This Statement of Work (SOW) is for NASA Goddard's Opto-Mechanical Design and Fabrication project for the Landolt mission. The vendor will be responsible for providing opto-mechanical design and fabrication of assembled parts, specifically requiring expertise with the Landolt mission system, including element wheel, bus interfaces, laser tray architecture, finite element analysis (FEA), thermal analysis, and radiation simulations.

Key contract details include minimal schedule risk, vendor-managed tasks with project coordination supported by a point of contact, and regular meetings with the DPI. Status reports will be provided monthly, and work will be conducted from the vendor's offices. The document also includes two notable AI-related clauses effective September 2025, requiring contractors to disclose AI technology use during contract performance and providing additional requirements for AI system acquisitions, though the specific project has no AI-related work planned.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for the NASA Goddard

Opto-Mechanical Design and Fabrication

Submitted by

Goddard Space Flight Center Greenbelt, MD 20771

Statement of Work

Overview The Vendor role will be to provide opto-mechanical design and delivery of fabricated and assembled parts for the Laser Instrument for the Landolt mission, vendor must have past experience with the Landolt mission system, including element wheel, bus interfaces, laser tray architecture, FEA and thermal analysis capabilities, and radiation simulations.

Technical Evaluation Vendor will conduct evaluation in conjunction with the customer prior to fabrication of parts.

Risk and Management The labor and NRE are sufficient to accomplish the upgrades.

The schedule risk is minimal.

Vendor will provide overall management of the tasks with project coordination supported by a POC. Regular meetings will be held with the DPI.

Reporting Status reports will be provided by request, and not less than monthly.

Facilities & Equipment Vendor offices will provide the base for the proposed work.

There is no AI related work conducted with this effort

1) Use of Artificial Intelligence (AI) During Contract Performance (SEP 2025) which requires contractors to disclose the use of AI technologies at any time during the fulfillment of the contract. This requirement statement must be included in all contracts (including orders); and

2) Artificial Intelligence (AI) Acquisitions (SEP 2025) which provides additional contractor requirements when the contract is acquiring covered AI systems or services as defined by OMB memo M-25-22. This requirement statement must be included in all contracts (including orders) when acquiring covered AI systems or services. Covered AI systems or services and exceptions are listed below as defined OMB memo M-25-22).

File details come from the government source that posted it. Updated .