This Statement of Work (SOW) details repair requirements for four 500kW Yaskawa inverters at Kennedy Space Center in Florida. The vendor must conduct repairs identified by the manufacturer's Field Service Engineer, including replacing damaged cores, ground fault boards, capacitors, control power transformers, installing DC CT kits, and addressing miscellaneous small components specified in the manufacturer's quote. The work involves verifying proper inverter operation after equipment installation and determining if any additional repairs are needed.
The performance location is Kennedy Space Center, Florida, with an expected labor duration of less than one week. The period of performance is currently to be determined (TBD). The primary objective is to complete comprehensive repairs to ensure the functional integrity of the four industrial inverters, with a focus on thorough diagnostic assessment and precise component replacement as recommended by the manufacturer's technical expert.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
• The Kennedy Space Center has four 500kw Yaskawa inverters that need repairs performed. The objective of this order is to complete repairs identified by manufacturer’s Field Service Engineer
2. Characteristics, Scope, and Specs
The vendor shall provide the following:
• Conduct repairs identified by manufacturer Field Service Engineer
Summary of repairs
1. Replace damaged cores
2. Replace ground fault boards
3. Install new capacitors
4. Replace control power transformers
5. Install DC CT kits
6. Misc small components identified in manufacturer quote.
• Verify proper operation of inverters (4) upon completion of installed equipment and determine in any additional repairs are needed
3. Place of Performance
Kennedy Space Center, FL
4. Period of Performance TBD, expected duration <1 Week labor