accordance with the Multi Agency Radiation Survey and Site Investigation Manual (MARSSIM) and the specific radiological safety, survey and operations as required by the full solicitation.

The Contractor’s design and construction solution shall propose strategic options that relocate the existing G-Wing research occupancies to a new building or addition within the operational and technical requirements of the Bldg 245 complex.

1.1.7. The project includes the demolition of the facility’s existing E Wing. The Contractor shall develop a design and construction solution for relocating the existing research occupancies in the E Wing. Portions of the E Wing have had radiological activities previously and are known to contain contaminated materials. The demolition of the E Wing shall be performed in accordance with the Multi Agency Radiation Survey and Site Investigation Manual (MARSSIM)and the specific radiological safety, survey and operations as required by the full solicitation.

1.1.8. The project shall follow the LEED Reference Guide for Green Building Design and

Construction 2009 Edition with addenda. The minimum requirement for the project(s) is to achieve a Silver level LEED Rating. The project, or multiple projects dependent upon the Design Build Contractor’s solution and certification strategy, are required to be registered with, and certified by the Green Building Certification Institute (GBCI). Solutions which conserve energy and improve occupant comfort are encouraged.

1.1.9. The project shall include a design and construction solution that includes pre design studies to establish existing conditions including, but not necessarily limited to, the presence and characterization of hazardous materials, levels of vibration resistance, and effectiveness of existing radiological shielding.

1.1.10. The project shall include a design and construction solution that establishes a concept design for the renovation of the entire facility, including proposed design and construction phases and the anticipated duration for each. The concept design shall provide the framework for planning each phase of the entire project, and shall be updated during each phase based on changing conditions and lessons learned.

PAGE 15 OF 119 SB1341-16-RP-0005

It is the Government's objective that these buildings have a minimum of 25-year useful operational life before a possible re-use/re-purpose or renovation requirement, to include normal sustainment, restoration, modernization activities and a 50-year building replacement life. Therefore, the design and construction shall provide an appropriate level of quality to ensure the continued use of the facility over that time period with the application of reasonable preventive maintenance and repairs that would be industry-acceptable to a major civilian sector project Owner. The site infrastructure shall have at least a 50-year life expectancy with industry accepted maintenance and repair cycles.

The Contractor shall follow this ethos in selection of the quality of materials and methods that will yield the most appropriate type of construction meeting all referenced codes, regulatory compliance and physical security requirements for the facilities based on occupancy and usage, (e.g. radiation physics research).

The Government is required by Public Law 102-486, Executive Order 12902, Executive Order 13514, The Energy Policy Act of 2005 (EPAct), UFC 4-030-01, and Federal Regulations 10 CFR 435 to design and construct facilities in an energy-conserving manner while considering the life cycle cost of facilities. It is a project objective that sustainability and energy performance are addressed in the development of the Campus and buildings.

The U.S. Green Building Council’s (USGBC) LEED (Leadership in Energy and Environmental Design) Green Building Rating System shall be used as the criteria for determination of the project’s compliance with sustainability standards. The building(s) shall follow LEED design criteria. Additionally, the Government desires that each design phase incorporate features that will accommodate future installation of renewable energy generation equipment for a sizable portion of the electrical power demand.

1.2 Project Building Wing Relationships: Building 245 consists of seven distinct “wings”, designated as A, B, C, D, E, F and G, which are arranged on seven separate floors; a sub basement, basement, first, second and third floors, as well as a mechanical attic and elevator penthouse.

Building organization is generally arranged by floor. The project shall sustain the functional relationships of the existing configurations to the greatest extent possible.

PAGE 16 OF 119 SB1341-16-RP-0005

PAGE 17 OF 119 SB1341-16-RP-0005

C. 2 Task Order 1 Table of Contents

Task Order Number One Table of Contents. Specifications will be issued with Phase II.

SECTION 01 10 00

TABLE OF CONTENTS

1. PROJECT BACKGROUND

1.1. Project objectives

1.1.1. B/C Wing Building Addition

1.1.2. D Wing Addition

1.1.3. Mechanical Systems improvements for A Wing laboratories and spaces

1.1.4. Renovations to the existing facility

1.1.5. Waterproofing

1.1.6. G Wing demolition

1.1.7. E Wing demolition

1.1.8. LEED

1.1.9. Pre-Design Studies

1.1.10. Whole Facility Concept Design

2. SCOPE

2.1. General

2.2. Design and Construction Scope

2.3. Phasing Design Scope/Additional Optional Construction Scope

2.4. Site

2.5. Government Furnished Government Installed Equipment

2.6. Furniture, Fixtures and Equipment

2.7. NCPC Submission Support

2.8. Maryland Historic Trust Support

2.9. Design After Award:

2.9.1. General

2.9.1.1 Design of laboratory and storage areas

2.9.1.2 Design of administrative areas

2.9.1.3 Submittals

2.9.1.4 Drawing Development

2.9.1.5 Design Submittals

2.9.1.5.1. Distribution, Media and Quantities

2.9.1.6 Pre-Design Studies

2.9.1.6.1. Micro-level programming as basis of test fit

2.9.1.6.2. Conveyance System Study

2.9.1.6.3. Block and Stack Diagram

2.9.1.7 Pre-Concept Design (10% Submittal)

2.9.1.7.1. Conference Requirements

2.9.1.8 Design Conferences

2.9.1.9 Building Asset Management

2.9.2. Site Investigations

2.9.2.1 Site Survey

2.9.2.2 Field Measurements

2.9.2.3 Existing Utilities

2.9.2.4 Laboratory Equipment

2.9.2.4.1. Protection of existing scientific equipment

Section 01 10 00-Page 1

UNCLASSIFIED// FOR OFFICAL USE ONLY

PAGE 18 OF 119 SB1341-16-RP-0005

2.9.2.5 Hazardous materials

2.9.2.5.1. Environmental Engineer

2.9.2.5.2. Radioactive material management specialists

2.9.2.6 Vibration Resistance

2.9.2.7 Life Safety Compliance

2.9.2.8 Accessibility

2.9.3. Shielded Spaces

2.9.4. Design Submission Review Process

2.9.4.1 General

2.9.4.2 NIST Gaithersburg Radiation Safety Division review

2.9.4.2.1. Review of shielding requirements for new construction/renovation

2.9.4.2.2. Review remediation requirements

2.9.4.3 NIST Security review

2.9.4.4 NIST Telecommunications and Data review

2.9.5. Coordination with other Disciplines

2.9.5.1 General

2.10. Project schedules

2.10.1. Design and Construction Scope Schedule

2.10.2. Phasing Design/Additional Optional Construction Scope Schedules

2.10.2.1 Coordination with existing occupancies-notification schedule

2.10.2.2 Coordination with existing occupancies-shutdown schedule

2.11. Existing occupancies and continuity of existing operations

2.12. Temporary Construction Facilities

2.13. Governmental Safety Requirements

2.14. Commissioning, General

2.15. Specialty Personnel

2.15.1. Project Manager(s)

2.15.2. Construction Superintendent(s)

2.15.3. Project Safety Manager(s)

2.15.4. Certified Health Physicist

2.15.5. Radiation Physicist

2.15.6. Radiological engineer

2.15.7. Security Escort(s)

2.15.8. Scheduler(s)

2.15.9. Additional information:

2.16. Submissions for Awards

2.17. Presentation of Design

3. FUNCTIONAL AND AREA REQUIREMENTS

3.1. General

3.1.1. Building Wing relationships

3.1.2. Room numbering

3.1.3. Laboratory and storage space requirements

3.1.4. Administrative space requirements

3.1.5. Gross building area

3.1.6. Handicap access

3.1.7. Site orientation

3.1.7.1 B/C Wing Building addition

Section 01 10 00-Page 2

PAGE 19 OF 119 SB1341-16-RP-0005

3.1.7.2 D Wing addition

3.1.7.3 A Wing mechanical improvements

3.1.8. Design freedom

3.1.8.1 General

3.1.8.2 B/C Wing Building Addition

3.2. Site

3.2.1. Roads

3.2.2. Vehicular Parking

3.2.3. Pedestrian Circulation

3.2.4. Pavements

3.2.5. Site Grading

3.2.6. Site Security

3.2.7. Security Infrastructure and Lighting

3.2.8. Stormwater Management (SWM)

3.2.9. Erosion and Sediment Control

3.2.10. Site Utilities

3.2.10.1 Domestic Water

3.2.10.2 Storm Drainage

3.2.10.3 Fire Protection Water

3.2.10.4 Sanitary Sewer

3.2.10.5 Electrical General

3.2.10.6 Telecommunications

3.3. B/C Wing Building Addition

3.3.1. Architectural

3.3.1.1 Laboratories and functional areas

3.3.1.2 Loading dock and bulk shipping/receiving area

3.3.1.3 Radioactive Waste Sanitary Storage System

3.3.1.4 Vertical transportation systems

3.3.1.5 New mechanical plant

3.3.1.6 Electrical service

3.3.1.7 Data service

3.3.1.8 Vending areas and break rooms

3.3.1.9 Occupancy identification

3.3.1.10 Common areas

3.3.2. Structural

3.3.3. Mechanical

3.3.3.1 General HVAC

3.3.3.2 Supply Air System

3.3.3.3 Exhaust

3.3.3.4 Specialized HVAC

3.3.3.5 Specialized Exhaust

3.3.3.6 Cooling System

3.3.3.7 Heating System

3.3.3.8 EMCS

3.3.3.9 Energy Conservation Measures

3.3.3.9.1. Recovery methods

3.3.3.9.2. Energy Use or Peak Load Reduction methods

3.3.4. Plumbing

Section 01 10 00-Page 3

PAGE 20 OF 119 SB1341-16-RP-0005

3.3.4.1 Potable Water

3.3.4.2 Non-Potable Water

3.3.4.3 Sanitary Sewer

3.3.4.4 Storm Sewer

3.3.4.5 Laboratory Waste System

3.3.4.6 Graywater System

3.3.4.7 Sanitary Vent

3.3.4.8 Laboratory Vent

3.3.4.9 Laboratory Gases

3.3.4.10 Deionized Water System

3.3.4.11 Natural Gas System

3.3.5. Fire Protection

3.3.5.1 Fire Suppression

3.3.5.2 Fire Alarm / Mass Notification

3.3.5.3 Fire extinguishers

3.3.5.4 Separation from existing facility

3.3.6. Electrical

3.3.6.1 General

3.3.6.2 Power Distribution/Electric Service

3.3.6.3 Generator

3.3.6.4 UPS

3.3.6.5 Monitoring

3.3.6.6 Grounding

3.3.6.7 Lightning Protection

3.3.6.8 Lighting

3.3.7. Telecommunications

3.3.7.1 General

3.3.7.2 Grounding

3.3.8. Security

3.3.8.1 General

3.3.8.2 Security Equipment Room

3.3.8.3 Infrastructure

3.3.9. Radon Collection

3.4. B Wing Coordination

3.4.1. Structural

3.4.1.1 Underpinning and Sheeting and Shoring

3.4.2. Mechanical

3.4.2.1 General

3.4.2.2 Supply and Return air coordination

3.4.2.3 Cooling and Heating Utilities

3.4.2.4 Plumbing

3.4.3. Fire Protection

3.4.3.1 Fire Suppression

3.4.3.2 Fire Alarm

3.4.4. Electrical

3.4.5. Telecommunications

3.4.6. Security

3.4.6.1 Intermediate Security Equipment Rooms

Section 01 10 00-Page 4

PAGE 21 OF 119 SB1341-16-RP-0005

3.5. C Wing Coordination

3.5.1. Structural

3.5.1.1 Underpinning and Sheeting and Shoring

3.5.2. Mechanical:

3.5.2.1 General

3.5.2.2 Supply and Return air coordination

3.5.2.3 Cooling and Heating Utilities

3.5.2.4 Plumbing

3.5.3. Fire Protection:

3.5.3.1 Fire suppression

3.5.3.2 Fire Alarm

3.5.4. Electrical

3.5.5. Telecommunications

3.5.6. Security

3.5.6.1 Intermediate Security Equipment Rooms

3.6. D Wing Addition

3.6.1. Architectural

3.6.1.1 Laboratories and functional areas

3.6.1.2 Loading areas

3.6.1.3 Vertical transportation system

3.6.1.4 Stair

3.6.1.5 D Wing mechanical plant

3.6.2. Structural

3.6.3. Mechanical

3.6.3.1 General HVAC

3.6.3.2 Supply Air System

3.6.3.2.1. Supply and Return air coordination

3.6.3.3 Exhaust

3.6.3.4 Specialized HVAC

3.6.3.5 Specialized Exhaust

3.6.3.6 Cooling System

3.6.3.7 Heating System

3.6.3.8 EMCS

3.6.3.9 Energy Conservation Measures

3.6.3.9.1. Energy recovery methods

3.6.3.9.2. Energy Use or Peak Load Reduction methods

3.6.4. Plumbing

3.6.4.1 Potable Water

3.6.4.2 Non-Potable Water

3.6.4.3 Sanitary Sewer

3.6.4.4 Storm Sewer

3.6.4.5 Laboratory Waste System

3.6.4.6 Graywater System

3.6.4.7 Sanitary Vent

3.6.4.8 Laboratory Vent

3.6.4.9 Laboratory Gases

3.6.4.10 Deionized Water System

3.6.4.11 Natural Gas System

Section 01 10 00-Page 5

PAGE 22 OF 119 SB1341-16-RP-0005

3.6.5. Fire Protection

3.6.5.1 Fire Suppression

3.6.5.1.1. Coordination with D Wing Space Renovations

3.6.5.1.2. Coordination with Interior Renovations in Other Building Wings

3.6.5.2 Fire Alarm / Mass Notification

3.6.5.3 Fire Extinguishers

3.6.6. Electrical

3.6.6.1 General

3.6.6.2 Power Distribution

3.6.6.3 Generator

3.6.6.4 UPS

3.6.6.5 Monitoring

3.6.6.6 Grounding

3.6.6.7 Lightning Protection

3.6.6.8 Lighting

3.6.7. Telecommunications

3.6.8. Security

3.6.8.1 General

3.6.8.2 Infrastructure

3.6.9. Radon Collection

3.7. D Wing Mechanical Improvements, D Wing Space Renovations

3.7.1. Architectural

3.7.1.1 General

3.7.1.2 Exterior envelope

3.7.1.3 Waterproofing

3.7.2. Structural

3.7.3. Mechanical

3.7.3.1 General HVAC

3.7.3.2 Supply, Return, Relief and Outdoor Air System

3.7.3.3 Exhaust

3.7.3.4 Specialized HVAC

3.7.3.5 Specialized Exhaust

3.7.3.6 Cooling System Henry Adams

3.7.3.7 Heating System

3.7.3.8 EMCS

3.7.3.9 Energy Conservation Measures

3.7.3.9.1. Energy recovery methods

3.7.3.9.2. Energy Use or Peak Load Reduction methods

3.7.4. Plumbing

3.7.4.1 Potable Water

3.7.4.2 Non-Potable Water

3.7.4.3 Sanitary Sewer

3.7.4.4 Storm Sewer

3.7.4.5 Laboratory Waste System

3.7.4.6 Graywater System

3.7.4.7 Sanitary Vent

3.7.4.8 Laboratory Vent

3.7.4.9 Laboratory Gases

Section 01 10 00-Page 6

PAGE 23 OF 119 SB1341-16-RP-0005

3.7.4.10 Deionized Water System

3.7.4.11 Natural Gas System

3.7.5. Fire Protection

3.7.5.1 Fire Suppression

3.7.5.2 Coordination with Interior Renovations in Other Building Wings

3.7.5.3 Fire Alarm / Mass Notification

3.7.5.4 Fire Extinguishers

3.7.6. Electrical

3.7.6.1 General

3.7.6.2 Power Distribution

3.7.6.3 Generator

3.7.6.4 UPS

3.7.6.5 Monitoring

3.7.6.6 Grounding

3.7.6.7 Lightning Protection

3.7.6.8 Lighting

3.7.7. Telecommunications

3.7.8. Security

3.7.8.1 General

3.7.8.2 Infrastructure

3.7.8.3 Security Equipment Room

3.7.9. Radon Collection

3.8. A Wing Mechanical Improvements, A Wing Space Renovations

3.8.1. Architectural

3.8.1.1 General

3.8.1.2 Exterior envelope

3.8.1.3 Waterproofing

3.8.2. Structural

3.8.3. Mechanical

3.8.3.1 General HVAC

3.8.3.2 Supply Air System

3.8.3.3 Exhaust

3.8.3.4 Specialized HVAC

3.8.3.5 Specialized Exhaust

3.8.3.6 Cooling System

3.8.3.7 Heating System

3.8.3.8 EMCS

3.8.3.9 Energy Conservation Measures

3.8.3.9.1. Energy recovery methods

3.8.3.9.2. Energy Use or Peak Load Reduction methods

3.8.4. Plumbing

3.8.4.1 Potable Water

3.8.4.2 Non-Potable Water

3.8.4.3 Sanitary Sewer

3.8.4.4 Storm Sewer

3.8.4.5 Laboratory Waste System

3.8.4.6 Graywater System

3.8.4.7 Sanitary Vent

Section 01 10 00-Page 7

PAGE 24 OF 119 SB1341-16-RP-0005

3.8.4.8 Laboratory Vent

3.8.4.9 Laboratory Gases

3.8.4.10 Reagent Water System

3.8.4.11 Natural Gas System

3.8.5. Fire Protection

3.8.5.1 Fire Suppression

3.8.5.2 Coordination with Interior Renovations in Other Building Wings

3.8.5.3 Fire Alarm / Mass Notification

3.8.5.4 Fire Extinguishers

3.8.6. Electrical

3.8.6.1 General

3.8.6.2 Power Distribution

3.8.6.3 Generator

3.8.6.4 UPS

3.8.6.5 Monitoring

3.8.6.6 Grounding

3.8.6.7 Lightning Protection

3.8.6.8 Lighting

3.8.7. Telecommunications

3.8.8. Security

3.8.8.1 General

3.8.8.2 Infrastructure

3.8.8.3 Security Equipment Room

3.8.9. Radon Collection

3.9. G Wing Coordination

3.9.1. Architectural

3.9.1.1 General

3.9.1.2 Exterior envelope

3.9.2. Structural

3.9.3. Mechanical

3.9.3.1 General HVAC

3.9.3.2 Cooling System

3.9.3.3 Heating System

3.9.3.4 EMCS

3.9.3.5 Energy Conservation Measures

3.9.3.5.1. Energy recovery methods

3.9.3.5.2. Energy Use or Peak Load Reduction methods

3.9.4. Plumbing:

3.9.4.1 Potable Water

3.9.4.2 Non-Potable Water

3.9.4.3 Sanitary Sewer

3.9.4.4 Storm Sewer

3.9.4.5 Laboratory Waste System

3.9.4.6 Graywater System

3.9.4.7 Sanitary Vent

3.9.4.8 Laboratory Vent

3.9.4.9 Laboratory Gases

3.9.4.10 Deionized Water System

Section 01 10 00-Page 8

PAGE 25 OF 119 SB1341-16-RP-0005

3.9.4.11 Natural Gas System

3.9.5. Fire Protection:

3.9.5.1 Fire Suppression

3.9.5.2 Fire Alarm / Mass Notification

3.9.5.3 Fire Extinguishers

3.9.6. Electrical

3.9.6.1 General

3.9.6.2 Power Distribution

3.9.6.3 Monitoring

3.9.6.4 Grounding

3.9.6.5 Lightning Protection

3.9.6.6 Lighting

3.9.7. Telecommunications

3.9.8. Security

3.10. B Wing Mechanical Improvements, B Wing Space Renovations

3.10.1. Architectural

3.10.1.1 General

3.10.1.2 Exterior envelope

3.10.1.3 Waterproofing

3.10.2. Structural

3.10.3. Mechanical

3.10.3.1 General HVAC

3.10.3.2 Supply Air System

3.10.3.3 Exhaust

3.10.3.4 Specialized HVAC

3.10.3.5 Specialized Exhaust

3.10.3.6 Cooling System

3.10.3.7 Heating System

3.10.3.8 EMCS

3.10.3.9 Terminal settings

3.10.3.10 Rate of change

3.10.3.11 Energy Conservation Measures

3.10.3.11.1. Energy recovery methods

3.10.3.11.2. Energy Use or Peak Load Reduction methods

3.10.4. Plumbing

3.10.4.1 Potable Water

3.10.4.2 Non-Potable Water

3.10.4.3 Sanitary Sewer

3.10.4.4 Storm Sewer

3.10.4.5 Laboratory Waste System

3.10.4.6 Graywater System

3.10.4.7 Sanitary Vent

3.10.4.8 Laboratory Vent

3.10.4.9 Laboratory Gases

3.10.4.10 Deionized Water System Water System

3.10.4.11 Natural Gas System

3.10.5. Fire Protection:

3.10.5.1 Fire Suppression

Section 01 10 00-Page 9

PAGE 26 OF 119 SB1341-16-RP-0005

3.10.5.2 Coordination with Interior Renovations in Other Building Wings

3.10.5.3 Fire Alarm / Mass Notification

3.10.5.4 Fire Extinguishers

3.10.6. Electrical:

3.10.6.1 General

3.10.6.2 Power Distribution

3.10.6.3 Generator

3.10.6.4 UPS

3.10.6.5 Monitoring

3.10.6.6 Grounding

3.10.6.7 Lightning Protection

3.10.6.8 Lighting

3.10.7. Telecommunications

3.10.8. Security

3.10.8.1 General

3.10.8.2 Infrastructure

3.10.8.3 Security Equipment Room

3.10.9. Radon Collection

3.11. C Wing Sub Basement and Basement Mechanical Improvements & Space

Renovations

3.11.1. Architectural

3.11.1.1 General

3.11.1.2 Waterproofing

3.11.2. Structural

3.11.3. Mechanical

3.11.3.1 General HVAC

3.11.3.2 Supply Air System

3.11.3.3 Exhaust

3.11.3.4 Specialized HVAC

3.11.3.5 Specialized Exhaust

3.11.3.6 Cooling System

3.11.3.7 Heating System

3.11.3.8 EMCS

3.11.3.9 Energy Conservation Measures

3.11.3.9.1. Energy recovery methods

3.11.3.9.2. Energy Use or Peak Load Reduction methods

3.11.4. Plumbing:

3.11.4.1 Potable Water

3.11.4.2 Non-Potable Water

3.11.4.3 Sanitary Sewer

3.11.4.4 Storm Sewer

3.11.4.5 Laboratory Waste System

3.11.4.6 Graywater System

3.11.4.7 Sanitary Vent

3.11.4.8 Laboratory Vent

3.11.4.9 Laboratory Gases

3.11.4.10 Deionized Water System Water System

3.11.4.11 Natural Gas System

Section 01 10 00-Page 10

PAGE 27 OF 119 SB1341-16-RP-0005

3.11.5. Fire Protection

3.11.5.1 Fire Suppression

3.11.5.2 Coordination with Interior Renovations in Other Building Wings

3.11.5.3 Fire Alarm / Mass Notification

3.11.5.4 Fire Extinguishers

3.11.6. Electrical:

3.11.6.1 General

3.11.6.2 Power Distribution

3.11.6.3 Generator

3.11.6.4 UPS

3.11.6.5 Monitoring

3.11.6.6 Grounding

3.11.6.7 Lightning Protection

3.11.6.8 Lighting

3.11.7. Telecommunications

3.11.8. Security

3.11.8.1 General

3.11.8.2 Infrastructure

3.11.8.3 Security Equipment Room

3.11.9. Radon Collection

3.12. C Wing 1st, 2nd & 3rd Floor Mechanical Improvements and Space…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .