SATPC0039547 Tab 04 4 SOW..pdf
PDF 198 KB Posted
- Attached to
- TTTech TTE-Switch Lab Space and End System PCIe Board Federal contract opportunity
- Solicitation number
- 80NSSC25912912Q
About this file
This Statement of Work (SOW) details NASA Johnson Space Center's requirement to purchase six laboratory equipment items from TTTech for prototype and testing purposes. Specifically, the procurement includes three high-performance 24-port TTE-Switch Lab Space units (Part # 13790) and three TTE-End System PCIe boards with three 100/1000Mbit/s Ethernet ports (Part # 13791). These specialized components will be used to prototype, test, and analyze unreleased flight software and emulated flight hardware interfaces. The performance will occur at NASA Johnson Space Center in Houston, TX, with a delivery timeline of 6-8 weeks after receipt of order (ARO). The solicitation is identified as a sole source requirement, indicating TTTech is the exclusive provider for these specific technical components.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0039547 Tab 07 Capability Statement SAM.gov.pdf | ||
| SATPC0039547 Tab 06 RDSS..pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
Johnson Space Center requires the purchase of three (3) TTTech TTE-Switch Lab Space and three (3) TTTech TTE-End System Lab Space to which will be used to prototype, test, and analyze unreleased flight software and emulated flight hardware interfaces.
2. Characteristics, Scope, and Specs
Part # Description Qty
13790
The high-performance 24-port TTE-Switch Lab Space supports laboratory testing efforts of Time-Triggered Ethernet applications. It provides a representative flight utilization by using the TTE-Switch Controller HiRel at its core.
13791
TTE-End System PCIe board with three 100/1000Mbit/s Ethernet ports to support laboratory testing applications with TTEthernet. It provides a representative flight utilization by using the TTE-End System Controller HiRel at its core.
3. Place of Performance NASA Johnson Space Center Houston, TX 77058
4. Period of Performance
6-8 weeks ARO
File details come from the government source that posted it. Updated .