SB1341-15-RP-0019_-_Solicitation.pdf

PDF 2 MB Posted

Attached to
Building 3 Renovation at NIST in Boulder, CO 80305
Solicitation number
SB1341-15-RP-0019
Issued by

About this file

SB1341-15-RP-0019 - Solicitation

View the file

Other files

File Type Posted
SB1341-15-RP-0019_-_SF30_Amendment_002.pdf PDF
SB1341-15-RP-0019_-_SF30_Amendment_1.pdf PDF
Govt_Pre-proposal_Inquiry_Form.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NO.

5. REQUISITION/PURCHASE REQUEST NO.

CODE

6. PROJECT NO.

8. ADDRESS OFFER TO

4. CONTRACT NO.

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

11. The contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

NSN 7540-01-155-3212

calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

See Attached

STANDARD FORM 1442 (REV. )

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( )

20b. SIGNATURE 20c. OFFER DATE

STANDARD FORM 1442 (REV. ) BACK

SCHEDULE Continued

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

PAGE 3 OF 95 SB1341-15-RP-0019

TAS 130515 FOR FUND CODE 0003

0001 DESIGN-BUILD CONSTRUCTIONS SERVICES FOR

THE RENOVATION OF BUILDING 3 NIST BOULDER.

The Contractor shall provide all labor, supervision, materials, equipment and applicable safety precautions necessary to design and construct Building 3 at NIST in the city of Boulder, Colorado in accordance with the Performance Technical Specifications - Attachment 1 to this solicitation.

SHIP TO:

NATIONAL INST OF STDS AND TECHNOLOGY

325 BROADWAY

BOULDER CO 80305-3328

FOB : Destination

1.00 LS

Table of Contents

PAGE 4 OF 95 SB1341-15-RP-0019

SECTION 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS

00100. 1 Instructions, Conditions & Notices to Offerors

00100. 2 RFP Attch A - Cons_&_Design_Exp_Proj-Data-Sheet

00100. 3 RFP Attch B_NIST AMD Team-E Boulder PPQ Form

00100. 4 RFP Attch C_Resume Form Key Personnel

00100. 5 RFP Attch D_Key Personnel Statement

00100. 6 Wage Determination

00100. 7 52.215-1 I INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)--ALTERNATE I

(OCT 1997)

00100. 8 1352.242-70 POSTAWARD CONFERENCE (APR 2010)

00100. 9 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)

00100. 10 52.215-5 FACSIMILE PROPOSALS (OCT 1997)

00100. 11 52.215-22 LIMITATIONS ON PASS-THROUGH CHARGES -- IDENTIFICATION OF SUBCONTRACT EFFORT

(OCT 2009)

00100. 12 52.216-1 TYPE OF CONTRACT (APR 1984)

00100. 13 52.222-5 Construction Wage Rate Requirements Secondary Site of the Work (May 2014)... 49

00100. 14 52.222-46 EVALUATION OF COMPENSATION FOR PROFESSIONAL EMPLOYEES (FEB 1993)

00100. 15 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS UNDER TRADE

AGREEMENTS (MAY 2014)

00100. 16 52.233-2 SERVICE OF PROTEST (SEP 2006)

00100. 17 52.237-1 SITE VISIT (APR 1984)

00100. 18 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

00100. 19 1352.215-71 INSTRUCTIONS FOR ORAL PRESENTATIONS (APR 2010)

00100. 20 1352.215-72 INQUIRIES (APR 2010)

00100. 21 1352.233-70 AGENCY PROTESTS (APR 2010)

00100. 22 1352.233-71 GAO AND COURT OF FEDERAL CLAIMS PROTESTS (APR 2010)

00100. 23 1352.270-71 PRE-BID / PRE-PROPOSAL CONFERENCE AND SITE VISIT (APR 2010)

SECTION 00600 REPRESENTATIONS AND CERTIFICATIONS

00600. 1 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS (SEP 2007)

00600. 2 52.204-5 WOMEN-OWNED BUSINESS (OTHER THAN SMALL BUSINESS) (OCT 2014)

00600. 3 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013)

00600. 4 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (NOV 2014)

00600. 5 52.204-17 OWNERSHIP OR CONTROL OF OFFEROR. (NOV 2014)

00600. 6 52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS-REPRESENTATION

(DEC 2014)

00600. 7 52.222-38 COMPLIANCE WITH VETERANs` EMPLOYMENT REPORTING REQUIREMENTS (SEP 2010)

00600. 8 52.223-1 BIOBASED PRODUCT CERTIFICATION (MAY 2012)

00600. 9 52.223-4 RECOVERED MATERIAL CERTIFICATION (MAY 2008)

00600. 10 52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR

TRANSACTIONS RELATING TO IRAN--REPRESENTATION AND CERTIFICATIONS (DEC 2012)

00600. 11 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)

00600. 12 52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

00600. 13 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

00600. 14 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (APR 2010)

00600. 15 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)

00600. 16 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014)

00600. 17 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)

00600. 18 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT

OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

PAGE 5 OF 95 SB1341-15-RP-0019

SECTION 00700 CONTRACT CLAUSES

00700. 1 52.202-1 DEFINITIONS (NOV 2013)

00700. 2 52.203-3 GRATUITIES (APR 1984)

00700. 3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

00700. 4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

00700. 5 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

00700. 6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER

ACTIVITY (MAY 2014)

00700. 7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

00700. 8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010). 63

00700. 9 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (APR 2010)

00700. 10 52.203-14 DISPLAY OF HOTLINE POSTER(S) (DEC 2007)

00700. 11 52.203-16 PREVENTING PERSONAL CONFLICTS OF INTEREST (DEC 2011)

00700. 12 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES

OF WHISTLEBLOWER RIGHTS (APR 2014)

00700. 13 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY

2011)

00700. 14 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

00700. 15 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (JULY

2013)

00700. 16 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JULY 2013)

00700. 17 52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (JAN 2014)

00700. 18 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MANAGEMENT (NOV 2014)

00700. 19 52.207-3 RIGHT OF FIRST REFUSAL OF EMPLOYMENT (MAY 20-06)

00700. 20 52.209-6 PROTECTING THE GOVERNMENT` INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS

DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (AUG 2013)

00700. 21 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS

(JULY 2013)

00700. 22 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (DEC 2014).. 64

00700. 23 52.210-1 MARKET RESEARCH (APR 2011)

00700. 24 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)

00700. 25 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)

00700. 26 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA--MODIFICATIONS

(AUG 2011)

00700. 27 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA--MODIFICATIONS (OCT 2010)

00700. 28 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

00700. 29 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED

COST OR PRICING DATA--MODIFICATIONS (OCT 2010)

00700. 30 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014)

00700. 31 52.219-9 II SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2014)--ALTERNATE II (OCT 2001)... 65

00700. 32 52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (JAN 1999)

00700. 33 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (OCT 2014)

00700. 34 52.222-3 CONVICT LABOR (JUN 2003)

00700. 35 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS --OVERTIME COMPENSATION (MAY 2014). 65

00700. 36 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014)

00700. 37 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)

00700. 38 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014)

00700. 39 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)

00700. 40 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

00700. 41 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)

PAGE 6 OF 95 SB1341-15-RP-0019

00700. 42 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)

00700. 43 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS

(MAY 2014)

00700. 44 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

00700. 45 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2104)

00700. 46 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

00700. 47 52.222-26 EQUAL OPPORTUNITY (APR 2015)

00700. 48 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (APR 2015)

00700. 49 52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUL 2014)

00700. 50 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC

2010)

00700. 51 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)

00700. 52 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2012)

00700. 53 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2014)

00700. 54 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION

CONTRACTS (SEP 2013)

00700. 55 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)

00700. 56 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)

00700. 57 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

00700. 58 52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (DEC 2007)

00700. 59 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION

CONTRACTS (MAY 2008)

00700. 60 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG

2011)

00700. 61 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

00700. 62 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)

00700. 63 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (DEC

2007)

00700. 64 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC 2007)

00700. 65 52.227-17 RIGHTS IN DATA--SPECIAL WORKS (DEC 2007)

00700. 66 52.227-23 RIGHTS TO PROPOSAL DATA (TECHNICAL) (JUN 1987)

00700. 67 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)

00700. 68 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

00700. 69 52.228-11 PLEDGES OF ASSETS (JAN 2012)

00700. 70 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (MAY 2014)

00700. 71 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)

00700. 72 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)

00700. 73 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

00700. 74 52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS (JUN 2010)

00700. 75 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)

00700. 76 52.232-11 EXTRAS (APR 1984)

00700. 77 52.232-16 PROGRESS PAYMENTS (APR 2012)

00700. 78 52.232-17 INTEREST (MAY 2014)

00700. 79 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

00700. 80 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014)

00700. 81 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (JUL

2013)

00700. 82 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)

00700. 83 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013). 68

00700. 84 52.233-1 DISPUTES (MAY 2014)

00700. 85 52.233-3 PROTEST AFTER AWARD (AUG 1996)

PAGE 7 OF 95 SB1341-15-RP-0019

00700. 86 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

00700. 87 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

00700. 88 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

00700. 89 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)

00700. 90 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)

00700. 91 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

00700. 92 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

00700. 93 52.236-8 OTHER CONTRACTS (APR 1984)

00700. 94 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (APR 1984)

00700. 95 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)

00700. 96 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

00700. 97 52.236-12 CLEANING UP (APR 1984)

00700. 98 52.236-13 ACCIDENT PREVENTION (NOV 1991)

00700. 99 52.236-13 I ACCIDENT PREVENTION (NOV 1991)--ALTERNATE I (NOV 1991)

00700. 100 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)

00700. 101 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

00700. 102 52.236-17 LAYOUT OF WORK (APR 1984)

00700. 103 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)

00700. 104 52.236-21 I SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)--ALTERNATE I (APR

1984)

00700. 105 52.236-22 DESIGN WITHIN FUNDING LIMITATIONS (APR 1984)

00700. 106 52.236-24 WORK OVERSIGHT IN ARCHITECT-ENGINEER CONTRACTS (APR 1984)

00700. 107 52.236-25 REQUIREMENTS FOR REGISTRATION OF DESIGNERS (JUN 2003)

00700. 108 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

00700. 109 52.242-2 PRODUCTION PROGRESS REPORTS (APR 1991)

00700. 110 52.242-3 PENALTIES FOR UNALLOWABLE COSTS (MAY 2014)

00700. 111 52.242-13 BANKRUPTCY (JUL 1995)

00700. 112 52.242-14 SUSPENSION OF WORK (APR 1984)

00700. 113 52.242-15 STOP-WORK ORDER (AUG 1989)

00700. 114 52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

00700. 115 52.243-1 III CHANGES--FIXED-PRICE (AUG 1987)--ALTERNATE III (APR 1984)

00700. 116 52.243-4 CHANGES (JUN 2007)

00700. 117 52.243-7 NOTIFICATION OF CHANGES (APR 1984)

00700. 118 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (APR 2015)

00700. 119 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

00700. 120 52.246-13 INSPECTION--DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS (AUG

1996)

00700. 121 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)

00700. 122 52.248-3 VALUE ENGINEERING--CONSTRUCTION (OCT 2010)

00700. 123 52.249-2 I TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012)--

ALTERNATE I (SEP 1996)

00700. 124 52.249-3 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (DISMANTLING, DEMOLITION, OR

REMOVAL OF IMPROVEMENTS) (APR 2012)

00700. 125 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)

00700. 126 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

00700. 127 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)

00700. 128 1352.246-70 PLACE OF ACCEPTANCE (APR 2010)

00700. 129 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

00700. 130 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

00700. 131 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. [JUL 2014]

PAGE 8 OF 95 SB1341-15-RP-0019

00700. 132 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)

00700. 133 52.223-7 NOTICE OF RADIOACTIVE MATERIALS (JAN 1997)

00700. 134 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS

(MAY 2008)

00700. 135 52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)

00700. 136 52.248-2 VALUE ENGINEERING--ARCHITECT-ENGINEER (MAR 1990)

00700. 137 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

00700. 138 52.252-4 ALTERATIONS IN CONTRACT (APR 1984)

00700. 139 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

00700. 140 1352.201-72 CONTRACTING OFFICER?s REPRESENTATIVE (C0R) (APR 2010)

00700. 141 1352.237-74 PROGRESS REPORTS (APR 2010)

00700. 142 52.232-99 DEV PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS CONTRACTORS (AUG 2012). 78

00700. 143 NIST LOCAL-04 BILLING INSTRUCTIONS

SECTION 00800 SPECIAL CONTRACT REQUIREMENTS

00800. 1 Federal Holidays 2015-2017

00800. 2 Special Clauses

00800. 3 1352.208-70 RESTRICTIONS ON PRINTING AND DUPLICATING (APR 2010)

00800. 4 1352.209-72 RESTRICTIONS AGAINST DISCLOSURE (APR 2010)

00800. 5 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)

00800. 6 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)

00800. 7 1352.228-72 DEDUCTIBLES UNDER REQUIRED INSURANCE COVERAGE- FIXED PRICE (APR 2010)

00800. 8 1352.227-70 RIGHTS IN DATA, ASSIGNMENT OF COPYRIGHT (APR 2010)

00800. 9 1352.228-70 INSURANCE COVERAGE (APR 2010)

00800. 10 1352.237-75 KEY PERSONNEL (APR 2010)

PAGE 9 OF 95 SB1341-15-RP-0019

SECTION 00100

INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS

00100. 1 Instructions, Conditions & Notices to Offerors

Contents

1. GENERAL OVERVIEW

2. DESCRIPTION OF THE PROJECT

3. GENERAL PROCEDURES/REQUIREMENTS

4. INTRODUCTION - NOTICE TO OFFERORS

4.1. Acquisition Method Overview

4.2. Relationship

4.3. Contract Cost Ceiling Limitation for Design and Construction Costs

4.4. Solicitation process

5. PREPARING PROPOSALS

5.1. Who May Submit

5.2. Where to Submit

5.3. Submission Deadline

5.4. Pre-Submission Inquiries and Questions

5.5. Submission Format

5.6. Written Submission

5.7. Soft Copy Submission with Proposal

5.8. Confidential Information

5.9. Limitations in Contracting

6. SOURCE SELECTION PROCEDURES

7. PHASE I - REQUEST FOR QUALIFICATIONS (RFQ)

8. PHASE I – REQUEST FOR QUALIFICATIONS (RFQ) SUBMITTAL INSTRUCTIONS

AND EVALUATION FACTORS FOR AWARD

8.1. Evaluation Criteria: Phase I – Request for Qualifications (RFQ)

9. PHASE II - RFP SUBMITTAL INSTRUCTIONS AND EVALUATION FACTORS FOR

AWARD

9.1. Phase II - Request for Proposals (RFP)

9.2. Non-Price Factors

9.3. Stipend

9.4. Basis of Award

9.5. Phase II Proposal, Evaluation Factors and Submittals

9.6. Phase II Evaluation Procedures

PAGE 10 OF 95 SB1341-15-RP-0019

1. GENERAL OVERVIEW

This solicitation is issued as a Two-Phase Design-Build procurement in accordance with Federal Acquisition Regulation (FAR) 36.3. Phase I is a Request for Qualifications (RFQ).

Proposals will be evaluated in Phase I to determine which offerors will submit proposals for Phase II. A maximum number of three (3) offerors will proceed to Phase II. Phase II is a Request for Proposal (RFP). Phase II RFP will be issued to only those successful offerors determined to be the most highly qualified from Phase I. One firm-fixed-priced (FFP) contract will be awarded using competitive negotiation.

This solicitation is for the RFQ phase (Phase I) of the design-build (DB) renovation project of Building 3 at the National Institute of Standards and Technology (NIST) located in Boulder, Colorado.

2. DESCRIPTION OF THE PROJECT

NIST is currently making significant improvements to its 64 year old Boulder campus. NIST seeks to convert Building 3, built in 1951 and consisting of approximately 18,000 square feet, to new office, laboratory and supporting spaces for approximately 105 scientists and staff.

The project may include full demolition of Building 3, or partial demolition with limited renovation, and new construction as needed to meet the program requirements. The project will also require site improvements to landscaping, sidewalks and parking.

The newly renovated Building 3 will serve as the headquarters of the Communications Technology Laboratory (CTL), a newly formed Organizational Unit (OU). The planned size of the re-purposed Building 3 is approximately 25,000 usable square feet (usf), corresponding to 41,000-43,000 gross square feet (gsf). When re-purposed, Building 3 will house laboratories and offices for the CTL. The proposed laboratories are dry labs, accommodating computer stations, servers and desk-top equipment. Office space will be developed in a flexible open office arrangement, including meeting rooms, employee amenities, and building service spaces for functional and code requirements. The building will also be used for occasional workshops. The completed project is expected to provide comfortable and functional interior spaces and supporting spaces, improve energy efficiency and sustainability, and result in an architecturally superior facility that will enhance the appearance of the NIST campus.

For informational purposes only: The Colorado State Historic Preservation Office (SHPO) is currently reviewing the project design concept and has not yet finalized its review.

3. GENERAL PROCEDURES/REQUIREMENTS

PRELIMINARY REVIEW

Proposals shall describe the capability of the offeror to perform the requirements of the Solicitation. Proposals should be specific and complete in every detail. Proposals should be

PAGE 11 OF 95 SB1341-15-RP-0019

prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the requirements. Proposals should include page numbers, be practical, legible, clear, and coherent. In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failure to submit and organize proposals as requested may adversely affect an Offeror's evaluation.

4. INTRODUCTION - NOTICE TO OFFERORS

This section is designed to provide the offeror with instructions to complete and deliver a complete competitive proposal in response to this RFP. The selection procedures to be used will be a two-phase approached in accordance with FAR Subpart 36.3. The two-phase selection procedure authorized under 41 U.S.C. 3309 allows offerors to submit information related to specialized experience, technical competence, capability to perform, past performance, teaming arrangements and/or other information requested in phase one. Based on information submitted in phase one, the Government will select no more than three (3) of the most highly qualified offerors to advance onto Phase II in the competition and are subsequently invited to submit complete technical and price proposals. All proposals must be complete and timely to be considered.

4.1. Acquisition Method Overview

The method of acquisition for this procurement considers the “Best Value” continuum, wherein a Best Value source selection process will be utilized in accordance with the FAR 15.101. Award will be made to the proposal that represents the best value to the Government as determined by the Government using the tradeoff process. This process permits the tradeoffs among cost/price and non-cost factors and allows the Government to accept other than the lowest priced proposal or the highest technically rated offer.

The evaluation and tradeoff process are subjective in nature. The offer determined to be the Best Value may not be the lowest price or the highest technically rated offer. The decision will involve a comparison and trade-off analysis of the combination of non-price strengths, weaknesses, and risks; the evaluated cost/price offered in each proposal, and judgment as to which proposal provides the best combination. As a result offerors must provide their best proposal with all required information in the required format.

Information provided must be complete, clear and legible to obtain the best evaluation rating possible.

Award of one Firm Fix Price (FFP) DB construction contract requiring delivery and installation is contemplated for this acquisition.

4.2. Relationship

The degree of success of this project will depend largely upon the nature of the relationship between the Contractor and the Government. The Government’s intent is to work with the Contractor as an integrated team with common goals of improving

PAGE 12 OF 95 SB1341-15-RP-0019

quality, improving productivity, achieving cost savings, and achieving other economies and efficiencies across the full spectrum of performance. To the greatest degree possible, the Government intends to adopt commercial practices to accomplish these goals. The Government will provide the Contractor maximum flexibility to determine specific work methods that satisfy the requirements in the contract. The Government expects the Contractor to take customer preferences into consideration, participate with the Government in continuous improvement activities (such as optimizing the phasing of the effort), and proactively address risks and challenges to project success. The Government also intends to work with the Contractor to devise and implement processes that are appropriate for this DB project, that maximize efficiency, and provide the Government insight into project progress without an undue level of Government oversight.

4.3. Contract Cost Ceiling Limitation for Design and Construction Costs

4.3.1. The design and construction costs will be subject to the funds available for this project. The maximum award price amount (current maximum funds budgeted) for design and construction is $17,559,234. The Government will not consider award to an offeror based on a price proposal which exceeds the target award amount of $17,559,234.

4.3.2. Offerors are under no obligation to propose/meet the maximum price amount of

$17,559,234. This is a best value source selection utilizing price and non-price tradeoffs.

4.3.3. Award of a contract is subject to the availability of funding. Funding is currently not available for this project; however, funding is budgeted for the project and is expected to be available for the time of award.

4.4. Solicitation process

4.4.1. The solicitation process is known as the “Request for Proposals” (RFP).

Interested firms (referred to as “offerors”) may submit certain specified performance capability proposals, demonstrating their capability to successfully execute the contract resulting from this solicitation. The Government will evaluate the performance capability proposals in accordance with the criteria described herein.

The Government will evaluate the proposals, in accordance with the criteria described in the solicitation (Evaluation Factors for Award), and award a FFP DB construction contract to the responsible offeror whose proposal conforms with all the terms and conditions of the solicitation, and whose proposal is determined to represent the overall best value to the Government considering all factors and price.

The proposal must describe the capability of the Offeror to perform the work, PAGE 13 OF 95 SB1341-15-RP-0019 describe the Offeror’s understanding of the requirements contained in the solicitation and set forth full, accurate, and complete information as required by the RFP.

4.4.2. Oral Presentations:

Phase II of the RFP process requires each offeror to conduct an oral presentation.

The Government anticipates conducting oral presentations at the National Institute of Standards and Technology (NIST) Boulder Campus, 325 Broadway, Boulder, CO 80305.

4.4.3. Offerors will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this RFP does not constitute an award commitment on the part of the Government.

5. PREPARING PROPOSALS

The following section describes the procedures for preparing proposals in response to this RFP. A pre-solicitation announcement (SB1341-15-RP-0019) was posted to FedBizOpps (FBO) on April 16, 2015.

5.1. Who May Submit

The acquisition method shall be acquired using full and open competition procedures.

All qualified offerors may submit qualifications for Phase I. The NAICS for this project is 236220, with a size standard of $36.5 Million, as determined by the U.S. Small Business Administration.

5.2. Where to Submit

Offerors shall submit proposals to:

National Institute of Standards & Technology Acquisition Management Division, Team E ATTN: MeeLondrell Parks 325 Broadway Building 111 Boulder, CO 80305

The Packaging that contains the Proposals shall be marked on the outside with the solicitation number SB1341-15-RP-0019 and project title BUILDING 3

RENOVATION AT NIST IN BOULDER, CO.

5.3. Submission Deadline

Phase I qualifications shall be received by the Government at the location in paragraph

5.2 above so as to reach the Government office designated no later than Tuesday, June 30, 2015 at 9:00 AM Mountain Time. All information requested in Paragraph 6 below

PAGE 14 OF 95 SB1341-15-RP-0019

(Evaluation Factors for Award) and any provisions contained herein must be submitted in response to this solicitation in order for the Offeror to be considered. Late submissions will not be accepted. All submitted materials will become the property of the Government and will not be returned.

Regardless of the manner the offeror chooses to deliver the RFP; it is the offeror’s responsibility to make sure it is received before the submission deadline.

There will be no public opening of the proposals. Hand-carried proposals to the Acquisition Management Division office and facsimile proposals are not authorized.

Offers sent by commercial package delivery and hand delivery shall be deemed received as of the date and time of delivery to the office designated for receipt of offers.

Offers sent by United States Mail shall be deemed timely if delivered to the address of the office designated for receipt of offers on or before the date and time established for receipt of offers.

5.4. Pre-Submission Inquiries and Questions

Submit inquiries, questions, comments requests for information or clarifications electronically to Meelondrell.parks@nist.gov and matthew.gomer@nist.gov. All requests for information or clarification must be submitted by 9:00 AM MT on June 16, 2015. Unless the question deals with issues of a proprietary nature, responses to questions or comments will be posted via amendment to this solicitation announcement #SB1341-15-RP-0019 at www.fbo.gov. No hard copy, electronic copy, facsimile, or telephonic replies will be issued.

5.5. Submission Format

Proposals shall conform to the instructions in this section; significant deviation may result in the possible exclusion of such proposals from further consideration.

5.6. Written Submission

5.6.1. General

All original proposal materials shall be submitted in accordance with requirements in the section. The proposal shall be presented in the order detailed in this section and as required elsewhere in the solicitation. The proposal and its page limitations to this solicitation shall be submitted in two-, four-, or six-part folder, classification folder, or equivalent via hard-copy and on one CD- ROM/DVD/DVR with four separate files to represent table of contents and tabbed section dividers. A two-, four-, or six-part folder, classification folder, or equivalent is usually comprise of pressboard stock with bonded fasteners on front and back covers and double sided prong fastener on each inner partition. These

PAGE 15 OF 95 SB1341-15-RP-0019

folders have various inch capacities and have in-place/bound fasteners, which are different than bound proposals.

These are examples of “bound proposals” that requires a binding spine that uses a binding machine to manually punch holes and bound a number of sheets together with a binding spine. Bound proposals will not be accepted.

The section should parallel the submission requirements identified below for Phase I qualifications and Phase II proposals. Each in two-, four-, or six-part folder, classification folder, or equivalent furnished shall contain the following information on its cover: solicitation number, solicitation Phase (I or II), Definition. Data Universal Numbering System (DUNS) number, name, address, and telephone numbers of the Prime and Subcontractors, Joint Venture (JV), or other entity identified on the cover as appropriate. Proposal clarity and material organization is mandatory. No material (e.g. samples) shall be incorporated by reference. The information will be used by the Government to evaluate each proposal. Proposals should provide more than superficial coverage of the information required by the evaluation factors identified herein. Additionally, should the proposal include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the proposal may be determined ineligible for award.

The Government shall not be liable for any costs incurred by the offeror submitting an offer in response to this Solicitation.

5.6.2. Number of Copies

Offerors shall submit an “Original” and six (6) copies and one (1) soft copy on a CD-ROM/DVD/DVR in Microsoft Word or PDF format of their proposal (Phases I and II) as described herein.

PAGE 16 OF 95 SB1341-15-RP-0019

5.6.3. Text

Text shall be at least single spaced, on 8 1/2 x 11 inch paper, with a minimum one-inch margin all around. Pages shall be numbered consecutively. A page printed on both sides shall be counted as two (2) pages. Submission as double-sided printing/copying on recycled paper is encouraged. No foldout pages shall be used. Pages submitted in excess of the page limitations stated throughout this document will not be evaluated.

5.6.4. Font Size

Print shall be of a minimum 11-point font size or a maximum 11 characters per inch (11-pitch, pica) spacing. Bolding, underlining, and italics may be used to identify topic demarcations or points of emphasis. Graphic presentations, including tables, while not subject to the same font size and spacing requirements, shall have spacing and text that is easily readable.

5.7. Soft Copy Submission with Proposal

In addition to the hard copies, in physical form, as identified above, the offeror shall submit all proposal information in soft/electronic copy format on CD-ROM/DVD/DVR in Microsoft Word or PDF format. The soft/electronic copy version shall be either a single file tabbed in the same order as the hard copy or multiple files hyperlinked to a single table of contents. All elements of the proposal shall be available in soft copy format, i.e. cut sheets, if applicable, should be scanned in PDF format, thus making it available in electronic form. In addition, the price proposal in Phase II shall be an “Editable” electronic file on an Excel spreadsheet or equivalent with working formulas.

The CD-ROM/DVD/DVR must be clearly labeled by solicitation number and offeror’s name and DUNS. In the event of any conflict between the soft copy and the hard copy, the hard copy submission shall take precedence and will be the material upon which the Government bases its evaluation and ultimately its decision.

5.8. Confidential Information

The Freedom of Information Act (FOIA) and its amendments have resulted in an increasing number of requests from outside the Government for copies of contractor qualifications and proposals submitted to Federal agencies. If an offeror’s submissions contain information that they believe should be withheld from such requestors under FOIA on the grounds that they contain “trade secrets and commercial or financial information” [5 USC§552(b)(4)], the offeror should mark its submissions in the following manner:

• The following notice should be placed on the title page: “Some parts of this document, as identified on individual pages, are considered by the submitter to be privileged or confidential trade secrets or commercial or financial information not subject to mandatory disclosure under the Freedom of Information Act. Material

PAGE 17 OF 95 SB1341-15-RP-0019

considered privileged or confidential on such grounds is contained on page(s)

• Each individual item considered privileged or confidential under FOIA should be marked with the following notice: “The data or information is considered confidential or privileged, and is not subject to mandatory disclosure under the Freedom of Information Act”.

5.9. Limitations in Contracting

The Architect-Engineering (A-E) design firm that prepared the performance requirements documents is excluded from participation on this project. To prevent a conflict of interest, contractors submitting responses to this RFP are prohibited from teaming, partnering, subcontracting or engaging in any other business relationship regarding the Building 3 Renovation project with the following firm:

Metropolitan Architects and Planners, Inc.

1505 Prince St STE 200 Alexandria, VA 22314-2874 United States

DUNS: 944258086

CAGE Code: 1FER5

6. SOURCE SELECTION PROCEDURES

The acquisition will utilize a two-phased DB selection process in accordance with (IAW) FAR Subpart 36.3. Phase I of the solicitation will be a RFQ in which all potential sources are able to submit proposals demonstrating their qualifications including past performance, technical competence and overall capability.

Phase I involves all non-price factors. Factor 1 is rated as Pass / Fail. All other non-price factors are considered of equal importance. Following evaluation of Phase I proposals, the Government will select up to three of the most highly qualified contractors to participate in Phase II of the source selection process.

Phase II of the solicitation will involve a RFP which will require the submission of both a price proposal and a technical proposal each of the Phase II offerors. The technical proposal requirements involve a complete design solution to satisfy the requirements of the RFP. The design solution shall include proposed construction methods, phasing, and timelines.

This procurement will utilize the target award method whereby the RFP will state the maximum dollar amount of $17,559,234 as the maximum award amount.

This action will utilize the procedures of FAR Part 15 – Contracting by Negotiation. The CO will utilize the best value continuum of FAR 15.101. The tradeoff process will be used to IAW FAR 15.101. Source selection procedures will be utilized as set forth in FAR 15.3 to

PAGE 18 OF 95 SB1341-15-RP-0019

select firms using the best value tradeoffs method. The Government may award to other than the lowest priced offeror or other than the highest technically rated offeror based on best value determination, in the best interest of the Government. The tradeoff process applies specifically to Phase II which involves both non-price factors and price.

Phase II will include the evaluation of both price proposals and non-price/technical proposals. Phase II will also include oral presentations by each of the offerors for Factor 1 – Technical Approach. The Government will first evaluate non-price proposals. Following the completion of the evaluation of non-price proposals, the Government will evaluate price proposals. The Government will then combine the results of the technical proposal evaluation and the price evaluation and make a best value award determination.

The Government intends to make an award without discussions; however, reserves the right to establish a competitive range and conduct discussions, if deemed necessary, following the evaluation of initial proposals at either or both of Phase I and Phase II.

7. PHASE I - REQUEST FOR QUALIFICATIONS (RFQ)

Factor 1 - Bonding Capacity (Pass/Fail) Factor 2 - Technical Approach (Composition and Management of Proposed DB Team) Factor 3 – Experience (Construction and Design) Factor 4 - Past Performance (Construction and Design)

Factor 1, Bonding Capacity is rated on a Pass/Fail Criteria. All other factors are of equal importance. A failure in Factor 1 renders the overall Phase I proposal as non-selectable to proceed to Phase II.

8. PHASE I – REQUEST FOR QUALIFICATIONS (RFQ) SUBMITTAL

INSTRUCTIONS AND EVALUATION FACTORS FOR AWARD

Phase I submissions shall consist of a non-price proposal only. DO NOT SUBMIT PHASE II FACTORS WITH PHASE I. All Phase I submittals shall be included in a two-, four-, or six-part folder, classification folder, or equivalent with a tab for each factor.

8.1. Evaluation Criteria: Phase I – Request for Qualifications (RFQ)

8.1.1. Factor 1, Tab A – Bonding Capacity

Proof of Bonding Capacity (Pass/Fail Criterion) – Offerors must demonstrate the ability to achieve a performance bonding capacity at a minimum amount of $17.6 million for the project.

Submittal Requirements

Offerors shall submit a letter from the Offeror’s surety stating the surety’s commitment to bond the Offeror at a minimum of $17.6 million for the project.

PAGE 19 OF 95 SB1341-15-RP-0019

The Offeror shall submit a total of seven (7) copies of the letter. Note: An actual bond is not required.

Basis of Evaluation

The Surety letter will be evaluated to ensure that the offeror has the ability to obtain a minimum bonding value of $17.6 million for the project, if awarded. The proposal will be rated for this factor as a Pass or Fail. Failure to demonstrate the ability to meet the minimum bonding capacity for this project is a deficiency in the proposal which renders the proposal as unawardable.

8.1.2. Factor 2, Tab B – Technical Approach

The composition and management of the firms proposed as the DB team for this contract will be evaluated in this factor.

Submittal Requirements

Provide a narrative describing the proposed primary construction firms and primary design firms for this contract and the rationale for proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR subpart 9.6). The narrative shall also include an organizational chart that clearly identifies the lines of authority between the entities. If the experience of a significant subcontractor is being claimed in Factor 3, the firm must be named in the above narrative and organizational chart.

The technical approach narrative shall be limited to five (5) double-sided pages (or ten (10) single-sided pages) including the organizational chart. The information requested in below is not included in this page limitation.

In addition to the narrative, the Offeror shall submit a signed copy of a joint venture (JV) agreement, partnership agreement, teaming agreement, or letter of commitment for each member of the Offeror’s team identified above (e.g., JV partner, partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.).

Basis of Evaluation

The assessment of the Offeror’s technical approach will be used as a means of subjectively evaluating the capability of the Offeror to successfully meet the requirements of the RFP via the proposed DB team.

PAGE 20 OF 95 SB1341-15-RP-0019

8.1.3. Factor 3, Tab C - Experience

Submittal Requirements: The Offeror shall submit the following information:

Construction Experience:

Submit a maximum of five (5) construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as a Design Build or Design Bid Build project valued at $10 million or more, involving new construction or renovation of a building involving architectural, civil, structural, electrical and mechanical (plumbing, HVAC, fire suppression system) work types. The offeror may submit relevant experience from a subcontractor or other teaming member that they propose to use; however, the offeror must also submit a signed copy of a JV agreement, partnership agreement, teaming agreement, or letter of commitment for the subcontractor or teaming member.

Projects submitted for the Offeror shall be completed within the past seven

(7) years of the date of issuance of this RFP.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole should not be submitted as a project; rather Offerors should submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (RFP Attachment A) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features.

This requirement also applies to Leadership in Energy and Environmental Design (LEED) “Self Certified” or “Sustainable Validated” project (i.e.

those not having U.S. Green Building Council (USGBC) LEED certificate.

PAGE 21 OF 95 SB1341-15-RP-0019

For projects which are registered USGBC Certified, submit a copy of the LEED certificate.

If the Offeror is a JV, relevant project experience should be submitted for projects completed by the JV entity. If the JV does not have shared experience, projects shall be submitted for each JV partner. Offerors who fail to submit experience for all JV partners may be rated lower. Offerors are still limited to a total of five (5) projects combined.

If an Offeror is utilizing experience information of affiliates / subsidiaries / parent / Limited Liability Company (LLC) / Private Limited Company (LTD) member companies (name is not exactly as stated on the SF 1442), the proposal shall clearly demonstrate that the affiliate / subsidiary / parent firm will have meaningful involvement in the performance of the contract.

The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offer must provide a letter of commitment and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract.

Design Experience:

Submit a maximum of five (5) design projects for the design team that best demonstrates design experience on relevant projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as a Design Build or Design Bid Build project valued at $10 million or more, involving new construction or renovation of a building involving architectural, civil, structural, electrical and mechanical (plumbing, HVAC, fire suppression system) work types.

Projects submitted shall be completed within the past seven (7) years of the date of issuance of this RFP. For design-build projects, the design portion of the contract shall have been completed within the past seven

(7) years of the date of issuance of this RFP.

A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole should not be submitted as a project; rather Offerors should submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment A) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate

PAGE 22 OF 95 SB1341-15-RP-0019

construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted…