SATPC0040061 Tab 04 4 SOW..pdf

PDF 140 KB Posted

Attached to
DTS SLICE NANO Hardware
Solicitation number
80NSSC26920636Q
Issued by

About this file

This Statement of Work (SOW) details NASA Langley Research Center's requirement to purchase DTS SLICE NANO Hardware and accessories as direct replacements for systems damaged during SpaceX Bay 12 testing. The procurement includes specific quantities of hardware components such as 2 SLICE NANO Base+ units, 3 SLICE NANO Bridge units, 2 SLICE NANO Stack Batteries, 1 End-of-Chain Terminal, 2 power cables, and 2 different Li-ion batteries with varying capacities.

The performance will take place at NASA Langley Research Center, with a contract performance period of 4-6 weeks after receipt of order (ARO). The SOW also includes mandatory AI verbiage requiring contractors to disclose AI technology usage during contract performance and provide additional requirements when acquiring covered AI systems or services, as defined by OMB memo M-25-22, with a September 2025 implementation date.

View the file

Other files

File Type Posted
Tab 07 Capability Statement SAM.gov 1.pdf PDF
SATPC0040061 Tab 06 RDSS..pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements The NASA Langley Research Center (LaRC) requires the purchase of DTS SLICE NANO Hardware and accessories which will be direct replacements for systems that were damaged during SpaceX Bay 12 testing in support of the commercial program.

2. Characteristics, Scope, and Specs

Quantity OEM Part # Product Description 2 13000-20200 SLICE NANO Base+ (10 cm; 10 cm) (Tall 3 13000-20020 SLICE NANO Bridge (3 MCS-07) (10 cm; 10 cm; 10 cm) 2 13000-20300 SLICE NANO Stack Battery (Tall) (use w/13000-2020x) 1 13000-30010 SLICE End-of-Chain Terminal (1 m) 2 13000-30250 Cable, power (Molex to pigtail termination) (12 in) 1 13000-30210 Battery, Li-ion; 10.8 V (nominal), 2200 mAh 1 13000-30220 Battery, Li-ion; 10.8 V (nominal), 4400 mAh

3. Place of Performance NASA Langley Research Center (LaRC)

4. Period of Performance 4 – 6 Weeks ARO

AI VERBIAGE:

1) Use of Artificial Intelligence (AI) During Contract Performance (SEP 2025) which requires contractors to disclose the use of AI technologies at any time during the fulfillment of the contract. This requirement statement must be included in all contracts (including orders); and

2) Artificial Intelligence (AI) Acquisitions (SEP 2025) which provides additional contractor requirements when the contract is acquiring covered AI systems or services as defined by OMB memo M-25-22. This requirement statement must be included in all contracts (including orders) when acquiring covered AI systems or services. Covered AI systems or services and exceptions are listed below as defined OMB memo M-25-22).

File details come from the government source that posted it. Updated .