SUBCONTRACTING_PERCENTAGE_WORKSHEET.doc
DOC document 31 KB Posted
- Attached to
- Linguist Support Services (LSS)
- Solicitation number
- SAQMMA12R0316
About this file
Attachment b in WORD File
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAQMMA12R0316_(Amend_3)_2012-09-19).docx | DOCX document | |
| Amendment003_SF30.pdf | ||
| attachment_c.docx | DOCX document | |
| Amendment003_QA.docx | DOCX document | |
| Amendment002.pdf | ||
| 09_14_2012_QA.docx | DOCX document | |
| SAQMMA12R0316_1.docx | DOCX document | |
| SAQMMA12R0316A001.pdf | ||
| SAQMMA12R0316.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBCONTRACTING PERCENTAGE WORKSHEET
PRIME CONTRACTOR:___________________ SOURCE:_________________
SUBCONTRACTOR:______________________ SOURCE:_________________
| PRIME CONTRACTOR |
| SUBCONTRACTOR |
| DIRECT LABOR |
| $ |
| $ |
| FRINGE BENEFITS* |
| $ |
| $ |
| SUBTOTAL |
| (A) $ |
| (B) s |
LABOR G&A
| $ |
| $ |
| TOTAL LABOR COSTS |
| (C) s |
| (D) $ |
To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the contractor in space (A) and for the subcontractor (if available)** in space (B).
Next, calculate LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in (A).
Calculate the subcontractor LABOR G&A by multiplying the subcontractor’s G&A rate by the subcontractor’s SUBTOTAL figure in (B).
Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.
Now using the formula below, calculate the subcontracting labor percentage.
(D) [(C) + (D)]
SUBCONTRACTING LABOR COST PERCENTAGE = __________________%
* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 32.205-6. Failure to do so will cause the entire overhead to be eliminated from the computations.
** You need to be comparing as like figures as possible. Therefore, if you have a breakdown of the subcontractor’s costs, use it in the formulation above. If you do not have a breakdown, you must use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still break down the contractor’s costs.
File details come from the government source that posted it. Updated .