Attachment 1 through 3.pdf
PDF 1 MB Posted
- Solicitation number
- SB1341-11-RQ-0309-1
About this file
ATTACHMENTS 1-3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachments 4 through 18.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A A
B B
SHEET 1 OF 3
DRAWN
CHECKED
QA
MFG
APPROVED
jpomeroy 6/24/2011
DWG NO
FMI Overviews 110629
TITLE
Ferromagnetic Insulator System Assembly Views
SIZE
B
SCALE
REV
Section 1 - Vacuum Chamber Fabrication
Section 2 - Chamber support and table kit
Section 3 - Sample manipulator, exchange and storage
Section 4- Main chamber pumps
Section 5 - Load Lock Assembly
Section 6 - Vacuum Monitoring, etc.
Section 7 - All other parts (standard catalog items)
General Design Assembly View Rendering
(Assembly view shows all components that comp rise and form the main vacuum chamber system.
Not shown, but to be included, are all support appar atus required to operate the equipment shown, e.g. va cuum gauge controllers, deposition controllers, forepu mps, etc.)
lroark Cross-Out
Overview
SCALE 1 / 10
A A
B B
SHEET 2 OF 3
DRAWN
CHECKED
QA
MFG
APPROVED
jpomeroy 6/24/2011
DWG NO
FMI Overviews 110629
TITLE
Ferromagnetic Insulator System Assembly Views
SIZE
B
SCALE
REV
PARTS LIST
PART NUMBERQTYITEM
Gate Valve 10" CF (E/P)11
Gate Valve - 6" CF (E/P)22
Mag-Transfer Rod 4813
Main Chamber + top flange14
Frame Base 115
6" Cf to 2 3/4" CF Zero-length26
Mount Bolts67
6 CF Glass ViewPort188
8CF Glass ViewPort29
Manip 2110
CF 10 -> CF 8 zero length reducer111
CF8 radius elbow 112
CF 8 Gate Valve113
500 L ion pump on 8 CF114
6CF 6 way cross115
LN2 shroud1 (internal)117
RGA118
CF 10 blank519
2 3/4 CF blank1420
QCM421
E/P Shutter feedthrough 4 in stroke422
CF 275 LN2 Feedthrough223
6 CF blank2124
CF 275 viewport 625
UHV Metal Right Angle Valve226
CF 275 UHV leak valve227
CF 275 UHV Ion Gauge228
CF6 to 3x CF275 cluster129
Millitorr pressure gauge130
CF6 turbo131 4 in Linear push-pull - heavy duty132 Getter or TSP panel133 Sample and Mask Magazine134
3 4
12 13
Additional: For items like gauges and pumps - all components to make them operate should be included, e.g., controllers, power supplies, cables. QCM should have controller not monitor. Entire package (once assembled by customer) should be ready for vacuum and comprise a complete vacuum system.
NOT SHOWN TO BE INCLUDED:
-Backing Pump System for Pfeiffer TMU-1000M turbo - ~18 cfm dry pump + bellows connections, foreline shutoff (E/P type) and foreline gauging -Backing pump system (same as previous) for Load Lock turbo - 100 lpm class dry pump -Transfer Arm, Manipulator ad Load lock magazine must all be mutually compatible. A dozen sample/mask "cassettes" (transfer platters) should ultimately be included.
A A
B B
SHEET 3 OF 3
DRAWN
CHECKED
QA
MFG
APPROVED
jpomeroy 6/24/2011
DWG NO
FMI Overviews 110629
TITLE
Ferromagnetic Insulator System Assembly Views
SIZE
B
SCALE
REV
72.64
36.64
112.00
62.00
28.00
5.68
52.0050.0 52.00
Ion pump support
Support for Pfeiffer TMU-1000MPC (connected to CF10 gate valve)
Support for main magnetic transfer arm
Load Lock support
Main Chamber supports
Dimensions and notations are for Section 2 reference only.
These dimensions are not specifications but to proivde information for bidder reference.
File details come from the government source that posted it. Updated .