FLOWMETER, CALIBRATION, AND SIGNAL CONDITIONERS NEEDED FOR PANEL MODIFICATION FOR ESR
Solicitation number
80NSSC26946800Q
Issued by

About this file

This is a Statement of Work (SOW) for procuring flowmeter equipment and signal conditioning devices to support two NASA projects at Kennedy Space Center facilities.

The SOW specifies the requirement to order 6 turbine flowmeters (OEM Part # FT-08AER1-GEA-1) and 6 signal conditioners (OEM Part # TWA-A-9-00-IS). The flowmeters are 1/2" turbine units with a maximum capacity of 10 ACFM and 300-degree Fahrenheit rating, featuring 316 stainless steel housings with 430F stainless steel rotors and 440C stainless steel ball bearings. Each unit includes a modulated carrier pickoff with MS connector for air service application. The flowmeters require CEESI calibration in air at 293 PSIA across 10 points ranging from 31 to 206 SCFM, with standard conditions of 14.7 PSIA and 60 degrees Fahrenheit, per KSC Drawing 79K03436 and calibration specification 90-88669-610. The signal conditioners are two-wire 4-20mA flowmeter transmitters with FTI RF pickoff input in explosion-proof enclosures (Class 1, Division 1 & 2, Groups A, B, C & D) and FM intrinsically safe certification. Both items are classified as EAR99 under ECCN/ITAR regulations. Work will be performed at the Vehicle Assembly Building, Mobile Launcher, and Multi-payload Processing Facility. The objectives include re-establishing Orion scrubber purge capability using existing ML2 BAIR hardware (GP00688) and integrating redundant flowmeters into the Cabin Air Supply Panel for direct SCFM measurement and real-time firing room data transmission (GP00694).

View the file

Other files

File Type Posted
SATPC0043014 Tab 10 Open Market RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements Parts need to be ordered to fulfill the following:

GP00688 will re-establish the Orion scrubber purge capability at MPPF using existing ML2 BAIR hardware.

GP00694 integrating two redundant flowmeters into the Cabin Air Supply Panel to enable direct SCFM measurement and provide real-time data to the firing room.

2. Characteristics, Scope, and Specs

Quantity OEM Part # Product Description

FT-08AER1-

GEA-1

TURBINE FLOW METER

FT-08 = 1/2" TURBINE FLOWMETER, 10 ACFM MAX,

300 DEG F

AE = AN (OR MS) EXTERNAL STRAIGHT THREADS,

37 DEG FLARE

R1 = 1 PRESSURE, REYNOLDS NUMBER

CALIBRATION IN AIR

G = GAS SERVICE

E = 316 SS HOUSING / 430F SS ROTOR

A = 440C SS BALL BEARINGS

-1 = MODULATED CARRIER PICKOFF, MS

CONNECTOR

MEDIA: AIR

SEE "LATEST REV" 79K03436 KSC DRAWING

6 90-88669-610

FOR FLOWMETERS

CALIBRATION: 90-88669-610 REYNOLDS 1 GAS 2-8

TO 16 BB

ECCN/ITAR: ECCN: EAR99

CEESI CALIBRATION

CALIBRATION WILL BE IN “AIR” @ 293 PSIA

10 POINTS 31 - 206 SCFM @ 293 PSIA

STD CONDITIONS: 14.7 PSIA & 60° F

6 TWA-A-9-00-IS

SIGNAL CONDITIONER

ECCN/ITAR: ECCN: EAR99

TWA = TWO WIRE 4-20MA FLOWMETER

TRANSMITTER

C = FTI RF PICKOFF INPUT

9 = ENCLOSURE, EXPLOSION PROOF: CLASS 1, DIV.

1 & 2, GP. A, B, C & D

IS = FM INTRINSICALLY SAFE

3. Place of Performance Work will be performed at the Vehicle Assembly Building (VAB) on the Mobile Launcher (ML), and Multi-payload Processing Facility (MPPF)

4. Period of Performance Nonapplicable