SATPC0040216 Tab 04 4 SOW..pdf
PDF 758 KB Posted
- Solicitation number
- 80NSSC26916543Q
About this file
This Statement of Work (SOW) details a contract supporting the RockOn student launch opportunity at NASA's Wallops Flight Facility (WFF) from October 2025 to September 2026. The contractor will provide comprehensive support including lead production and kitting of workshop hardware for 40 kits, onsite technical support during workshop instruction in June 2026 for 20-24 teams with 3-4 students and faculty per team, and associated travel support.
The majority of work will be performed in Byers, Colorado, with required travel to WFF. The document includes a sole source justification indicating the contractor has supported the RockOn workshop for the past 4 years, providing pre-workshop kit and hardware production with lead coordination. The contractor possesses unique logistical and kit production knowledge not available from other sources, and will collaborate with the NASA Sounding Rocket Program Office throughout the project period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0040216 Tab 07 Capability Statement SAM.gov 1.pdf | ||
| SATPC0040216 Tab 06 RDSS..pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .