This statement of work outlines requirements for an ultrasonic cleaning system. The system must include five tanks for cleaning, rinsing, and drying various propulsion components for rocket engine testing at NASA Stennis Space Center. Tank 3 is a heated ultrasonic tank for caustic cleaner, Tank 4 an ambient temperature tank for deoxidizer, Tank 5 a heated agitated rinse tank, and a NEMA Type 12 control enclosure housing electrical components. Delivery is required within 26 weeks of award. The related solicitation is for this ultrasonic cleaning system with responses due under NASA SSC solicitation number 80NSSC23844421Q.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0032524 Q and A.pdf | ||
| SATPC0032524 Tab 10 Open Market RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for Ultrasonic Cleaning System
1) Objective:
NASA Stennis Space Center (SSC) precision cleans a variety of tubing pieces, piping pieces, and fluid components for our propellant systems on our rocket engine test stands.
The vendor shall provide a system, which includes the following:
1) Tank 3: for Caustic Cleaner Cee‐Bee J‐84AL
• Heated Ultrasonic Cleaning Tank with 30kHz zero‐spaced magnetostrictive transducers
2) Tank 4: for Deoxidizer Cee‐Bee C‐623
• Ambient Temperature C‐623 Tank
3) Tank 5: Heated Agitated Deionized (DI) Water Rinse Tank
4) NEMA Type 12 Control/Generator Enclosure
• Free standing enclosure with closed‐loop air conditioner to house generator assemblies, electrical control components and operator controls for all system functions. Includes controls for items 1 through 3 as well as space for controls for potential future addition of:
• ‐ (1) Mild Alkaline Ultrasonic Clean Tank with Overflow (Cee Bee Super Bee 300LF)
• ‐ (1) Agitated Rinse Tank (DI Water)
• ‐ (1) Acid Rinse Tank (Nitric Acid 30%)
• ‐ (1) Agitated Rinse Tank (DI Water)
• ‐ (1): Corrosion Inhibitor Rinse Tank (Cee‐Bee MX‐15U)
• ‐ (1) Utility Dryer
2) Details:
Tank 3: Heated Ultrasonic Cleaning Tank with Overflow for Caustic Cleaner Cee‐Bee J‐84AL
‐ Tanks holding the fluid shall be 10 gauge 316L stainless steel construction
‐ Insulated for heat retention and protection of operator, with removeable stainless steel skin
‐ Cleaning Chamber Working Dimensions
• Left to Right: 50” minimum
• Front to Back: 36” minimum
• Depth: 28” minimum
‐ Overall Dimensions: 74" L‐R x 60" F‐B x 44" High (80" high with exhaust)
‐ The 16" at the rear of the chamber will be utilized for the top mounted installation of heaters, filter pump, level switches and fill port. This allows for easy maintenance of these items from the rear of the system without the need to drain cleaning solution. This also keeps the minimum number of connections below solution level to minimize risk of solution leaks and drips.
‐ Work rest to support parts load and protects ultrasonic diaphragm
‐ 10,000 watts bottom mounted ultrasonic 30kHz sweep‐frequency zero‐spaced magnetostrictive transducers with 3/16” thick 316L Stainless Steel diaphragm
‐ Heaters
• Two 9KW SST over the side Immersion Heaters w/ Digital Temperature Controller
• Controllable from ambient to 200 degF
‐ Filtration system with over the side pump
‐ Surface skimming
‐ Digital timer with On/Off/Auto function
‐ Low level sensors
‐ Vapor exhaust duct connections located to the rear of the cleaning tank
‐ Stainless steel, 2‐piece hinged, bi‐folding lid
‐ Level switches, installed in the overflow chamber, along with a fresh water inlet solenoid valve
‐ Stainless steel drain valve
‐ Overflow chamber
• 16" L‐R x 52" F‐B x 30" Depth
• Stainless steel belt skimmer with 4" wide belt, 12GPH oil removal capacity
• Mag drive pump with stainless steel pump head for circulation of solution from the overflow chamber to the sparge bar
• Stainless steel, 2‐piece hinged, bi‐folding lid
• Stainless steel drain valve
‐ Exhaust: CPVC ventilation duct located to the rear of the cleaning chamber
• Includes (3) 2" horizontal slots, (1) near solution surface and (2) evenly spaced across the vertical height (36") for pulling fumes from solution surface as well as parts as they are removed from the cleaning chamber
Tank 4: Ambient Temperature Tank for Deoxidizer Cee‐Bee C‐623
‐ Tanks holding the fluid shall be 10 gauge 316L stainless steel construction
‐ Removeable stainless steel skin panels
‐ Rinse Chamber Working Dimensions
• Left to Right: 50” minimum
• Front to Back: 36” minimum
• Depth: 28” minimum
‐ Overall Dimensions: 58" L‐R x 60" F‐B x 44" High
‐ The 16" at the rear of the chamber will be utilized for the top mounted installation level switches and fill port. This allows for easy maintenance of these items from the rear of the system without the need to drain cleaning solution. This also keeps the minimum number of connections below solution level to minimize risk of solution leaks and drips.
‐ Stainless steel, 2‐piece hinged, bi‐folding lid
‐ Stainless steel drain valve
‐ Level switches and a fresh water inlet solenoid valve
Tank 5: Heated Agitated Deionized (DI) Water Rinse Tank
‐ Tanks holding the fluid shall be 10 gauge 316L stainless steel construction
‐ Insulated for heat retention and protection of operator, with removeable stainless steel skin
‐ Rinse Chamber Working Dimensions
• Left to Right: 50” minimum
• Front to Back: 36” minimum
• Depth: 28” minimum
‐ Overall Dimensions: 58" L‐R x 60" F‐B x 44" High
‐ The 16" at the rear of the chamber will be utilized for the top mounted installation of heaters, mixing motor, level switches and fill port. This allows for easy maintenance of these items from the rear of the system without the need to drain cleaning solution. This also keeps the minimum number of connections below solution level to minimize risk of solution leaks and drips.
‐ Two 9KW SST over the side Immersion Heaters w/ Digital Temperature Controller
‐ Top mounted mixing motor with stainless steel shaft and propeller
• Shaft and propeller located at the middle rear of the tank and includes guarding to protect parts from interacting with the propeller
‐ Stainless steel, 2‐piece hinged, bi‐folding lid
‐ Stainless steel drain valve
‐ Level switches and a fresh water inlet solenoid valve
NEMA Type 12 Control/Generator Enclosure
‐ Free standing enclosure with closed‐loop air conditioner to house generator assemblies, electrical control components and operator controls for all system functions. Includes controls for Tanks 3 through 5 as well as racking and wiring for potential future addition of 10,000W of ultrasonic generator boards
‐ Dimensions: 23" x 87" x 83" High
‐ Electrical Power: 480V Three Phase
• includes 45KVA transformer for powering ultrasonic generators
‐ Electrical Components:
• (5) Generator assemblies containing (20) 500W rack‐mounted modules
• (1) 20000 BTU closed‐loop air conditioner
• (1) Flange mount disconnect
• (1) 24 hour, 7 day timer for automatic heater activation
• All associated electrical control components
‐ Operator Controls:
• (1) Main power switch
• (40) Indicator lights
Upon award of an order, manufacturer shall submit copies of shop drawings for approval prior to fabrication.
Required Warranty: minimum 20 years on tanks, ultrasonic transducers & diaphragms
3) Shipping Address:
NASA‐Stennis Space Center
Building 9166
SSC, MS 39529
4) Delivery date: desired to have system delivered within 26 weeks from award