This is a Statement of Work (SOW) for the Aeolus Wide Field Context Camera (WFCC) Lens Design Option Evaluation under a NASA contract.
The work involves evaluating three distinct design and development options for a flight-qualified lens for the Aeolus WFCC, which provides aerosol abundance context for NASA's Mars orbital observation instrument suite. The subcontractor must perform preliminary lens design work for a "clean sheet" design; evaluate reuse or minor modification of existing flight-qualified lens designs, particularly modifications of the VIPER mission NavCam lens; and assess modified Commercial Off-The-Shelf (COTS) lens options, with particular interest in radiation-tolerant designs from COTS vendors. Each evaluation must establish the likelihood of meeting performance requirements (field of view, sharpness, chromatic aberration, and image circle size) and provide rough order of magnitude cost and schedule estimates. The required qualifications include a demonstrated history of successfully designing, developing, and delivering flight lenses for deep space orbiter imaging systems; a minimum of 10 years designing space-qualified optics; and an MS degree in optical sciences, physics, or related fields.
The period of performance is 120 hours from the award date through a to-be-determined completion date. No travel is required. Deliverables include weekly status meeting reports and written assessments of each design option by to-be-determined due dates, along with any Zemax models or simulations developed. Acceptance criteria require demonstration of current work disposition in weekly meetings and delivery of documented evaluations and any analytical models produced.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0042039 Tab 10 RFQ Open Market Template APR 2026.pdf | ||
| SATPC0042039 Tab 10 RFQ Open Market Template APR 2026.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Aeolus Wide Field Context Camera (WFCC) Lens Design Option Evaluation
Prime Contract No.
Page 1 of 2 RFP No.
BACKGROUND
NASA is developing the Aeolus instrument suite to investigate the processes driving seasonal cycles of dust and water ice on Mars by systematic observation of its atmosphere from orbit. Within this suite, the Aeolus Wide Field Context Camera (WFCC) provides aerosol abundance context for the energy balance observations made by the other Aeolus instruments.
This task will evaluate design and development options for the Aeolus WFCC lens. Engineering tasks may include simulation, modeling, and analysis. Additionally, tasks may involve estimation of costs and schedule for different options, as well as identification of suitable previously flight qualified lenses options, or suitable COTS or modified COTS lens options.
OBJECTIVE
The objective of this task is to evaluate options for the development of a flight qualified lens for the Aeolus WFCC. The options of interest are:
• Development of a “clean sheet” design.
• Reuse of a flight qualified lens design, or minor modification thereof.
• Use of a COTS lens with minor or significant modifications.
REQUIRED QUALIFICATIONS
• A demonstrated history of successfully designing, developing, and delivering flight lenses for deep space orbiter imaging systems meeting schedule, performance, and environmental requirements.
• A minimum of 10 years designing space qualified optics.
• MS in optical sciences, physics, or related fields.
SCOPE OF WORK
The Subcontractor will be responsible for performing the following tasks:
1. Perform preliminary lens design work for a “clean sheet” design meeting field of view (FOV), sharpness, chromatic aberration, and image circle size requirements. A final optimized design is not desired, but evaluation should be sufficient to:
a. Establish the likelihood of meeting provided performance requirements
b. Provide rough estimates of the size and mass of the lens
c. Provide rough order of magnitude (ROM) cost and schedule estimates.
2. Evaluate the option of using an existing flight qualified lens design or minor modification thereof, meeting FOV, sharpness, chromatic aberration, and image circle size requirements. Of particular interest are modifications of the VIPER mission NavCam lens design, including replacement of the bandpass filter in the current design with a clear window in a dual camera approach, or using existing lens elements in a fisheye lens design. The evaluation should be sufficient to:
a. Establish the likelihood of meeting provided performance requirements.
b. Provide rough order of magnitude (ROM) cost and schedule estimates.
3. Evaluate the option of using a modified COTS lens for the WFCC, meeting FOV, sharpness, chromatic aberration, and image circle size requirements. This task may involve contacting COTS vendors for lens design details to identify promising candidates. Of particular interest are vendors with radiation tolerant designs. The evaluation should be sufficient to:
a. Establish the likelihood of meeting provided performance and environmental requirements.
b. Provide rough order of magnitude (ROM) cost and schedule estimates.
STATEMENT OF WORK
Aeolus Wide Field Context Camera (WFCC) Lens Design Option Evaluation
Prime Contract No.
Page 2 of 2 RFP No.
PERIOD OF PERFORMANCE
120 hours. Upon Award Date thru [TBD]
TRAVEL REQUIREMENTS
No travel is required.
MILESTONES/DELIVERABLES
No Milestone Due Date Reporting
2 Weekly status meetings Recurring Evaluate Design Options
3 Deliver assessment of the “clean sheet” design option [TBD] 4 Deliver assessment of the option to reuse a flight qualified lens design, or minor modification thereof
[TBD]
5 Deliver assessment of the option to use a modified COTS lens [TBD]
ACCEPTANCE CRITERIA
Subcontractor work will be deemed accepted when the following performance criteria have been met:
Progress reporting
• Weekly meetings: current disposition of work
Delivered Documentation
• Written evaluations of the options investigated.
• Any Zemax models or simulations developed.
| REQUIRED QUALIFICATIONS |
| SCOPE OF WORK |
| PERIOD OF PERFORMANCE |
| TRAVEL REQUIREMENTS |
| MILESTONES/DELIVERABLES |
ACCEPTANCE CRITERIA