Sample_Fee_Proposal.pdf
PDF 2 MB Posted
- Attached to
- Construction Management and Inspection Services for Hazel Avenue Interchange Project, Segment 1
- Solicitation number
- 81820
- Issued by
- Sacramento County, San Francisco City, California
About this file
This is a sample cost proposal template document for state and local contracts related to geotechnical and material testing services, applicable to Sacramento County, California's Construction Management and Inspection Division. The template is designed for cost-per-unit-of-work contracts and requires bidders to provide detailed cost breakdowns organized by unit or item of work. Bidders must itemize direct labor costs by employee classification (professional and sub-professional/technical staff), identify key personnel with asterisks, mark prevailing wage-subject employees with double asterisks, and include equipment costs with operators. The document requires separate cost proposals from subconsultants and permits itemization of other direct costs (ODC) such as mileage, equipment rental, supplies, permit fees, plan sheets, and testing costs, provided such costs are supported by historical data and documentation. The template explicitly prohibits cost proposal format amendments and prohibits markups on costs.
All cost proposals must comply with Generally Accepted Accounting Principles (GAAP), federal cost principles under Title 23 United States Code Section 112, 48 CFR Part 31, 23 CFR Part 172, and 48 CFR Part 9904 (Cost Accounting Standards Board when applicable). Hourly billing rates must reflect prevailing wage requirements, be actual and reasonable, and be consistent with rates publicly advertised to all client types. ODC items categorized as "tools of the trade" are not reimbursable. The certifying official must be an executive or financial officer at the vice president level or equivalent with authority to represent the financial information. All costs must be applied consistently and fairly across contracts, with supporting documentation retained in project files and in compliance with applicable federal and state requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att_4_Proprietary_Agreement.pdf | ||
| Att_3_Standard_Consulting_Contract_Agreement.pdf | ||
| Att_1_and_2_Hazel-50_RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAMPLE COST PROPOSAL 3
SAMPLE COST PROPOSAL
Sample Only - Required Cost Proposal Template To Be Determined By Agency
COST PER UNIT OF WORK CONTRACTS
(GEOTECHNICAL AND MATERIAL TESTING)
Note: Mark-ups are Not Allowed □ Prime Consultant □ Subconsultant □ 2nd Tier Subconsultant
Consultant __________________ _
Project No. _________ _ Contract No.
Date
Unit/Item of Work:
(Example: Log of Test Boring for Soils Report, or ADL Testing for Hazardous Waste Material Study} Include as many Items as necessary.
DIRECT LABOR Hours Billing Hourly Rate {$) Total{$)
Professional {Classification)*
Sub-professional/Technical**
EQUIPMENT 1 {with Operator)
EQUIPMENT 2 {with Operator)
Consultant's Other Direct Costs (ODC)- Itemize:
Description of Item Quantity Unit Unit Cost Total
Subconsultant 1:
Subconsultant 2:
Subconsultant 3:
Subconsultant 4:
Subconsultant 5:
Nole: Attach addtllonal pages if necessary.
TOTAL COST PER UNIT OF WORK
NOTES:
1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**) . All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. The cost proposal format shall not be amended.
2. Hourly billing rates should include prevailing wage rates and be consistent with publicly advertised rates charged to all clients (Commercial, Private or Public).
3. Mobilization/De-mobilization is based on site location and number and frequency of tests/items.
4. ODC items shall be based on actual costs and supported by historical data and other documentation.
5. ODC items that would be considered "tools of the trade' are not reimbursable.
6. Billing Hourly Rates must be actual, allowable, and reasonable.
SAMPLE COST PROPOSAL
Sample Only - Required Cost Proposal Template To Be Determined By Agency
SAMPLE COST PROPOSAL 3
Certification of Direct Costs:
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal{s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:
13. Generally Accepted Accounting Principles {GAAP)
14. Terms and conditions of the contract
15. Title 23 United States Code Section 112 - Letting of Contracts
16. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
17. 23 Code of Federal Regulations Part 172 - Procurement, Management, and
Administration of Engineering and Design Related Service
18. 48 Code of Federal Regulation Part 9904 - Cost Accounting Standards Board {when applicable)
All costs must be applied consistently and fair1y to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements.
Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.
Prime Consultant or Subconsultant Certifying:
Name:_______________ Title*: _______________
Signature: _____________ _ Date of Certification {mm/dd/yyyy...._ : __
Email: _______________ Phone Number,_,_: _ _ _ _ _ _ _ _ _ _
Address:
* An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
List services the consultant is providinq under the proposed contract:
https://www.gpo.gov/fdsys/pkg/USCODE-2011-title23/pdf/USCODE-2011-title23-chap1-sec112.pdf http://www.ecfr.gov/cgi-bin/text-idx?SID=7d7984e723af183358e1cb797a78877f&mc=true&node=sp48.1.31.31_12&rgn=div6 http://www.ecfr.gov/cgi-bin/text-idx?rgn=div5&node=23:1.0.1.2.3 https://www.gpo.gov/fdsys/pkg/CFR-2010-title48-vol7/xml/CFR-2010-title48-vol7-part9904.xml
| H3C3: |
| H3PC3: Off |
| H3Sc3: Off |
| 2TS3: Off |
| H3D3: |
| H3CN3: |
| H3PN3: |
| DL3: |
| DL2: |
| DL1: |
| DL6: |
| DL5: |
| DL4: |
| DL9: |
| DL8: |
| DL7: |
| DL12: |
| DL11: |
| DL10: |
| H3I1: Mileage Costs |
| H3Q1: |
| H3U1: |
| H3UC1: |
| H3T1: 0 |
| H3I2: Equipment Rental and Supplies |
| H3Q2: |
| H3U2: |
| H3UC2: |
| H3T2: 0 |
| H3I3: Permit Fees |
| H3Q3: |
| H3U3: |
| H3UC3: |
| H3T3: 0 |
| H3I4: Plan Sheets |
| H3Q4: |
| H3U4: |
| H3UC4: |
| H3T4: 0 |
| H3I5: Test |
| H3Q5: |
| H3U5: |
| H3UC5: |
| H3T5: 0 |
| H3S1: |
| H3SC1: |
| H3S2: |
| H3SC2: |
| H3S3: |
| H3SC3: |
| H3S4: |
| H3SC4: |
| H3S5: |
| H3SC5: |
| TCPUOW: |
| T3: 0 |
| N3: |
| DOC3: |
| PN3: |
| Email3: |
| Addr3: |
| LS3: |
File details come from the government source that posted it. Updated .