SATPC0041887 Tab 04 4 SOW.pdf

PDF 126 KB Posted

Attached to
Flight MLI blankets for the PILS component
Solicitation number
80NSSC26938760Q
Issued by

About this file

This is a Statement of Work for the design, manufacture, and delivery of a Multi-Layer Insulation (MLI) blanket replacement for the Photovoltaic Investigation of the Lunar Surface (PILS) payload. The previous blanket was compromised during vibrational testing and requires replacement.

The contractor shall design and manufacture an MLI blanket meeting specific thermal performance requirements: total emissivity of 0.08 or lower and outer layer absorptivity of 0.44 or lower. Additional contractor responsibilities include procuring all necessary materials for blanket production, performing fit testing on a 3D-printed mockup of the actual payload to verify proper fit, and shipping the completed blanket by the defined deadline. Work shall be performed at the Vantage Systems facility in Lanham, Maryland, with fabrication occurring between August 3, 2026, and February 3, 2027.

View the file

Other files

File Type Posted
SATPC0041887 Tab 07 Capability Statement.pdf PDF
SATPC0041887 Tab 06 RDSS..pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements A MLI blanket is required for the Photovoltaic Investigation of the Lunar Surface (PILS) payload. The previous blanket was compromised during vibrational testing, so a replacement must be provided.

2. Characteristics, Scope, and Specs

The contractor shall perform the following duties:

• Design and manufacture an MLI blanket with a total emissivity of 0.08 or lower, and an outer layer absorptivity of 0.44 or lower.

• Procure any materials necessary to produce the blanket.

• Perform any fitting on a 3d-printed mockup of the actual payload to ensure it properly fits.

• Ship the MLI blanket at or before the defined deadline.

3. Place of Performance Vantage Systems facility in Lanham, MD.

4. Period of Performance Fabrication of the blanket shall occur between 8/3/2026 and 2/3/2027

File details come from the government source that posted it. Updated .