This document is a Statement of Work (SOW) for an installation contract to provide materials and labor to install an 18-inch raised floor in the Direct Connect Supersonic Combustion Test Facility (DCSCTF) Control Room.
The key objectives are to provide a safe raised floor system that supports all control room equipment, furniture, and personnel, and allows under-floor access for wall-to-wall cable runs. The contractor shall install 806 square feet of access floor system with specific characteristics, including a 1250 lbs. concentrated load rating, anti-static high pressure laminate floor finish, and a finished floor height of 18-inches. The contractor shall also install handrails, steps, aluminum fascia, a clear view panel, and provide spare materials. The contractor shall price to allow for up to 20 cable/equipment cutouts with brushed grommets. The total contract award is for the 806 square foot raised floor installation and associated materials as specified in the SOW.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0036126 Tab 06 BNJ Redacted.pdf | ||
| SATPC0036126 Tab 10 Open Market RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1.0 Introduction/Background: The Direct Connect Supersonic Combustion Test Facility (DCSCTF) is going through control room renovations. This is an installation contract to provide materials and labor to install an 18-inch raised floor in the DCSCTF Control Room.
2.0 Scope of Work: Provide materials and labor to install a raised platform floor in the DCSCTF Control Room as specified in the description of work below.
3.0 Objectives: To provide a safe raised floor system that supports all control room equipment, furniture, and personnel, and allows under-floor access for wall-to-wall cable runs.
4.0 Description of the Work/Contractor Tasks: The contractor shall provide all materials and labor to perform the following tasks:
1. Install 806 square feet of ASM FS200 Access floor system manufactured by ASM as per figure 1 below. Raised platform floor shall have the following characteristics
a. Load rating 1250 lbs. concentrated load;
b. Anti-Static high pressure laminate floor finish (Color: Gray Starlite);
c. Bolted stringer 4’x4’ basketweave understructure;
d. Finished floor height 18-inches
2. Install 29 linear feet of handrails as per figure 1.
3. Install (2) 36-inch wide steps as per figure 1.
4. Install (1) 48-inch wide step as per figure 1.
5. Install anodized Aluminum fascia as required.
6. Install (1) clear view panel, positioned directly over existing observation port. Contractor shall assume that clear view panel placement will not align with the stringer pattern and make appropriate allowance (see note 4 of figure 1).
7. Provide 160 square feet of FS20 Access floor system material (panels, stringers, staunchens, etc.) to allow for future expansion of the raised platform floor.
8. Provide (6) additional floor panels to be used as spares by the government.
9. Provide (1) additional clear view panel to be used as a spare by the government.
10. Provide (2) double cup suction panel lifter tools.
11. Price to include allowance of up to 20 cutouts for passing cables or other equipment as required. Cutouts shall be finished with brushed grommets.
Figure 1. Plan view of raised floor in the DCSCTF Control Room.
5.0 Deliverables: The contractor shall provide a 806 square foot, 18-inch raised floor as specified in the description of work. The contractor shall also provide all spare materials as specified in the description of work.
Other Considerations:
Applicable Documents/Background: N/A
Milestones: N/A
Government-furnished property – N/A
Government-furnished information -N/A