SATPC0042910 Tab 10 3 SOW.pdf

PDF 81 KB Posted

Attached to
Universal Robotics UR30 Robot Workstation and Console
Solicitation number
80NSSC27945558Q
Issued by

About this file

This is a Statement of Work outlining the requirements for the procurement and assembly of a collaborative robotic workstation at Marshall Space Flight Center (MSFC).

The procurement includes hardware components from multiple vendors: a Universal Robots UR30 PolyScope 5 cobot system with various Robotiq attachments (2F-85 Gripper Kit, Hand-E C10 Gripper Kit, Screwdriving Solution, and Wrist Camera Kit); an APT Manufacturing CB600 Cobot Mobile Base Kit; an Advantech TPC-B520 built-to-order PC; an Antaira Technologies 10-port POE Ethernet Switch; Saginaw Control and Engineering console, pedestal, and base components; a Universal Robots cable extension cord; electrical components; and extensive Schunk Intec pneumatic and structural components including signal modules, cables, storage units, adapter plates, and profile angles. Services required include five days of applications engineering scheduled field work, five days of travel and per diem expenses, and 20 hours of shop time for workstation assembly. The place of performance is Marshall Space Flight Center (MSFC), with a performance period of 30 days after receipt of order (ARO).

View the file

Other files

File Type Posted
SATPC0042910 Tab 10 2 BNJ_Redacted.pdf PDF
SATPC0042910 Tab 10 1 RFQ Open Market.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

The information listed below is required to complete this purchase.

2. Characteristics, Scope, and Specs

PART NO. DESCRIPTION QTY.

1100143996 200931 UR30 PolyScope 5 3PE TP w 6m cbl UL 1740 UNIVERSAL ROBOTS USA, INC.

1 EA

1100053302 AGC-

ES-UR-KIT-85

Robotiq 2F-85 Gripper Kit ROBOTIQ INC. 1 EA

1100086607 HND-

C10-ES-UR-KIT

HAND-E C10 GRIPPER KIT FOR UR e-SERIES ROBOTIQ INC. 1 EA

1100112848 SOL-

SDS-ES-D1F3-T

Robotiq Screwdriving Solution for e-Seri ROBOTIQ INC. 1 EA

1100114346 RWC5-

UR-KIT

Wrist Camera Kit for UR ROBOTIQ INC. 1 EA

1100045238 RB-

MCA-CB600-

30KIT-IMP-UR

CB600 Cobot Mobile Base Kit APT MANUFACTURING 1 EA

1100126428 TPC-

B520-BTO

Advantech TPC-B520 Built to Order PC ADVANTECH CORPORATION 1 EA

1100095763 LNP-

1002G-SFP-24

10-port POE Ethernet Switch,Unmanaged,12 ANTAIRA TECHNOLOGIES, LLC

1 EA

AE-FLDSVC-

SCHED

Applications Engineering Scheduled Field 5 d

FS-LDG-MLS Travel, Expenses, Per Diem 5 day ENG-SVC Shop Time for Workstation Assembly 20 hours

1100004249 SCE-

20C30ELJ

Consolet, ELJ; 20H X 30W X 13.09D SAGINAW CONTROL AND

ENGINEERING

1 EA

1100456161 SCE-

PE22

Pedestal SAGINAW CONTROL AND ENGINEERING 1 EA

1100456162 SCE-

24PEBASE

Base for Pedestal SAGINAW CONTROL AND ENGINEERING 1 EA

1100144112 201023 Cable Extension Cord Robot to CB 2m UNIVERSAL ROBOTS USA, INC. 1 EA 1100526749 Electrical components for workstation 1 EA 1100415009

1613282 Master (CPS 040-K-S) SCHUNK INTEC INC. 1 EA

1100415011 1590979

Tool Side (CPS 040-A) SCHUNK INTEC INC. 4 EA

1100531094 1586438

COS R12-K Signal Module SCHUNK INTEC INC. 1 EA

1100531095 1324328

K12 Module Cable, m12, 12pin, 5m SCHUNK INTEC INC. 1 EA

1100531096 1586432

COS R12-A Signal Module SCHUNK INTEC INC. 4 EA

1100531097 1324332

K12 Module Cable, m12, 12pin, 5m SCHUNK INTEC INC. 1 EA

1100415016 1589481

CTS B-100-MM-V Active Pneumatic Storage SCHUNK INTEC INC. 4 EA

1100415018 1624154

CTS B-100-AV-V-CPB063-080 Adapter Plate SCHUNK INTEC INC. 4 EA

1100415019 1594752

CTS B-MP-1) Optional Mounting plate SCHUNK INTEC INC. 4 EA

1100531099 1332525

CTS MB-45x45 Profile angle SCHUNK INTEC INC. 8 EA

1100531101 1604713

CTS BP-90x90 Base plate SCHUNK INTEC INC. 2 EA

1100531102 0302581

CTS BB-90x90 Profile angle SCHUNK INTEC INC. 8 EA

1100531103 1564971

CTS PV-90x90-920 Vertical profile SCHUNK INTEC INC. 2 EA

1100531104 0303228

CTS PH-45x90-920 Cross profile SCHUNK INTEC INC. 1 EA

3. Place of Performance

Marshall Space Flight Center (MSFC)

4. Period of Performance

30 days ARO

File details come from the government source that posted it. Updated .