This is a Questions and Answers document for NASA federal contract SATPC0042910 / 80NSSC27945558Q concerning a Universal Robotics UR30 Robot Workstation and Console procurement. The document provides clarification on 22 substantive inquiries from potential vendors regarding authorization requirements, delivery terms, technical specifications, and operational details.
Key procurement details include: vendors must obtain authorization to resell from all manufacturers represented in the Statement of Work, not just Universal Robots; hardware delivery shall occur FOB Destination within 90 days ARO, with offerors stating their proposed lead time (which will not be found unacceptable if within the 90-day window); 20 hours of workstation assembly must be completed prior to shipment and is included in the hardware lead time; five consecutive 8-hour days of on-site applications engineering by an Authorized Universal Robotics integrator/reseller shall be scheduled by mutual agreement within 30 days after delivery and are not counted against hardware lead time; partial shipments are acceptable with final acceptance upon completion of on-site applications engineering. The Advantech TPC-B520-BTO computer requires minimum specifications of i5 or better processor, 16GB+ memory, 256GB+ SSD/NVME storage, Windows 10/11 operating system, and 21.5" or greater touch display, with alternate configurations acceptable only if exceeding these specifications. Electrical components line item 1100526749 includes a 24 VDC 10A power supply, circuit breakers, disconnect switch, DIN-rail terminal blocks, wire, and mounting hardware sized by the integrator. Delivery address is NASA Marshall Space Flight Center Central Receiving in Huntsville, Alabama, with on-site work in Building 4475; contractor personnel require visitor badging with names and citizenship provided seven business days in advance. Payment terms are Net 30 via Invoice Processing Platform following delivery and acceptance. Duty-free entry certificates are not required for U.S. authorized distributor domestic stock.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0042910 Tab 10 3 SOW.pdf | ||
| SATPC0042910 Tab 10 2 BNJ_Redacted.pdf | ||
| SATPC0042910 Tab 10 1 RFQ Open Market.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SATPC0042910 / 80NSSC27945558Q
Universal Robotics UR30 Robot Workstation and Console
Questions and Answers
1. The notice states that vendors must confirm authorization to resell the items listed in the Statement of Work (SOW). Since the Statement of Work includes components from multiple manufacturers in addition to Universal Robots USA, Inc., does the authorization requirement apply to:
A. All manufacturers represented in the SOW; or B. Only the Universal Robots brand-name equipment, with the remaining components permitted to be sourced through standard commercial channels?
Answer: All manufacturer represented in the SOW.
2. Delivery: The SOW lists a period of performance of 30 days ARO, which includes shop assembly of the workstation and 5 days of on-site applications engineering.
Universal Robots and tooling lead times can run longer than 30 days. Would the Government accept a delivery of up to 60 days ARO, or allow offerors to propose their best lead time without being found unacceptable?
Answer: Hardware shall be delivered FOB Destination within 90 days ARO. Offerors shall state their proposed hardware lead time in the quote; a lead time within this period will not be found unacceptable. The 20 hours of workstation assembly shall be completed prior to shipment and is included in the hardware lead time. The 5 days of on-site applications engineering shall be scheduled by mutual agreement within 30 days after delivery and are not counted against the hardware lead time. Partial shipments are acceptable; final acceptance occurs upon completion of the on-site applications engineering.
3. Delivery address: Please confirm the ship-to and service location at Marshall Space Flight Center (building and any receiving or badging instructions for the field engineer).
Answer: Ship to: NASA Marshall Space Flight Center, Central Receiving, Huntsville, AL 35812, Attn: Jarvis Caffrey – 256-544-8464. On-site work will be performed in Building 4475. Contractor personnel will be badged as visitors in accordance with FAR 52.204-9 and escorted by NASA personnel; the Contractor shall provide personnel names and citizenship 7 business days in advance of the visit. Foreign nationals require advance approval and additional lead time.
4. Line "1100526749, Electrical components for workstation, 1 EA": Is there a drawing, bill of materials or quote reference that defines this line, so all offerors price the same scope?
Answer: This line consists of the electrical components required to assemble and power the operator workstation and the remotely integrated robot workstation. This installed equipment is powered from a single 120 VAC feed.
Components may include the following, with quantities/sizing determined by the integrator
• 24 VDC, 10 A power supply, 115–230 VAC input (Murr 85165 or equivalent)
• 5 A circuit breaker (L85/5/1/C or equivalent)
• 10 A circuit breaker for power supply (L8/10/1/C or equivalent)
• Front-panel-mount disconnect with operator (LE7-16-1753 / LFS2-L-4-175 or equivalent)
• DIN-rail terminal blocks, ground terminals, end barriers, jumpers, labels, and retainers (V7-W4, V7-WG4, V7-EB3, V7-CJD6-10, V7-SM6X12, V7-ER35 or equivalent)
• Associated wire, wire duct, and mounting hardware
5. Field service: Are the 5 days of applications engineering to be performed consecutively on site at MSFC, and is there a required time frame after delivery?
Answer: Five consecutive 8-hour days on site at MSFC by a qualified applications engineer through an Authorized Universal Robotics integrator/reseller, scheduled by mutual agreement within 30 days after hardware delivery.
6. Proof of pricing: Will a written quote from an authorized Universal Robots distributor, along with that distributor's written authorization to resell, satisfy the requirement for proof of manufacturer pricing and resale authorization for all lines, including the Robotiq, Schunk, Saginaw, APT, Advantech and Antaira items?
Answer: Yes
7. Payment: Since payment will not be by credit card, please confirm that payment will be by invoice (net 30 under the Prompt Payment Act) after delivery and acceptance.
Answer: Payment Terms are Net30; all invoices shall be submitted via Invoice Processing Platform (IPP)
8. If we purchase through an authorized distributor/integrator, what documentation will NASA accept to demonstrate Astra’s authorization to resell the listed items?
Answer: Signed documentation by distributor.
9. For proof of manufacturer pricing, is a distributor quotation supported by manufacturer pricing documentation acceptable?
Answer: Yes
10. Does the 30-day period after receipt of order cover equipment delivery only, or must assembly and all five days of onsite engineering also be completed within that period?
Answer: Hardware shall be delivered FOB Destination within 90 days ARO. Offerors shall state their proposed hardware lead time in the quote; a lead time within this period will not be found unacceptable. The 20 hours of workstation assembly shall be completed prior to shipment and is included in the hardware lead time. The 5 days of on-site applications engineering shall be scheduled by mutual agreement within 30 days after delivery and are not counted against the hardware lead time. Partial shipments are acceptable; final acceptance occurs upon completion of the on-site applications engineering.
11. What work and acceptance criteria apply to the five days of field engineering—for example, installation, programming, commissioning, safety validation, or operator training?
Answer: Five consecutive 8-hour days on site at MSFC by a qualified applications engineer through an Authorized Universal Robotics integrator/reseller, scheduled by mutual agreement within 30 days after hardware delivery.
12. Could NASA provide the required configuration for the Advantech TPC-B520-BTO computer and the component list for item 1100526749, “Electrical components for workstation”?
Answer:
The required configuration is:
• Processor: i5 or better
• Memory: 16 Gb+
• Storage: 256 Gb+ SSD/NVME
• Operating system: Win 10/11
• Display: 21.5” or Greater - Touch
Alternate configurations will be considered only if they meet or exceed each of the above specifications and are clearly identified in the quote.
13. Could you confirm the delivery address and any receiving or site-access requirements that should be included in our pricing and schedule?
Answer: Ship to: NASA Marshall Space Flight Center, Central Receiving, Huntsville, AL 35812, Attn: Jarvis Caffrey – 256-544-8464. On-site work will be performed in Building 4475. Contractor personnel will be badged as visitors in accordance with FAR 52.204-9 and escorted by NASA personnel; the Contractor shall provide personnel names and citizenship 7 business days in advance of the visit. Foreign nationals require advance approval and additional lead time.
14. Can the government please define the components for this part number?
PART#: 1100526749
DESCRIPTION: Electrical components for workstation
QTY: 1 EA
Answer: This line consists of the electrical components required to assemble and power the operator workstation and the remotely integrated robot workstation. This installed equipment is powered from a single 120 VAC feed.
Components may include the following, with quantities/sizing determined by the integrator
• 24 VDC, 10 A power supply, 115–230 VAC input (Murr 85165 or equivalent)
• 5 A circuit breaker (L85/5/1/C or equivalent)
• 10 A circuit breaker for power supply (L8/10/1/C or equivalent)
• Front-panel-mount disconnect with operator (LE7-16-1753 / LFS2-L-4-175 or equivalent)
• DIN-rail terminal blocks, ground terminals, end barriers, jumpers, labels, and retainers (V7-W4, V7-WG4, V7-EB3, V7-CJD6-10, V7-SM6X12, V7-ER35 or equivalent)
• Associated wire, wire duct, and mounting hardware
15. Advantech TPC-B520-BTO. This is a built-to-order unit, and the SOW doesn't specify a configuration. Please provide the required display size, processor, memory, storage and operating system. If none is required, is the following acceptable: i5,
15.6 in touch display, 16 GB RAM, SSD, Windows 11 IoT Enterprise LTSC?
Answer: The required configuration is:
• Processor: i5 or better
• Memory: 16 Gb+
• Storage: 256 Gb+ SSD/NVME
• Operating system: Win 10/11
• Display: 21.5” or Greater - Touch
Alternate configurations will be considered only if they meet or exceed each of the above specifications and are clearly identified in the quote.
16. Electrical components for workstation (1 EA). Is there a parts list or drawing for this line? If not, please confirm that the scope is the power distribution, 24 VDC supply, circuit protection, terminals and wiring needed to power the PC, switch, tool changer and storage stations from a single 120 VAC feed.
Answer: This line consists of the electrical components required to assemble and power the operator workstation and the remotely integrated robot workstation. This installed equipment is powered from a single 120 VAC feed.
Components may include the following, with quantities/sizing determined by the integrator o 24 VDC, 10 A power supply, 115–230 VAC input (Murr 85165 or equivalent) o 5 A circuit breaker (L85/5/1/C or equivalent) o 10 A circuit breaker for power supply (L8/10/1/C or equivalent) o Front-panel-mount disconnect with operator (LE7-16-1753 / LFS2-L-4-175 or equivalent) o DIN-rail terminal blocks, ground terminals, end barriers, jumpers, labels, and retainers (V7-W4, V7-WG4, V7-EB3, V7-CJD6-10, V7-SM6X12, V7-ER35 or equivalent) o Associated wire, wire duct, and mounting hardware
17. Flange adapters. The UR30 has an ISO 9409-1-80 tool flange. The SOW does not list a robot-side adapter between that flange and the SCHUNK CPS 040-K-S, or tool-side adapter plates between the four CPS 040-A tool sides and the Robotiq tools. Should we include them (SCHUNK ISO-A80-R, ID 1581814, plus custom tool-side plates), or does NASA already have them?
Answer: Offerors shall include all mechanical adapters required to mount the SCHUNK CPS 040-K-S master to the UR30 tool flange (e.g., SCHUNK ISO-A80-R, ID 1581814, or equivalent) and to mount the Robotiq 2F-85, Hand-E, Screwdriving Solution, and Wrist Camera to the four CPS 040-A tool sides.
18. Delivery. The period of performance is 30 days ARO. If manufacturer lead times for the SCHUNK CTS storage components or the built-to-order items exceed 30 days, will NASA accept a quoted lead time beyond 30 days, or a partial delivery with the remaining items to follow?
Answer: Hardware shall be delivered FOB Destination within 90 days ARO. Offerors shall state their proposed hardware lead time in the quote; a lead time within this period will not be found unacceptable. The 20 hours of workstation assembly shall be completed prior to shipment and is included in the hardware lead time. The 5 days of on-site applications engineering shall be scheduled by mutual agreement within 30 days after delivery and are not counted against the hardware lead time. Partial shipments are acceptable; final acceptance occurs upon completion of the on-site applications engineering.
19. Workstation assembly (20 hours). Should the workstation be assembled and tested at our facility and shipped assembled, or assembled on site at MSFC during the field service days?
Answer: The operator workstation (Saginaw consolet, pedestal, and base, with the Advantech Panel PC, Antaira Ethernet switch) shall be assembled and tested at the Contractor's facility and shipped as an assembled unit. The cobot base and toolchanger workstation may assume field assembly onsite upon delivery.
20. Field service (5 days). Please confirm the building at MSFC, whether the 5 days must be consecutive, and the badging or escort requirements for our personnel under FAR 52.204-9.
Answer: Five consecutive 8-hour days on site at MSFC by a qualified applications engineer through an Authorized Universal Robotics integrator/reseller, scheduled by mutual agreement within 30 days after hardware delivery.
21. Duty-free entry. We intend to buy all items from a U.S. authorized distributor's domestic stock, so no importation is planned under this order. Please confirm that NASA does not require duty-free entry certificates for this procurement.
Answer: Duty-Free Certificates are not required on U.S. authorized distributor’s domestic stock.
22. “The SOW lists one Advantech TPC-B520-BTO built-to-order PC but does not specify its required configuration. Could you please confirm the minimum requirements for the following?
• CPU / processor
• Memory (RAM)
• Storage capacity and type
• Operating system
• Screen size and aspect ratio”
If a specific configuration is not mandated, please confirm whether a suitable standard configuration meeting the workstation's operational requirements would be acceptable.
As the quotation submission deadline is approaching, we would appreciate your response as soon as possible.
Answer:
Advantech TPC-B520-BTO configuration The required configuration is:
• Processor: i5 or better
• Memory: 16 Gb+
• Storage: 256 Gb+ SSD/NVME
• Operating system: Win 10/11
• Display: 21.5” or Greater - Touch
Alternate configurations will be considered only if they meet or exceed each of the above specifications and are clearly identified in the quote.