SUBCONTRACTING_PERCENTAGE_WORKSHEET.doc

DOC document 31 KB Posted

Attached to
Linguist Support Services (LSS)
Solicitation number
SAQMMA12R0316
Issued by

About this file

Attachment b in WORD File

View the file

Other files

File Type Posted
SAQMMA12R0316_(Amend_3)_2012-09-19).docx DOCX document
Amendment003_SF30.pdf PDF
attachment_c.docx DOCX document
Amendment003_QA.docx DOCX document
Amendment002.pdf PDF
09_14_2012_QA.docx DOCX document
SAQMMA12R0316_1.docx DOCX document
SAQMMA12R0316A001.pdf PDF
SAQMMA12R0316.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBCONTRACTING PERCENTAGE WORKSHEET

PRIME CONTRACTOR:___________________ SOURCE:_________________

SUBCONTRACTOR:______________________ SOURCE:_________________

PRIME CONTRACTOR
SUBCONTRACTOR
DIRECT LABOR
$
$
FRINGE BENEFITS*
$
$
SUBTOTAL
(A) $
(B) s

LABOR G&A

$
$
TOTAL LABOR COSTS
(C) s
(D) $

To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the contractor in space (A) and for the subcontractor (if available)** in space (B).

Next, calculate LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in (A).

Calculate the subcontractor LABOR G&A by multiplying the subcontractor’s G&A rate by the subcontractor’s SUBTOTAL figure in (B).

Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.

Now using the formula below, calculate the subcontracting labor percentage.

(D) [(C) + (D)]

SUBCONTRACTING LABOR COST PERCENTAGE = __________________%

* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 32.205-6. Failure to do so will cause the entire overhead to be eliminated from the computations.

** You need to be comparing as like figures as possible. Therefore, if you have a breakdown of the subcontractor’s costs, use it in the formulation above. If you do not have a breakdown, you must use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still break down the contractor’s costs.

File details come from the government source that posted it. Updated .