This document contains specifications for a construction project at Sandusky High School in Sandusky, Michigan. The project, titled the "Sandusky HS Health Office Project", is being issued by the Sandusky Community Schools for construction. The specifications cover various divisions of work including general requirements, existing conditions, concrete, wood and plastics, thermal and moisture protection, openings, finishes, specialties, plumbing, HVAC, and electrical. The project is scheduled for construction with a completion date of December 1, 2023.
The specifications also include details on project alternates, quality requirements, selective demolition, cast-in-place concrete, rough carpentry, and plastic-laminate-clad architectural cabinets. No pricing terms, set asides, incumbent information, funding details, or other salient commercial information is provided in the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications For
Sandusky HS � Health Office
Project Location:
Sandusky High School 191 E. Pinetree Lane Sandusky, MI 48471
Owner
Sandusky Community Schools 191 E. Pinetree Lane, Sandusky, MI 48471
Issued For: Construction Date: December 1, 2023
IDI Project Number
23-084
DIVISION 1 - GENERAL REQUIREMENTS � REFER TO OWNER BID INSTRUCTIONS
012300 Alternates 014000 Quality Requirements
DIVISION 2 � EXISTING CONDITIONS
024119 Selective Demolition
DIVISION 3 � CONCRETE
033000 Cast in Place Concrete
DIVISION 5 � NOT USED
DIVISION 6 � WOOD, PLASTICS AND COMPOSITES
061000 Rough Carpentry
064116 Plastic-Laminate-Clad Architectural Cabinets
DIVISION 7 � THERMAL AND MOISTURE PROTECTION
078413 Penetration Firestopping
079200 Joint Sealants
DIVISION 8 � OPENINGS
081113 Hollow Metal Door Frames
081416 Flush Wood Doors
DIVISION 9 � FINISHES
092216 Non-Structural Metal Framing
092900 Gypsum Board 095100 Acoustical Ceilings
096513 Resilient Base and Accessories 096516 Homogenous Sheet Vinyl Flooring 098500 Sound Transmission Control Materials 099123 Interior Painting
DIVISION 10 � SPECIALTIES
102800 Toilet Accessories
DIVISION 11 � NOT USED
DIVISION 12 � FURNISHINGS
123623.13 Plastic-Laminate Clad Countertops
DIVISION 13-21 (NOT USED)
DIVISION 22 � PLUMBING
220500 Common Work Results for Plumbing
220553 Identification for Plumbing Piping and Equipment
220719 Plumbing Piping Insulation
221116 Domestic Water Piping
221119 Domestic Water Piping Specialties
221316 Sanitary Waste and Vent Piping
224213.13 Commercial Water Closets
224216.13 Commercial Lavatories
224216.16 Commercial Sinks
DIVISION 23 � HEATING, VENTILATING AND AIR CONDITIONING
230100 General Mechanical Provisions
230500 Common Work Results for HVAC
230593 Testing, Adjusting, and Balancing for HVAC
230713 Duct Insulation
233113 Metal Ducts
233300 Air Duct Accessories
233346 Flexible Ducts
233423 HVAC Power Ventilators
233713.13 Air Diffusers
238239.13 Cabinet Unit Heaters
DIVISION 26 � ELECTRICAL
260500 Basic Electrical Requirements 260505 Selective Demolition for Electrical 260519 Low-Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Support for Electrical Systems 260533 Raceway and Boxes for Electrical Systems 260553 Identification for Electrical Systems 262726 Wiring Devices 265100 Interior Lighting
DIVISION 27 � 33 NOT USED
END OF TABLE OF CONTENTS
SECTION 012300
ALTERNATES
012300 - 1
SECTION 012300
ALTERNATES
PART 1 - GENERAL
1.1 SUMMARY
1. Section includes administrative and procedural requirements for alternates.
1.2 DEFINITIONS
1. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if the
Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
1. Alternates described in this Section are part of the Work only if enumerated in the
Agreement.
2. The cost or credit for each alternate is the net addition to or deduction from the Contract
Sum to incorporate alternates into the Work. No other adjustments are made to the
Contract Sum.
1.3 PROCEDURES
1. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
2. Execute accepted alternates under the same conditions as other work of the Contract.
3. Schedule: A schedule of alternates is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.
SECTION 012300
ALTERNATES
012300 - 2
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES
1. Alternate No. 1: Conference Room � In Floor Power/Data
1. Base Bid: None
2. Alternate: Provide concrete trenching and in floor power/data in new conference room sas shown.
END OF SECTION 012300
BLANK PAGE
SECTION 014000
QUALITY REQUIREMENTS
QUALITY REQUIREMENTS 014000 - 1
SECTION 014000 - QUALITY REQUIREMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for quality assurance and quality control.
B. Testing and inspection services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract
Document requirements.
1. Specific quality-assurance and quality-control requirements for individual work results are specified in their respective Specification Sections. Requirements in individual Sections may also cover production of standard products.
2. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and quality-control procedures that facilitate compliance with the Contract Document requirements.
3. Requirements for Contractor to provide quality-assurance and quality-control services required by Architect, Owner, Construction Manager, or authorities having jurisdiction are not limited by provisions of this Section.
C. Related Requirements:
1. Section 012100 "Allowances" for testing and inspection allowances.
1.3 DEFINITIONS
A. Experienced: When used with an entity or individual, "experienced," unless otherwise further described, means having successfully completed a minimum of [five] previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.
B. Field Quality-Control Tests and Inspections: Tests and inspections that are performed on-site for installation of the Work and for completed Work.
C. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, subcontractor, or sub-subcontractor, to perform a particular construction operation, including installation, erection, application, assembly, and similar operations.
QUALITY REQUIREMENTS 014000 - 2
1. Use of trade-specific terminology in referring to a Work result does not require that certain construction activities specified apply exclusively to specific trade(s).
D. Mockups: Full-size physical assemblies that are constructed either as freestanding temporary built elements or as part of permanent construction. Mockups are constructed to verify selections made under
Sample submittals; to demonstrate aesthetic effects and qualities of materials and execution; to review coordination, testing, or operation; to show interface between dissimilar materials; and to demonstrate compliance with specified installation tolerances. Mockups are not Samples. Unless otherwise indicated, approved mockups establish the standard by which the Work will be judged.
1. Integrated Exterior Mockups: Mockups of the exterior envelope constructed on-site as as indicated in-place portions of permanent construction, consisting of multiple products, assemblies, and subassemblies, with cutaways enabling inspection of concealed portions of the
Work.
a. Include each system, assembly, component, and part of the exterior wall to be constructed for the Project. Colors of components shall be those selected by the Architect for use in the Project.
2. In-Place Mockups: Mockups constructed on-site in their actual final location as part of permanent construction.
E. Preconstruction Testing: Tests and inspections performed specifically for Project before products and materials are incorporated into the Work, to verify performance or compliance with specified criteria.
Unless otherwise indicated, copies of reports of tests or inspections performed for other than the Project do not meet this definition.
F. Product Tests: Tests and inspections that are performed by a nationally recognized testing laboratory
(NRTL) according to 29 CFR 1910.7, by a testing agency accredited according to NIST's National
Voluntary Laboratory Accreditation Program (NVLAP), or by a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with specified requirements.
G. Source Quality-Control Tests and Inspections: Tests and inspections that are performed at the source
(e.g., plant, mill, factory, or shop).
H. Testing Agency: An entity engaged to perform specific tests, inspections, or both. The term "testing laboratory" shall have the same meaning as the term "testing agency."
I. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work, to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.
J. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work, to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Contractor's quality-control services do not include contract administration activities performed by Architect or Construction Manager.
QUALITY REQUIREMENTS 014000 - 3
1.4 DELEGATED-DESIGN SERVICES
A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated.
1. If criteria indicated are not sufficient to perform services or certification required, submit a written request for additional information to Architect.
B. Delegated-Design Services Statement: Submit a statement signed and sealed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified by a design professional, indicating that the products and systems are in compliance with performance and design criteria indicated. Include list of codes, loads, and other factors used in performing these services.
1.5 CONFLICTING REQUIREMENTS
A. Conflicting Standards and Other Requirements: If compliance with two or more standards or requirements is specified and the standards or requirements establish different or conflicting requirements for minimum quantities or quality levels, inform the Architect regarding the conflict and obtain clarification prior to proceeding with the Work. Refer conflicting requirements that are different, but apparently equal, to Architect for clarification before proceeding.
B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Architect for a decision before proceeding.
1.6 INFORMATIONAL SUBMITTALS
A. Contractor's Quality-Control Plan: For quality-assurance and quality-control activities and responsibilities.
B. Qualification Data: For Contractor's quality-control personnel.
C. Contractor's Statement of Responsibility: When required by authorities having jurisdiction, submit copy of written statement of responsibility submitted to authorities having jurisdiction before starting work on the following systems:
1. Seismic-force-resisting system, designated seismic system, or component listed in the Statement of Special Inspections.
2. Primary wind-force-resisting system or a wind-resisting component listed in the Statement of
Special Inspections.
QUALITY REQUIREMENTS 014000 - 4
D. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority.
E. Schedule of Tests and Inspections: Prepare in tabular form and include the following:
1. Specification Section number and title.
2. Entity responsible for performing tests and inspections.
3. Description of test and inspection.
4. Identification of applicable standards.
5. Identification of test and inspection methods.
6. Number of tests and inspections required.
7. Time schedule or time span for tests and inspections.
8. Requirements for obtaining samples.
9. Unique characteristics of each quality-control service.
F. Reports: Prepare and submit certified written reports and documents as specified.
G. Permits, Licenses, and Certificates: For Owner's record, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents established for compliance with standards and regulations bearing on performance of the Work.
1.7 CONTRACTOR'S QUALITY-CONTROL PLAN
A. Quality-Control Plan, General: Submit quality-control plan within 10 days of Notice to Proceed, and not less than five days prior to preconstruction conference. Submit in format acceptable to Architect.
Identify personnel, procedures, controls, instructions, tests, records, and forms to be used to carry out
Contractor's quality-assurance and quality-control responsibilities and to coordinate Owner's quality-assurance and quality-control activities. Coordinate with Contractor's Construction Schedule.
B. Quality-Control Personnel Qualifications: Engage qualified personnel trained and experienced in managing and executing quality-assurance and quality-control procedures similar in nature and extent to those required for Project.
C. Submittal Procedure: Describe procedures for ensuring compliance with requirements through review and management of submittal process. Indicate qualifications of personnel responsible for submittal review.
D. Testing and Inspection: In quality-control plan, include a comprehensive schedule of Work requiring testing or inspection, including the following:
1. Contractor-performed tests and inspections, including subcontractor-performed tests and inspections. Include required tests and inspections and Contractor-elected tests and inspections.
Distinguish source quality-control tests and inspections from field quality-control tests and inspections.
2. Special inspections required by authorities having jurisdiction and indicated on the Statement of
Special Inspections.
3. Owner-performed tests and inspections indicated in the Contract Documents.
QUALITY REQUIREMENTS 014000 - 5
E. Continuous Inspection of Workmanship: Describe process for continuous inspection during construction to identify and correct deficiencies in workmanship in addition to testing and inspection specified.
Indicate types of corrective actions to be required to bring the Work into compliance with standards of workmanship established by Contract requirements and approved mockups.
F. Monitoring and Documentation: Maintain testing and inspection reports, including log of approved and rejected results. Include Work Architect has indicated as nonconforming or defective. Indicate corrective actions taken to bring nonconforming Work into compliance with requirements. Comply with requirements of authorities having jurisdiction.
1.8 REPORTS AND DOCUMENTS
A. Test and Inspection Reports: Prepare and submit certified written reports specified in other Sections.
Include the following:
1. Date of issue.
2. Project title and number.
3. Name, address, telephone number, and email address of testing agency.
4. Dates and locations of samples and tests or inspections.
5. Names of individuals making tests and inspections.
6. Description of the Work and test and inspection method.
7. Identification of product and Specification Section.
8. Complete test or inspection data.
9. Test and inspection results and an interpretation of test results.
10. Record of temperature and weather conditions at time of sample-taking and testing and inspection.
11. Comments or professional opinion on whether tested or inspected Work complies with the
Contract Document requirements.
12. Name and signature of laboratory inspector.
13. Recommendations on retesting and reinspecting.
B. Manufacturer's Technical Representative's Field Reports: Prepare written information documenting manufacturer's technical representative's tests and inspections specified in other Sections. Include the following:
1. Name, address, telephone number, and email address of technical representative making report.
2. Statement on condition of substrates and their acceptability for installation of product.
3. Statement that products at Project site comply with requirements.
4. Summary of installation procedures being followed, whether they comply with requirements and, if not, what corrective action was taken.
5. Results of operational and other tests and a statement of whether observed performance complies with requirements.
6. Statement of whether conditions, products, and installation will affect warranty.
7. Other required items indicated in individual Specification Sections.
C. Factory-Authorized Service Representative's Reports: Prepare written information documenting manufacturer's factory-authorized service representative's tests and inspections specified in other
Sections. Include the following:
QUALITY REQUIREMENTS 014000 - 6
1. Name, address, telephone number, and email address of factory-authorized service representative making report.
2. Statement that equipment complies with requirements.
3. Results of operational and other tests and a statement of whether observed performance complies with requirements.
4. Statement of whether conditions, products, and installation will affect warranty.
5. Other required items indicated in individual Specification Sections.
1.9 QUALITY ASSURANCE
A. Qualifications paragraphs in this article establish the minimum qualification levels required; individual
Specification Sections specify additional requirements.
B. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units. As applicable, procure products from manufacturers able to meet qualification requirements, warranty requirements, and technical or factory-authorized service representative requirements.
C. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this
Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.
D. Installer Qualifications: A firm or individual experienced in installing, erecting, applying, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.
E. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of the system, assembly, or product that is similar in material, design, and extent to those indicated for this Project.
F. Specialists: Certain Specification Sections require that specific construction activities shall be performed by entities who are recognized experts in those operations. Specialists shall satisfy qualification requirements indicated and shall be engaged in the activities indicated.
1. Requirements of authorities having jurisdiction shall supersede requirements for specialists.
G. Testing and Inspecting Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspection indicated, as documented in accordance with ASTM E329, and with additional qualifications specified in individual Sections; and, where required by authorities having jurisdiction, that is acceptable to authorities.
H. Manufacturer's Technical Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to observe and inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.
QUALITY REQUIREMENTS 014000 - 7
I. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect, demonstrate, repair, and perform service on installations of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.
J. Preconstruction Testing: Where testing agency is indicated to perform preconstruction testing for compliance with specified requirements for performance and test methods, comply with the following
Contractor's responsibilities, including the following:
1. Provide test specimens representative of proposed products and construction.
2. Submit specimens in a timely manner with sufficient time for testing and analyzing results to prevent delaying the Work.
3. Provide sizes and configurations of test assemblies, mockups, and laboratory mockups to adequately demonstrate capability of products to comply with performance requirements.
4. Build site-assembled test assemblies and mockups, using installers who will perform same tasks for Project.
5. Build laboratory mockups at testing facility, using personnel, products, and methods of construction indicated for the completed Work.
6. Testing Agency Responsibilities: Submit a certified written report of each test, inspection, and similar quality-assurance service to Architect and Commissioning Authority, through
Construction Manager, with copy to Contractor. Interpret tests and inspections, and state in each report whether tested and inspected Work complies with or deviates from the Contract
Documents.
K. Mockups: Before installing portions of the Work requiring mockups, build mockups for each form of construction and finish required to comply with the following requirements, using materials indicated for the completed Work:
1. Build mockups of size indicated.
2. Build mockups in location indicated or, if not indicated, as directed by Architect or Construction
Manager.
3. Notify Architect and Construction Manager [seven] days in advance of dates and times when mockups will be constructed.
4. Employ supervisory personnel who will oversee mockup construction. Employ workers who will be employed to perform same tasks during the construction at Project.
5. Demonstrate the proposed range of aesthetic effects and workmanship.
6. Obtain Construction Manager's approval of mockups before starting corresponding Work, fabrication, or construction.
a. Allow seven days for initial review and each re-review of each mockup.
7. Promptly correct unsatisfactory conditions noted by Architect's preliminary review, to the satisfaction of the Architect, before completion of final mockup.
8. Approval of mockups by the Architect does not constitute approval of deviations from the
Contract Documents contained in mockups unless Architect specifically approves such deviations in writing.
9. Maintain mockups during construction in an undisturbed condition as a standard for judging the completed Work.
10. Demolish and remove mockups when directed unless otherwise indicated.
QUALITY REQUIREMENTS 014000 - 8
L. Integrated Exterior Mockups: Construct integrated exterior mockup according to approved Shop
Drawings. Coordinate installation of exterior envelope materials and products for which mockups are required in individual Specification Sections, along with supporting materials. Comply with requirements in "Mockups" Paragraph.
1. Coordinate construction of the mockup to allow observation of air barrier installation, flashings, air barrier integration with fenestration systems, and other portions of the building air/moisture barrier and drainage assemblies, prior to installation of veneer, cladding elements, and other components that will obscure the work.
M. Laboratory Mockups: Comply with requirements of preconstruction testing and those specified in individual Specification Sections.
1.10 QUALITY CONTROL
A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility, Owner will engage a qualified testing agency to perform these services.
1. Owner will furnish Contractor with names, addresses, and telephone numbers of testing agencies engaged and a description of types of testing and inspection they are engaged to perform.
2. Payment for these services will be made from testing and inspection allowances specified in
Section 012100 "Allowances," as authorized by Change Orders.
3. Costs for retesting and reinspecting construction that replaces or is necessitated by Work that failed to comply with the Contract Documents will be charged to Contractor.
B. Contractor Responsibilities: Tests and inspections not explicitly assigned to Owner are Contractor's responsibility. Perform additional quality-control activities, whether specified or not, to verify and document that the Work complies with requirements.
1. Unless otherwise indicated, provide quality-control services specified and those required by authorities having jurisdiction. Perform quality-control services required of Contractor by authorities having jurisdiction, whether specified or not.
2. Engage a qualified testing agency to perform quality-control services.
a. Contractor shall not employ same entity engaged by Owner, unless agreed to in writing by
Owner.
3. Notify testing agencies at least [24] hours in advance of time when Work that requires testing or inspection will be performed.
4. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service.
5. Testing and inspection requested by Contractor and not required by the Contract Documents are
Contractor's responsibility.
6. Submit additional copies of each written report directly to authorities having jurisdiction, when they so direct.
C. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Contract Documents.
QUALITY REQUIREMENTS 014000 - 9
D. Testing Agency Responsibilities: Cooperate with Architect, Construction Manager, and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.
1. Notify Architect, Construction Manager, and Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services.
2. Determine the locations from which test samples will be taken and in which in-situ tests are conducted.
3. Conduct and interpret tests and inspections, and state in each report whether tested and inspected
Work complies with or deviates from requirements.
4. Submit a certified written report, in duplicate, of each test, inspection, and similar quality-control service through Contractor.
5. Do not release, revoke, alter, or increase the Contract Document requirements or approve or accept any portion of the Work.
6. Do not perform duties of Contractor.
E. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections. Report results in writing as specified in Section 013300 "Submittal Procedures."
F. Manufacturer's Technical Services: Where indicated, engage a manufacturer's technical representative to observe and inspect the Work. Manufacturer's technical representative's services include participation in preinstallation conferences, examination of substrates and conditions, verification of materials, observation of Installer activities, inspection of completed portions of the Work, and submittal of written reports.
G. Contractor's Associated Requirements and Services: Cooperate with agencies and representatives performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following:
1. Access to the Work.
2. Incidental labor and facilities necessary to facilitate tests and inspections.
3. Adequate quantities of representative samples of materials that require testing and inspection.
Assist agency in obtaining samples.
4. Facilities for storage and field curing of test samples.
5. Delivery of samples to testing agencies.
6. Preliminary design mix proposed for use for material mixes that require control by testing agency.
7. Security and protection for samples and for testing and inspection equipment at Project site.
H. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and quality-control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspection.
1. Schedule times for tests, inspections, obtaining samples, and similar activities.
I. Schedule of Tests and Inspections: Prepare a schedule of tests, inspections, and similar quality-control services required by the Contract Documents as a component of Contractor's quality-control plan.
Coordinate and submit concurrently with Contractor's Construction Schedule. Update and submit with each Application for Payment.
QUALITY REQUIREMENTS 014000 - 10
1. Schedule Contents: Include tests, inspections, and quality-control services, including Contractor-and Owner-retained services, commissioning activities, and other Project-required services paid for by other entities.
2. Distribution: Distribute schedule to Owner, Architect, Construction Manager, testing agencies, and each party involved in performance of portions of the Work where tests and inspections are required.
1.11 SPECIAL TESTS AND INSPECTIONS
A. Special Tests and Inspections: Owner will engage a qualified testing agency to conduct special tests and inspections required by authorities having jurisdiction as the responsibility of Owner, as indicated in the
Statement of Special Inspections attached to this Section, and as follows:
1. Verifying that manufacturer maintains detailed fabrication and quality-control procedures, and reviewing the completeness and adequacy of those procedures to perform the Work.
2. Notifying Architect, Construction Manager, and Contractor promptly of irregularities and deficiencies observed in the Work during performance of its services.
3. Submitting a certified written report of each test, inspection, and similar quality-control service to
Architect through Construction Manager, with copy to Contractor and to authorities having jurisdiction.
4. Submitting a final report of special tests and inspections at Substantial Completion, which includes a list of unresolved deficiencies.
5. Interpreting tests and inspections, and stating in each report whether tested and inspected Work complies with or deviates from the Contract Documents.
6. Retesting and reinspecting corrected Work.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 TEST AND INSPECTION LOG
A. Test and Inspection Log: Prepare a record of tests and inspections. Include the following:
1. Date test or inspection was conducted.
2. Description of the Work tested or inspected.
3. Date test or inspection results were transmitted to Architect.
4. Identification of testing agency or special inspector conducting test or inspection.
B. Maintain log at Project site. Post changes and revisions as they occur. Provide access to test and inspection log for Architect's and Construction Manager's and authorities' having jurisdiction reference during normal working hours.
QUALITY REQUIREMENTS 014000 - 11
1. Submit log at Project closeout as part of Project Record Documents.
3.2 REPAIR AND PROTECTION
A. General: On completion of testing, inspection, sample-taking, and similar services, repair damaged construction and restore substrates and finishes.
1. Provide materials and comply with installation requirements specified in other Specification
Sections or matching existing substrates and finishes. Restore patched areas and extend restoration into adjoining areas with durable seams that are as invisible as possible. Comply with the Contract Document requirements for cutting and patching in Section 017300 "Execution."
B. Protect construction exposed by or for quality-control service activities.
C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.
END OF SECTION 014000
QUALITY REQUIREMENTS 014000 - 12
SECTION 024119 -
SELECTIVE DEMOLITION
024119 - 1
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Demolition and removal of selected site elements.
3. Salvage of existing items to be reused or recycled.
1.2 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
1.3 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Storage or sale of removed items or materials on-site is not permitted.
E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
F. Arrange selective demolition schedule so as not to interfere with Owner's operations.
PART 2 - EXECUTION
2.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Inventory and record the condition of items to be removed and salvaged.
024119 - 2
2.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Owner will arrange to shut off indicated services/systems when requested by Contractor.
2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
3. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Equipment to Be Removed: Disconnect and cap services and remove equipment.
c. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
d. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.
2.3 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
C. Remove temporary barricades and protections where hazards no longer exist.
2.4 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
024119 - 3
3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
4. Maintain fire watch during and for at least 1 hours after flame-cutting operations.
5. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
6. Dispose of demolished items and materials promptly. Comply with requirements in
Section 017419 "Construction Waste Management and Disposal."
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area designated by Owner .
5. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
2.5 CLEANING
A. Remove demolition waste materials from Project site and recycle or dispose of them according to Section 017419 "Construction Waste Management and Disposal."
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
4. Comply with requirements specified in Section 017419 "Construction Waste
Management and Disposal."
B. Burning: Do not burn demolished materials.
024119 - 4
C. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 024119
CAST-IN-PLACE CONCRETE
033000 - 1
SECTION 033000
CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Cast-in-place concrete, including concrete materials, mixture design, placement procedures, and finishes.
1.2 REFERENCES
A. ACI 301 Specifications for Structural Concrete for Buildings.
B. ACI 305 Hot Weather Concreting.
C. ACI 306.1 Standard Specification for Cold Weather Concreting.
D. ACI 318 Building Code Requirements for Reinforced Concrete.
E. ANSI/ASTM A185 Welded Wire Fabric for Concrete Reinforcement.
F. ASTM A615 Deformed and Plain Billet Steel for Concrete Reinforcement.
G. ASTM C33 Concrete Aggregates.
H. ASTM C94 Ready Mixed Concrete.
I. ASTM C150 Portland Cement.
J. ASTM C260 Air Entraining Admixtures for Concrete.
K. ASTM C309 Liquid Membrane Forming Compounds for Curing Concrete.
L. ASTM D2103 Polyethylene Film and Sheeting.
1.3 RELATED SECTIONS
A. Section 042200- Masonry: rebar dowels, embedded in foundations, to match masonry wall rebar.
B. Section 051200- Structural Steel: Anchor bolts, embedded in foundations, bearing plates attached to form work.
C. Section 076200- Sheet Metal Flashing and Trim: Flashing reglets attached to formwork.
1.4 ACTION SUBMITTALS
A. Shop Drawings:
1. Construction Joint Layout: Indicate proposed construction joints required to construct the structure and as approved by the Architect.
2. Submit shop drawings of reinforcing steel to Architect for approval prior to fabrication. Submit under provisions established by Construction Manager.
3. Indicate reinforcement sizes, spacings, locations and quantities of reinforcing steel, bending and cutting schedules, and splices.
1.5 INFORMATIONAL SUBMITTALS
A. Material Certificates: For each of the following, signed by manufacturers:
1. Cementitious materials.
2. Admixtures.
3. Vapor retarders.
4. Joint-filler strips.
033000 - 2
B. Material Test Reports: For the following, from a qualified testing agency:
1. Portland cement.
2. Fly ash.
3. Aggregates.
4. Admixtures:
C. Field quality-control reports.
1.6 QUALITY ASSURANCE
A. Perform work in accordance with ACI 301, ACI 305, ACI 306.1, and ACI 318.
B. Maintain copies of ACI 301, 305, 306.1, and 318 on site.
C. In the ACI publications, consider advisory provisions mandatory, as though the word
�shall� had been substituted for �should� wherever �should� appears.
D. For conflicts in the provisions of the ACI publications, ACI 301 shall govern. For any conflicts between the ACI publications and this specification, this specification shall govern.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Comply with ASTM C94/C94M and ACI 301.
1.8 FIELD CONDITIONS
A. Cold-Weather Placement: Comply with ACI 301 and ACI 306.1.
PART 2 - PRODUCTS
2.1 CONCRETE, GENERAL
A. ACI Publications: Comply with ACI 301 unless modified by requirements in the Contract Documents.
2.2 FORM MATERIALS
A. Conform to ACI 301.
B. Plywood forms: APA B-B Plyform Class I sound undamaged sheets.
C. Lumber: spruce-pine-fir #2 or better; with grade stamp clearly visible.
D. Steel Forms: Minimum thickness to support weight of concrete with minimum deflection.
E. Form Ties: removable or snap-off metal, of fixed or adjustable length.
2.3 REINFORCING STEEL
A. Reinforcing Steel: ASTM A615, 60 ksi yield grade billet steel deformed bars, uncoated finish.
B. Welded Wire Fabric: Plain type, ANSI/ASTM A185; in flat sheets; uncoated finish.
2.4 CONCRETE MATERIALS
A. Cementitious Materials:
1. Portland Cement: ASTM C150/C150M, Type I.
2. Fly Ash: ASTM C618, Class C or F.
3. Slag Cement: ASTM C989/C989M, Grade 100 or 120.
033000 - 3
B. Normal-Weight Aggregates: ASTM C33/C33M, Class 3M coarse aggregate or better, graded. Provide aggregates from a single source.
C. Water and Water Used to Make Ice: ASTM C94/C94M, potable
2.5 VAPOR RETARDERS
A. Sheet Vapor Retarder, Class A: ASTM E1745, Class A; thickness as indicated on drawings. Include manufacturer's recommended adhesive or pressure-sensitive tape.
2.6 CONCRETE MIXTURES, GENERAL
A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, in accordance with ACI 301.
1. Use a qualified testing agency for preparing and reporting proposed mixture designs, based on laboratory trial mixtures.
B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:
1. Fly Ash or Other Pozzolans: 25 percent by mass.
2. Total of Fly Ash or Other Pozzolans, Slag Cement: 50 percent by mass, with fly ash or pozzolans not exceeding 25 percent by mass.
3. Total of Fly Ash or Other Pozzolans: 35 percent by mass with fly ash or pozzolans not exceeding 25 percent by mass.
C. Admixtures: Use admixtures in accordance with manufacturer's written instructions.
1. Use admixture in concrete, as required, for placement and workability.
D. WVRA: ASTM C 494/C 494M, Type S; complex catalyzed hydrous silicate, water and vapor proofing liquid admixture.
1. Basis-of-Design Product: Subject to compliance with requirements, provide, Specialty
Products Group; Vapor Lock 20/20� or comparable product by one of the following:
a. Concure.
b. Moxie International.
2. Properties:
a. W/C Ratio: Maximum 0.52 without written permission and approval of mix design by WVRA manufacturer.
b. W/C Ratio: Minimum 0.42 without written permission and approval of mix design by WVRA manufacturer.
c. Water Seepage or Permeability: Not to exceed 2.0 x 10-9 ft/s (6 x 10-8 cm/s) according to ASTM D 5084.
d. Internal Wet Curing: Additional curing is unnecessary when using WVRA admixtures, except during hot or cold weather concreting conditions; follow ACI 306.1 and ACI 301
3. Warranty:
a. Design mixture containing a WVRA must be approved in writing by WVRA manufacturer.
b. Installer shall be WVRA certified.
c. Cylinder Testing: Testing agency or WVRA manufacturer to obtain concrete cylinder from mockup and test at testing agency specified by WVRA manufacturer according to ASTM D 5084.
Cost of test shall be borne by WVRA manufacturer.
d. Manufacturer's Warranty: WVRA admixture manufacturer agrees to repair, replace or re-apply damaged floor covering or
033000 - 4 adhesive, surface treatment, coating or paint materials that fail within specified warranty period.
(1) Failures include, but are not limited to, proven claims made on any floor covering or adhesive, surface treatment, coating or paint that sustains damage due to moisture vapor migration or alkali efflorescence attack, which had migrated through concrete, and includes blistering, peeling, leakage, seepage, or absorption of moisture, petroleum, sulfides, or acids.
(2) Warranty does not apply to, or cover, the following:
(a) Water vapor migration moving laterally under a floor covering originating from external sources such as drains or broken pipes.
(b) Structural cracks or damage or conditions caused by neglect, abuse, acts of God or nature; other materials and/or conditions resulting from inferior application or workmanship or design, whether intentional or not; or situations beyond its control.
(c) Liquidated, incidental and/or consequential damages or for contribution or indemnity.
(3) Material Warranty Period: 10 years from date of Substantial Completion
(4) Third-Party Labor and Material Insurance:
(5) Liability insurance purchased by WVRA manufacturer (the first party) from a legitimate insurer (the second party) for protection against the claims of end-user and all stakeholders in Project (the third) party.
(a) Coverage Amount: $20 million dollars U.S.
4. Do not apply any Liquid Floor Treatment Applications to concrete that contains WVRA admixture. The addition of the WVRA removes all required Liquid Floor Treatment applications from construction documents.
5. Inspections: For concrete containing WVRA admixture provide the following:
a. Moisture Testing: Conducted by WVRA manufacturer or appointed representative prior to installation of moisture sensitive coatings and adhesives. No other moisture testing by installers is required.
b. Bond Testing: Conducted by WVRA manufacturer or appointed representative on moisture sensitive materials installed by Contractor.
c. Ph Testing: Conducted by WVRA manufacturer or appointed representative.
d. Report test results in writing to Architect and Contractor within 48 hours of testing.
e. Authorization to proceed with installation of moisture sensitive coatings and materials must be obtained in writing from WVRA manufacturer.
E. WVRA Testing: ASTM D 5084; 4- by 8-inch cylinder size obtained by WVRA manufacturer or appointed representative.
2.7 ACCESSORIES
A. Bonding Agent: ASTM C932.
B. Vapor Barrier: ASTM D2103, 6 mil thick clear polyethylene film.
C. Non-Shrink Grout: Premixed compound with non-metallic aggregate, cement, water reducing and plasticizing agents; capable of minimum compressive strength of 4000 psi.
D. Drilled in Concrete Anchors (DCA�s). Provide stainless steel or galvanized to F185 coating per ASTM A153 for DCA�s in contact with preservative treated wood.
033000 - 5
E. Flashing Reglets: Galvanized steel; longest possible lengths; alignment splines for joints;
securable to formwork.
F. Construction Joints: 2�x2� key, formed with prefabbed galvanized steel or wood forms.
G. Expansion Joints: ½� wide with bituminous impregnated fiberboard filler conform to
ANSI/ASTM D994.
H. Form Release Agent: Colorless material which will not stain concrete, absorb moisture, or impair natural bonding or color characteristics of coating intended for use on concrete.
2.8 CURING MATERIALS
A. Water: Clean and drinkable.
B. Membrane Curing Compound: ASTM C309 C. Polyethelene Film: ASTM D2103, 4 mil thick, clear color.
D. Sealer: BASF Kure and Seal 30, or equal, at exposed concrete floor areas. Coordinate with architectural finish schedule.
2.9 CONCRETE MIXTURES
A. Class A: Normal-weight concrete used for footings, grade beams, and tie beams.
1.…