SOW_FOR_AMENDMENT_003.pdf
PDF 563 KB Posted
- Solicitation number
- SB1341-15-RQ-0636
About this file
Amendment 003 - Attachment II
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_005.pdf | ||
| SOW_for_Amendment_005.pdf | ||
| Amendment_004.pdf | ||
| Amendment_003.pdf | ||
| Amendment_003_Attachment_I.pdf | ||
| Amendment_002.pdf | ||
| ISSUED_RFQ.pdf | ||
| Amendment_001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Quotation Number SB1341-15-RQ-0636
Statement of Work
Amendment 003
BACKGROUND
The National Institute of Standards and Technology (NIST) include three (3) Directorates that use MTS instruments to support its mission. Two of these Directorates are the Engineering Laboratory (EL) and the Material Measurement
Laboratory (MML).
The EL promotes U.S. innovation and industrial competitiveness in areas of critical national priority by anticipating and meeting the measurement science and standards needs for technology-intensive manufacturing and construction Staff members serve on about 130 committees and working groups, many in leadership positions. For example, the output of
EL research is a source of technical information for (ASHRAE), the American Society of Mechanical Engineers (ASME), the American Institute of Steel Construction (AISC),, Underwriters Laboratories, Inc. (UL), the International Organization for Standardization (ISO), the International Council for Research and Innovation in Building and Construction (CIB), the
International Code Council (ICC), and the Construction Industry Institute.
The Material Measurement Laboratory is one of seven metrology laboratories within the National Institute of Standards and Technology (NIST). The laboratory supports the NIST mission by serving as the national reference laboratory for measurements in the material sciences. Our activities range from fundamental and applied research on the composition, structure and properties of industrial, materials and processes, to the development and dissemination of tools including reference measurement procedures, certified reference materials, critically evaluated data, and best practice guides that help assure measurement quality. Our research and measurement services support areas of national importance, such as
Manufacturing, from lightweight alloys for fuel-efficient automobiles to biomanufacturing and data for chemical manufacturing
MTS Systems Corporation (hereafter referred to as MTS) instruments owned and used by EL and MML are identified in
Section II of this Statement of Work (SOW).
SCOPE OF WORK
The Contractor shall provide service for the calibration, maintenance, training, and/or repair of the MTS instruments and associated components identified in Table 1. Service shall be provided upon issuance of task orders by the Government.
The Government reserves the right to add additional NIST-owned MTS instruments, possibly with associated components, to this statement of work via a bilateral contract modification should a need be identified.
GENERAL REQUIREMENTS
While on the NIST campus, the Contractor shall abide by all NIST rules and regulations pertaining to visitors
The Contractor shall provide all information necessary for the NIST Technical Point of Contact (TPOC) to authorize entrance to the NIST campus in accordance with NIST Security Policy and Procedures. Due to the timeline required to register non-US citizens, the Government prefers that service personnel be U.S. Citizens.
The period of performance is for a base period of one year with four one-year option periods. The Contractor shall perform the specific requirements identified herein for the life of the contract based upon issuance of task orders.
Completion of task orders must result in the instrument performing in accordance with manufacturers’ specifications.
SPECIFIC REQUIREMENTS
The following services shall be provided by the Contractor if ordered via task order. The task order will identify the specific work required. Task orders will be issued on a firm fixed price or time and materials basis. The Government anticipates that the majority of task order will be issued on a firm fixed price basis.
Diagnostic Visits
In the event of an instrument failure, the Contractor shall provide a single on-site visit to the site where the equipment is housed to diagnose the required problem and provide a quotation for a repair including all parts, labor and travel. The http://www.nist.gov/public_affairs/mission.cfm http://www.nist.gov/mml/mfg.cfm
Contractor shall exhort every effort to be on-site not later than 48 hours from the date they are contacted about the instrument failure. The Contractor must be on-site within 72 hours from the date they are contacted about the instrument failure.
During the diagnostic visit, the Contractor shall diagnose the problem. The Contractor shall provide a quotation to repair the equipment inclusive of all required parts, labor and travel. A parts list and the required delivery time for the repair must be included in the quotation. The complete quotation must be provided by the Contractor to the Contracting
Officer’s Representative (COR) not later than two business days after the diagnostic visit is completed, however, it is preferred that the quotation is provided prior to departing from the diagnostic visit. The Government will review the quotation and may issue a task order to complete the repair. The Contractor shall not utilize the diagnostic visit to repair the equipment or incur any cost outside of the cost of the diagnostic visit.
Maintenance and Repair Services
All parts and fluids shall be approved for use with the instrument by MTS.
The Contractor shall only employ tools, instruments, test apparatus, methodologies, techniques, and practices approved for use with the instrument by the manufacturer.
While performing maintenance, the Contractor shall adhere to all the service protocols and instrument specifications identified in the most recent version of the operation and maintenance manuals for the specific piece of equipment.
The standard manufacturer’s warranty for parts and labor shall apply to all completed repairs.
The Contractor shall respond to service calls Monday through Friday, during regular business hours only. The Contractor shall provide a service technician/engineer on-site at NIST Gaithersburg, MD and/or NIST, Boulder, CO, not later than 72 hours after the task order is issued by the Government. No weekend service visits shall be required.
All service provided under task orders shall be provided by trained personnel who are fluent in the operation of the covered instrument and/or third party accessories.
In the event that the Contractor is unable to resolve the problem during the service call, the Contractor shall provide telephone support and on-site support as needed to expedite a solution for NIST.
The Contractor shall be responsible to obtain all parts required for all repairs and maintenance. The Contractor shall make a commercially reasonable effort to secure parts within 72 hours after identifying the need for a replacement part for the covered equipment. Note: Due to the custom nature of MTS systems certain parts, components and/or software upgrades must be built to meet each unique system and therefore delivery within a 72 hour time frame will not be possible.
Replacement parts provided under this agreement may be either new or remanufactured and the Contractor may exchange and/or repair existing components.
All repairs shall result in the MTS instruments meeting all manufacturer’s specifications identified in the most recent version of the operation and maintenance manual for the covered equipment.
Any parts or components removed for replacement shall become the property of the NIST unless otherwise agreed to by the Contractor and NIST. The Contractor shall remove its parts or components from the NIST campus at the time of the service call, or provide shipping instructions and return shipping information that NIST may return the parts to the
Contractor within three days after the service visit is completed. The Contractor shall assume all charges and liability for all shipments.
In the event that a component needs to be repaired off-site, the Contractor shall be responsible for all packaging, shipping and transportation costs as well as liability for the shipment to and from any NIST site. The Contractor shall be responsible for providing a “Return Authorization Number” or other information authorizing return of the shipment to their facility prior to the shipment.
Maintenance visits shall occur during NIST’s regular business hours as specified herein. Upon issuance of a task order, the NIST Technical Point of Contact (TPOC) will contact the Contractor to schedule a mutually acceptable date and time for the maintenance visit. All visits shall be scheduled in advance.
All repairs shall be provided by trained personnel who are fluent in the operation of the covered instrument and/or third party accessories.
Calibration
The Contractor shall provide calibration services that provide traceability to the International System of Units (SI; refer to http://en.wikipedia.org/wiki/International_System_of_Units for more information) for load cells (Force), actuators
(length), and extensometers (length). Calibration services shall include transferring the results of the calibration into the test machine control software. These calibration services shall be accredited by a national mechanical testing accrediting body, and shall be conformable to appropriate ASTM, ISO, or NADCAP specifications.
All calibrations shall be traceable to the SI.
At a minimum, the Contractor shall provide calibrations for load cells (Force), actuators (displacement), and extensometers (strain/displacement).
All calibrations shall conform to the appropriate standard specification. Typically these standards are from ISO and
ASTM, though when appropriate and a consensus calibration standard does not exist, manufacturer’s calibrations may be acceptable.
All parts and fluids shall be approved for use with the instrument by MTS.
All calibrations shall be provided by trained personnel who are fluent in the operation of the covered instrument and/or third party accessories.
Training
The Contractor shall provide training services for MTS hardware and software used on the instruments. This training may occur on-site at the NIST Gaithersburg, MD campus or the NIST Boulder campus or an an off-site location. Task orders for training shall identify the venue for the training.
Training topics may include: preventive maintenance on MTS products, training on MTS hardware products, software training, and calibration of MTS products.
Training shall occur during regular business hours. The Contractor shall be responsible for all labor and travel costs for their personnel for all training sessions.
Software Upgrades and Updates
The Government may issue task orders to purchase commercial software upgrades and/or updates for the purpose of instrument optimization. The software upgrades and/or updates must be delivered not later than three (3) business days http://en.wikipedia.org/wiki/International_System_of_Units after issuance of a task order. The task order will identify the make, model and serial number of the equipment as well as the required software upgrade and/or update.
Telephone Support
The Contractor shall provide telephone support for the covered equipment, hardware and software, during regular business hours. Telephone support shall include responses to questions about operating practices, application use, and service issues that can be diagnosed and/or resolved over the telephone.
The Government prefers that the Contractor provide this service at no charge to the Government, however, may issue a single task order on an annual basis for telephone support for all covered equipment at a firm fixed price negotiated between the Contractor and the Government.
LIST OF COVERED EQUIPMENT
Over the life of this contract, the Contractor shall provide repairs for the equipment in Table 1. The equipment in Table 1 is the only equipment that is covered under this contract. Reference Table 1 at the end of this Statement of Work.
ACCEPTANCE/INSPECTION BY THE GOVERNMENT
The Government reserves the right to conduct quality assurance testing to confirm that a given instrument meets the manufacturer’s performance specifications. All Government testing will be completed within five (5) working days of the completion date of a maintenance or repair visit.
DELIVERABLES AND DELIVERABLE DUE DATES
The Contractor shall submit a service ticket prior to departure from NIST on any given service call for maintenance or repairs. The service ticket shall include the following for the MTS instruments:
-Model number.
-Serial number.
-Date and time of arrival to NIST.
-Description of service performed.
-Name and quantity of any parts that were repaired.
-Name and quantity of any parts that were replaced.
-Date and time of departure from NIST.
-Total hours spent on the service call.
-Any repair credits from parts purchased by NIST from MTS.
-Diagnostic test results or narrative summary demonstrating that the MTS instrument is meeting the performance standards.
-Any additional comments or recommendations.
-Printed name and signature of MTS service person.
-Signature block for NIST personnel accepting the services rendered.
PERIOD OF PERFORMANCE AND PLACE OF PERFORMANCE
The period of performance shall be for one (1) year base period with four one year option periods. The period of performance shall not exceed five (5) years.
Performance shall be at NIST, 100 Bureau Drive, Gaithersburg, MD and/or NIST, 325 Broadway, Boulder, CO campuses.
GOVERNMENT-FURNISHED PROPERTY, DATA AND/OR INFORMATION
The Government shall provide visitor’s access to the NIST facilities during the performance of this contract.
Due to timelines associated with clearance of non-US citizens, personnel performing repairs must be US citizens.
CONTRACTOR’S MINIMUM QUALIFICATIONS
The Contractor shall provide engineers or technicians during the performance of this requirement that are fluent in the operation of the equipment required to be repaired. Contractor personnel shall have at least two (2) years of experience on one or more of the MTS instrument or third party accessory in this requirement.
SECURITY
NIST is a restricted campus. An identification badge is required for access for entry into buildings and also is shown to the armed Security Police when entering the campus. Contractor personnel must wear the identification badge issued by
NIST Security while working at any NIST campus.
REGULAR BUSINESS HOURS
Regular business hours are Monday through Friday, 8:00 am to 5:00 pm local time.
VEHICLE REGISTRATION
All Contractor employees must register their vehicles with the NIST Security Office to gain access to the campus. A valid driver’s license, Government-furnished civilian ID, proof of insurance and current registration must be presented to the
NIST Security Office, at which time a NIST vehicle pass will be issued. The pass shall be displayed on the vehicle in accordance with NIST Security Office instructions.
ADDENDUM TO BILLING INSTRUCTIONS
In addition to the information required by NIST LOCAL CLAUSE 04 entitled “Billing Instructions”, the Contractor shall also include all of the following with each invoice:
-A copy of the delivery ticket provided to NIST for the service call being billed;
-The model number of the instrument repaired; and
-The serial number of the instrument repaired.
Table 1
OU Div Frame S/N
NIST
Tag Location Building Room Model Description Type Contact
AMENDMENT 003
EL 731 Criterion45 449662 N/A Gaithersburg 226 B337
100 KN (S/N
449662) Load
Cell Load Cell
EL 731 Criterion45 441921 N/A Gaithersburg 226 B337
10 KN (S/N
441921) Load
EL 731 Criterion45 471881 N/A Gaithersburg 226 B337
5KN (S/N
471881) Load
EL 731 Criterion45 469754 N/A Gaithersburg 226 B337 non-fatigue
1 KN (S/N
469754) Load
EL 731 Criterion45 12062801 N102939 Gaithersburg 226 B337 LX 500 laser extensometer extensometer
EL 731 Criterion45 5000335 N102941 Gaithersburg 226 B337 Criterion 45
(MTS)
electromechanical test machine Test Frame
EL 731 EL-22kip 1137 510024 Gaithersburg 226 B337 22kip frame
150kN servohydraulic test frame Test Frame
EL 731 EL-22kip N/A 627257 Gaithersburg 226 B337 remote control
(627257) Miscellaneous
EL 731 EL-22kip N/A 635094 Gaithersburg 226 B337
Teststar II controller; power unit Controller
EL 731 EL-22kip N102940 N/A Gaithersburg 226 B337 N/A actuator Actuator
EL 731 EL-22kip 10390258B N/A Gaithersburg 226 B337 6.32.26E-20 extensometer extensometer
EL 731 EL-22kip 400883 N/A Gaithersburg 226 B337 6.34.12E-24 extensometer extensometer
EL 731 EL-22kip 458218 N/A Gaithersburg 226 B337 fatigue
25 KN (S/N
458218) Load
EL 731 EL-22kip 110529 N/A Gaithersburg 226 B337
10KN (S/N
110529) Load
EL 731 EL-22kip 406170 N/A Gaithersburg 226 B337
1KN (S/N
406170) Load
EL 731 EL-22kip 315116 N/A Gaithersburg 226 B337
2 0.22 KN
(315116) Load
EL 731 EL-22kip N/A N/A Gaithersburg 226 B337 5 gpm servovalve; Servovalve
EL 731 EL-StrongFloor 105 N/A Gaithersburg 202 204.32
Servoram: 50 kip, 6 inch stroke Actuator
EL 731 EL-StrongFloor 219 N/A Gaithersburg 226 A160 204.23 Servoram: 10 kip, Actuator
6 inch stroke
EL 731 EL-StrongFloor 221 N/A Gaithersburg 226 B151 204.23 Servoram: 10 kip, 6 inch stroke Actuator
EL 731 EL-StrongFloor 188 533210 Gaithersburg 422 204.91
Actuator: 220 kip, 6 inch stroke Actuator
EL 731 EL-StrongFloor No tag
NBS #
545468 Gaithersburg 422 No tag
Actuator: 50 kip, 12 inch stroke Actuator
EL 731 EL-StrongFloor N/A 586978 Gaithersburg 226 B151 407 Controller Controller
EL 731 EL-StrongFloor N/A 586979 Gaithersburg 226 B151 407 Controller Controller
EL 731 EL-StrongFloor 0154728 N/A Gaithersburg 202 510.30A
Hydraulic Power
Supply: 30 gpm
Hydraulic
Power Unit
EL 731 EL-StrongFloor 286 N/A Gaithersburg 202 284.15 Line Tamer
Service
Manifold
EL 731 EL-StrongFloor 275 N/A Gaithersburg 202 284.15 Line Tamer
EL 731 EL-StrongFloor 226 510023 Gaithersburg 226 B151 290.1 Service Manifold
EL 731 EL-StrongFloor 287 N/A Gaithersburg 226 B151 284.15 Line Tamer
EL 731 EL-StrongFloor N/A N/A Gaithersburg 226 B151 284 Line Tamer
EL 731 EL-StrongFloor 102 N/A Gaithersburg 202 3117-101
Lebow load cell:
50 kip Load cell
EL 731 EL-StrongFloor 173 N/A Gaithersburg 226 A160 3116-103
10 kip Load cell
EL 731 EL-StrongFloor 172 N/A Gaithersburg 226 B151 3116-103
10 kip Load cell
EL 731 EL-StrongFloor 280 637849 Gaithersburg 422 661.31A-02 Load cell Load cell
EL 731 EL-StrongFloor 149 N/A Gaithersburg 422 3117-103
50 kip Load cell
EL 731 EL-StrongFloor 35 N/A Gaithersburg 202 305.03
Test frame: 3 column, 50 kip dynamic, 100 kip static Test frame
EL 733 EL-22kip N/A 635105 Gaithersburg 226 B337 grip controller Grip
MTS GRIP
CONTROLLER PART
#525473-01
EL 733 EL-22kip N/A 638146 Gaithersburg 226 B337 grip Grip
MTS GRIPS MODEL
#647-10A
EL 733 EL-22kip N/A 638147 Gaithersburg 226 B337 grip Grip MTS GRIPS MODEL
#647-10A
EL 733 NFRL LA2205WG A225009 Gaithersburg 206 126 3CQ2380CP2 Monitor Electronics
COMPUTER
MONITOR - YES
EL 733 NFRL 10380948A N/A Gaithersburg 205 127 201.45 Actuator Actuator
EL 733 NFRL 10380948B N/A Gaithersburg 205 127 201.45 Actuator Actuator
EL 733 NFRL 10384876A N/A Gaithersburg 205 127 201.7 Actuator Actuator
EL 733 NFRL 10384876B N/A Gaithersburg 205 127 201.7 Actuator Actuator
EL 733 NFRL 10329160A N/A Gaithersburg 205 127 201.35T Actuator Actuator
EL 733 NFRL 10329160B N/A Gaithersburg 205 127 201.35T Actuator Actuator
EL 733 NFRL 10329160C N/A Gaithersburg 205 127 201.35T Actuator Actuator
EL 733 NFRL 10329160D N/A Gaithersburg 205 127 201.35T Actuator Actuator
EL 733 NFRL 10401295A N/A Gaithersburg 205 127 201.35T Actuator Actuator
EL 733 NFRL 10401295B N/A Gaithersburg 205 127 201.35T Actuator Actuator
EL 733 NFRL 10401295C N/A Gaithersburg 205 127 201.35T Actuator Actuator
EL 733 NFRL 10401295D N/A Gaithersburg 205 127 201.35T Actuator Actuator
EL 733 NFRL 10384512V01 N/A Gaithersburg 205 1 505.90-G2
Hydraulic Power
Unit
EL 733 NFRL 10381465A N/A Gaithersburg 205 127 293.11A-01
Hydraulic Service
Manifold
Hydraulic
EL 733 NFRL 10381465B N/A Gaithersburg 205 127 293.11A-02
Manifold
Hydraulic
EL 733 NFRL 10381465C N/A Gaithersburg 205 127 293.11A-03
Manifold
Hydraulic
EL 733 NFRL 10381465D N/A Gaithersburg 205 127 293.11A-04
Manifold
Hydraulic
EL 733 NFRL 10323529C N/A Gaithersburg 205 127 661.22D-01 Load Cell Load Cell
EL 733 NFRL 10326250D N/A Gaithersburg 205 127 661.22D-01 Load Cell Load Cell
EL 733 NFRL 10323529F N/A Gaithersburg 205 127 661.22D-01 Load Cell Load Cell
EL 733 NFRL 10326250C N/A Gaithersburg 205 127 661.22D-01 Load Cell Load Cell
EL 733 NFRL 10327108D N/A Gaithersburg 205 127 661.22D-01 Load Cell Load Cell
EL 733 NFRL 10328999B N/A Gaithersburg 205 127 661.22D-01 Load Cell Load Cell
EL 733 NFRL 10327108E N/A Gaithersburg 205 127 661.22D-01 Load Cell Load Cell
EL 733 NFRL 10328999A N/A Gaithersburg 205 127 661.22D-01 Load Cell Load Cell
EL 733 NFRL 10327957 N/A Gaithersburg 205 127 661.23F-01 Load Cell Load Cell
EL 733 NFRL 10322894 N/A Gaithersburg 205 127 661.23F-02 Load Cell Load Cell
EL 733 NFRL 10380577 N/A Gaithersburg 205 127 661.34F-01 Load Cell Load Cell
EL 733 NFRL 10380433 N/A Gaithersburg 205 127 661.34F-02 Load Cell Load Cell
EL 733 NFRL 7748 N/A Gaithersburg 205 127 252.24G-01 Servovalve Servovalve
EL 733 NFRL 7427 N/A Gaithersburg 205 127 252.24G-02 Servovalve Servovalve
EL 733 NFRL 7763 N/A Gaithersburg 205 127 252.24G-03 Servovalve Servovalve
EL 733 NFRL 7646 N/A Gaithersburg 205 127 252.24G-04 Servovalve Servovalve
EL 733 NFRL 8888 N/A Gaithersburg 205 127 252.24G-05 Servovalve Servovalve
EL 733 NFRL 8899 N/A Gaithersburg 205 127 252.24G-06 Servovalve Servovalve
EL 733 NFRL 8890 N/A Gaithersburg 205 127 252.24G-07 Servovalve Servovalve
EL 733 NFRL 8896 N/A Gaithersburg 205 127 252.24G-08 Servovalve Servovalve
EL 733 NFRL 8724 N/A Gaithersburg 205 127 252.24G-09 Servovalve Servovalve
EL 733 NFRL 8747 N/A Gaithersburg 205 127 252.24G-10 Servovalve Servovalve
EL 733 NFRL 8706 N/A Gaithersburg 205 127 252.24G-11 Servovalve Servovalve
EL 733 NFRL 8779 N/A Gaithersburg 205 127 252.24G-12 Servovalve Servovalve
EL 733 NFRL 02128586G N103627 Gaithersburg 205 126 494.1 Controller Controller
EL 733 NFRL 2UA245OYLW N103628 Gaithersburg 206 126 C9Q13US#ABA Computer Electronics
HP COMPAQ 8000
ELITE PC
MML 642 Drop Tower N/A 526214 Gaithersburg 231 B115 drop tower Test Frame
NO ADDITIONAL
INFORMATION
PROVIDED
MML 642 High-rate 180133 641640 Gaithersburg 231 B141 651.10E-04
Environmental
Chamber Miscellaneous
MML 642 High-rate 10322507 641641 Gaithersburg 231 B141 505.3 SilentFlo pump
MML 642 High-rate 10317225 641643 Gaithersburg 231 B141 318.50S
High Rate
Servohydraulic Test Frame
MML 642 High-rate 10315602 N/A Gaithersburg 231 B141 244.215 High Rate Actuator Actuator
MML 642 High-rate 0301285A N/A Gaithersburg 231 B141 497.01 Analog Chassis Electronics
MML 642 High-rate N/A N/A Gaithersburg 231 B141 N/A Kistler 5010 load washer Load Cell
MML 642 Instron8502 UK47 N/A Gaithersburg 231 B141 2518-611 100kN Load Cell Load Cell
MML 642 Instron8562 543711 Gaithersburg 223 B239 N/A
Retrofitted drive moter and electronics Miscellaneous
MML 642 Instron8562 Gaithersburg 223 B239 N/A MTS Renew Controller Controller
MML 642 Instron8562 N/A 618876 Gaithersburg 223 B239 50kN load cell Load Cell
MML 642 MTS810 1066845 598306 Gaithersburg 223 B239 318.1 Servohydraulic Load Frame Test Frame
MML 642 MTS810 20120095 N/A Gaithersburg 223 B239 647.10A
100kN Hydraulic
Grips Grip
MML 642 MTS810 1064825 N/A Gaithersburg 223 B239 505.07 SilentFlo pump
MML 642 MTS810 102749 N/A Gaithersburg 223 B239 661-205-04
100kN Fatigue
Load Cell Load Cell
MML 642 MTS810 10390434B N/A Gaithersburg 223 B239 609.25A-01 Alignment Fixture Miscellaneous
MML 642 Tension Compression 556 526234 Gaithersburg 231 B141 810
MML 642 Tension Compression N/A 615872 Gaithersburg 231 B141 FlexTestGT
MML 642 Tension Compression 409 N/A Gaithersburg 231 B141 204.71
250kN Hydraulic
Actuator Actuator
MML 642 Tension Compression 20120096 N/A Gaithersburg 231 B141 647.10A 100kN Hydraulic Grips Grip
MML 642 Tension Compression 481752 N/A Gaithersburg 231 B141 661-21E-01 100kN Load Cell Load Cell
MML 642 Tension Compression 498 N/A Gaithersburg 231 B141 661-23A-01 250kN Load Cell Load Cell
MML 642 Tension Compression 1039087413 N/A Gaithersburg 231 B141 609.25A-01
Alignment
Fixture Miscellaneous
MML 642 Cruciform N/A N/A Gaithersburg 231 B141 N/A
500kN hydraulic grips Grip
MML 642 Cruciform N/A N/A Gaithersburg 231 B141 N/A
500kN hydraulic grips Grip
MML 642 Cruciform N/A N/A Gaithersburg 231 B141 685.60
Hydraulic grip supply Grip
MML 642 Cruciform N/A N/A Gaithersburg 231 B141 685.60
Hydraulic grip supply Grip
MML 642 Cruciform 10323654A N/A Gaithersburg 231 B141 110kip Actuator Y2 Actuator
MML 642 Cruciform 10323654B N/A Gaithersburg 231 B141 110kip Actuator X2 Actuator
MML 642 Cruciform 10323654C N/A Gaithersburg 231 B141 110kip Actuator X1 Actuator
MML 642 Cruciform 10323654D N/A Gaithersburg 231 B141 110kip Actuator Y1 Actuator
MML 642 Cruciform 10338595 N/A Gaithersburg 231 B141 505.30-G2 SilentFlo pump
MML 642 Cruciform 368432B N/A Gaithersburg 233 B141
1240DRA-
900KN-B
360kN Interface
MML 642 Cruciform 368433B N/A Gaithersburg 233 B141
900KN-B
MML 642 Cruciform 368434B N/A Gaithersburg 233 B141
900KN-B
MML 642 Cruciform 368435B N/A Gaithersburg 233 B141
1240DRA-
900KN-B
MML 642 Cruciform 1033265413 N100931 Gaithersburg 231 B141 N/A Cruciform Machine Test Frame
MML 642 Cruciform 20A0441RB N100935 Gaithersburg 233 B141 N/A
Computer control interface Miscellaneous
MML 642 Cruciform N/A N100936 Gaithersburg 233 B141 N/A FlexTest 60
MML 642 Poly1 0224441 N/A Gaithersburg N/A N/A 318.25 Actuator 250kN Actuator
MML 642 Poly1 N/A N/A Gaithersburg N/A N/A FlexTest SE
MML 642 Poly1 0220545 N/A Gaithersburg N/A N/A 661-22C-01 Load Cell Load Cell
MML 642 Poly1 0226090 N/A Gaithersburg N/A N/A Servohydraulic Load Frame Test Frame
MTS EQUIPMENT
MML 642 Poly2 10174300A N/A Gaithersburg N/A N/A 318.10 Actuator 100kN Actuator
MML 642 Poly2 N/A N/A Gaithersburg N/A N/A
FlexTest SE
MML 642 Poly2 160414 N/A Gaithersburg N/A N/A 661-22E-03 Load Cell Load Cell
MML 642 Poly2 10180744 N/A Gaithersburg N/A N/A
Servohydraulic
Load Frame Test Frame
MTS EQUIPMENT
MML 642 Poly3 N/A N/A Gaithersburg N/A N/A 661-21A-01 Load Cell Load Cell
MML 642 Poly3 10174300 N/A Gaithersburg N/A N/A 318.10
MML 642 Poly4 782 N/A Gaithersburg N/A N/A 312.21
MML 642 High-rate N/A N/A Gaithersburg 231 B141 N/A
FlexTest 60
MML 642 High-rate N/A N/A Gaithersburg 231 B141 NA
Manifold Miscellaneous
MML 642 Poly4 231 N/A Gaithersburg N/A N/A 204-51 Load Cell Load Cell
MML 642 Tension Compression N/A N/A Gaithersburg 231 B141 N/a
Manifold Miscellaneous
MML 647 20kip-Hydrogen 258 909511 Boulder 12 1 312.31
Inverted actuator for high pressure hydrogen chamber Test Frame
MML 647 20kip-Hydrogen
Custom Shepic
Cell N/A Boulder 12 1 Load Cell Load Cell
MML 647 20kip-Hydrogen 1261 N/A Boulder 12 1 Load Cell Load Cell
MML 647 Pump1 246 N/A Boulder 12 1 801.B 810.10B 10 Gpm Pump Hydraulic Power Unit
810.10B IS THE
CORRECT MODEL #
MML 647 20kip-Hydrogen 312.31 909511 Boulder 12 1
Inverted actuator for high pressure hydrogen Test Frame
THIS IS MTS
EQUIPMENT
chamber
MML 647 20kip-Hydrogen N/A N/A Boulder 12 1 FT-40 on 801.B Controller
MML 647 20kip-Hydrogen N/A N/A Boulder 12 1 Load Cell Load Cell
MML 647 55kip-Hydrogen N/A N/A Boulder 12 1 N/A FT-40 on 801.B Controller
MML 647 Pump1 N/A Boulder 8 801.B 10 Gpm Pump
MML 647 55kip-Hydrogen
Custom Shepic
Cell N/A Boulder 12 1 N/A Load Cell Load Cell
MML 647 55kip-Hydrogen 10313533 N/A Boulder 12 1 N/A for high pressure
MML 647 55kip-Hydrogen 10310538C N/A Boulder 12 1 N/A Load Cell Load Cell
MML 647 55kip-Hydrogen N/A N/A Boulder 12 1 N/A Load Cell Load Cell
MML 647 55kip-Hydrogen N/A N/A Boulder 12 1 N/A
Inverted actuator for high pressure
MML
642 High-rate 10320415 N/A Gaithersburg 231 B141 293-12A-01
Hydraulic Service
Manifold
Hydraulic
MML
642 Cruciform 10332701 N/A Gaithersburg 231 B141 293 12A-22 HSM
Hydraulic
MML 647 110-kip 1140 900356 Boulder 2 1400 Has 3-stage Valve Test Frame
THIS IS AN MTS
FRAME WITH AN
INVERTED
ACTUATOR. HAS
HIGH CAPACITY
ACCUMMULATORS,
HSM AND VALVES
ATTACHED TO THE
ACTUATOR
MML 647 110-kip 1311 N/A Boulder 2 1400 Load Cell Load Cell
MML 647 20kip 850 N/A Boulder 2 1400 Load Cell Load Cell
MML 647 20kip No Data Plate
150 N/A Boulder 2 1400 312
Table Top
MML 647 220kip-4Post-Bot 400 900327 Boulder 2 1400 311
4 post Bottom
Actuator Test Frame
MML 647 220kip-4Post-Bot 248 N/A Boulder 2 1400 Load Cell Load Cell
MML 647 220kip-4post-Top 483 900047 Boulder 2 1400 311
4 post Top
MML 647 220kip-4post-Top 456 N/A Boulder 2 1400 Load Cell Load Cell
MML 647 1000 Kip 37705 N/A Boulder 2 1400 Load Cell Load Cell
MML 647 1000 Kip 934997 Boulder 2 1400 Load Cell Load Cell
MML 647 1000 Kip 1 N/A Boulder 2 1400 900.93
1 million lb capacity Test Frame
THIS IS AN MTS
FRAME
MANUFACTURED
BY MATERIALS
RESEARCH INC.
BEFORE THEY
BECAME MTS.
MML 647 70kip-Instron8502p-1 UK534 N/A Boulder 2 1400 Load Cell Load Cell
MML 647 70kip-Instron8502p-1 CO261 N/A Boulder 2 1400 8502
Instron Frame awaiting FT-60 controller and MTS HSM Test Frame
MML 647 70kip-Instron8502p-2 UK537 N/A Boulder 2 1400 Load Cell Load Cell
MML 647 70kip-Instron8502p-2 CO263 N/A Boulder 2 1400 8502
Instron Frame awaiting FT-60
MML 647 70kip-Instron8502p-3 UK546 N/A Boulder 2 1400 Load Cell Load Cell
MML 647 70kip-Instron8502p-3 CO273 N/A Boulder 2 1400 8502
Instron Frame awaiting FT-60
MML 647 70kipInstron UK541 N/A Boulder 2 1400 Load Cell Load Cell
MML 647 70kipInstron CO258 N/A Boulder 2 1400 8502
Instron Frame retrofitted with MTS HSM and
MTS Controller Test Frame
MML 647 20kipImmersion 233690 921341 Boulder 2 1417 810 with reaction frame for immersion testing Test Frame
MML 647 20kipImmersion 78883 N/A Boulder 2 1417 Load Cell Load Cell
MML 647 3kipMiniBionic 100061241 928411 Boulder 2 1417 858 Mini-Bionic
Mini-Bionic
Table Top Frame Test Frame
MML 647 3kipMiniBionic 41902 N/A Boulder 2 1417 Load Cell Load Cell
MML 647 3kipMiniBionic 124057 N/A Boulder 2 1417 Load Cell Load Cell
MML 647 55kipInverted N/A 908872 Boulder 2 1417 312 Inverted actuator Test Frame
MML 647 55kipInverted 2380 N/A Boulder 2 1417 Load Cell Load Cell
MML 647 55kipInverted-2 909511 Boulder 2 1417 312 Inverted actuator Test Frame
MML 647 55kipInverted-2 2483 N/A Boulder 2 1417 Load Cell Load Cell
MML 647 Pump4 10162358 928935 Boulder 2 1417 505.30-G2 Silent Flo Pump
MML 647 Pump2 1088574 N/A Boulder 2 1400C 505.07
Silent Flo Pump, not connected
MML 647 Pump3 10311039 935031 Boulder 2 1400C 505.180- Silent Flo Pump
MML 647 Pump5 231 N/A Boulder 2 Basement 510.10B 10 Gpm Pump
MML 647 110-kip 1140 900356 Boulder 2 1400
Has 3-stage
Valve Test Frame
MML 647 110-kip N/A N/A Boulder 2 1400 Load Cell Load Cell
MML 647 20kip N/A N/A Boulder 2 1400 312 Load Cell Load Cell
MML 647 20kip N/A N/A Boulder 2 1400 312
MML 647 20kipImmersion 233690 921341 Boulder 2 1417 810 with reaction frame for immersion testing Test Frame
MML 647 20kipImmersion N/A N/A Boulder 2 1417 810 Load Cell Load Cell
MML 647 220kip-4Post-Bot 400 900327 Boulder 2 1400 311 4 post Bottom
MML 647 220kip-4Post-Bot N/A N/A Boulder 2 1400 311 Load Cell Load Cell
MML 647 220kip-4post-Top 483 900047 Boulder 2 1400 311
4 post Top
MML 647 220kip-4post-Top N/A N/A Boulder 2 1400 311 Load Cell Load Cell
MML 647 3kipMiniBionic N/A 928411 Boulder 2 1417 585 Mini-Bionic Mini-Bionic Test Frame
MML 647 3kipMiniBionic N/A N/A Boulder 2 1417 585 Mini-Bionic Load Cell Load Cell
MML 647 55kipInverted N/A 908872 Boulder 2 1417 312 Inverted actuator Test Frame
MML 647 55kipInverted N/A N/A Boulder 2 1417 312 Load Cell Load Cell
MML 647 55kipInverted-2 N/A 909511 Boulder 2 1417 N/A Inverted actuator Test Frame
MML 647 55kipInverted-2 N/A N/A Boulder 2 1417 N/A Load Cell Load Cell
MML 647 5MN N/A N/A Boulder 2 1400 N/A Load Cell Load Cell
MML 647 5MN N/A N/A Boulder 2 1400 N/A
1 millionlb capacity Test Frame
MML 647 70kip-Instron8502p-1 N/A N/A Boulder 2 1400 8502 Load Cell Load Cell
MML 647 70kip-Instron8502p-1 N/A N/A Boulder 2 1400 8502
Instron Frame awaiting FT-60 Test Frame
MTS HSM
MML 647 70kip-Instron8502p-2 N/A N/A Boulder 2 1400 8502 Load Cell Load Cell
MML 647 70kip-Instron8502p-2 N/A Boulder 2 1400 8502
Instron Frame awaiting FT-60
MML 647 70kip-Instron8502p-3 N/A N/A Boulder 2 1400 8502 Load Cell Load Cell
MML 647 70kip-Instron8502p-3 N/A N/A Boulder 2 1400 8502
Instron Frame awaiting FT-60
MML 647 70kipInstron N/A N/A Boulder 2 1400 8502 Load Cell Load Cell
MML 647 70kipInstron N/A Boulder 2 1400 8502
Instron Frame retrofitted with
MTS HSM and
MTS Controller Test Frame
MML 647 Pump2 N/A Boulder 2 1400C 505.07
Silent Flo Pump, not connected
MML 647 Pump3 N/A 935031 Boulder 2 1400C 505.18 Silent Flo Pump
MML 647 Pump4 N/A 928935 Boulder 2 1417 505.30-G2 Silent Flo Pump
MML 647 Pump5 N/A Boulder 2 storage N/A 10 Gpm Pump
File details come from the government source that posted it. Updated .