Title
| Appendix 1-C.8 Network-Related Work in Progress |
| Diplomatic Security |
| 18-Oct-10 |
Work In Progress
| Work In Progress - Diplomatic Security | |||||||
| Project Name | Project Manager | Location(s) Impacted | Status | Start Date | Planned Implementation Date | Description | Yes/No boxes |
| Enterprise DS Wan Circuit Conversion | DS/CTO - IRM | DS Supported Site(s) | 04 Acquisition | May-09 | Dec-10 | Due to service carrier contract changes, DS must coordinate the conversion of all circuits in DS locations from Verizon to AT&T in cooperation with IRM. | |
| DS Washington Area Site XXX Network / Client Infrastructure Upgrade | DS/CTO - IRM | DS Supported Site(s) | 05 Implementation | Apr-08 | Oct-10 | This project provides Network upgrades for personnel at DS Site XXX. Phase 1 provides improved LAN connectivity, to include redundant circuits. Phase 2 will upgrade client workstations. | |
| DS Washington Area Site Network Infrastructure Upgrade | DS/CTO - IRM | DS Supported Site(s) | 03 Concept | May-09 | Dec-10 | This project is an upgrade and modernization of the Network Infrastructure at Washington Area Site XXX and Washington Area Site XXX. | |
| DS Washington Area Training Site Network Infrastructure Upgrade | DS/CTO - IRM | DS Supported Site(s) | 03 Concept | May-09 | Dec-10 | This project is an upgrade and modernization of the Network Infrastructure at Washington Area Training Site XXX . | |
| LAN / Client Installation at Secure Site. | DS/CTO - IRM | DS Supported Site(s) | 03 Concept | Mar-09 | TBD | Coordinate and install 5 workstations at Local Secure Site. | |
| Upgrades connectivity to all (FBI) Integrated Automated Fingerprint Identification Systems (IAFIS). (http://www.fbi.gov/hq/cjisd/iafis.htm) | DS/CTO - IRM | DS Supported Site(s) | 03 Concept | Mar-09 | TBD | Update IAFIS network for all Field Offices and required DS Sites. | |
| Site XXX Law Enforcement Connectivity | DS/CTO - IRM | DS Supported Site(s) | 04 Acquisition | Dec-09 | Dec-10 | The North Carolina Site XXX needs an alternative means of connectivity to the local police criminal database. | |
| Partner Student Network (PSN) | DS/CTO - IRM | DS Supported Site(s) | 06 Post Implementation | Feb-09 | TBD | Develop a stand alone network for the training of foreign national law enforcement personnel. | |
| Site XXX LAN Enhancement | DS/CTO - IRM | DS Supported Site(s) | 03 Concept | Mar-09 | Oct-10 | Shared Bureau network performance enhancements to support DS personnel. | |
| Note: As of 09/23/2010, there were 78 Official DS/CTO Projects on the DS books. Many of those projects involve application development outside of this solicitation and /or System Integration and/ or Enterprise Enhancements. The description of those activates are sensitive in nature and are availible for internal review only. |