Att_1_and_2_Hazel-50_RFP.pdf
PDF 918 KB Posted
- Attached to
- Construction Management and Inspection Services for Hazel Avenue Interchange Project, Segment 1
- Solicitation number
- 81820
- Issued by
- Sacramento County, San Francisco City, California
About this file
Summary
This is a Request for Proposals (RFP) issued by the Construction Management and Inspection Division (CMID) of the Community Development Department of Sacramento County, California, for construction management, inspection, and quality assurance services on the Hazel Avenue at US 50 Interchange Improvement Project—Segment 1. The project involves bridge construction, including widening the Hazel Avenue overcrossing of US Highway 50, modifying westbound on and off ramps to incorporate a shared-use path, constructing a retaining wall at the eastbound loop on ramp, and widening US Highway 50 to add an eastbound auxiliary lane. The underlying construction contract in the amount of $22,486,419.30 is anticipated to be awarded to O.C. Jones & Sons, Inc., by the County's Board of Supervisors on December 15, 2026. The construction contract duration is 360 working days with a Notice to Proceed anticipated in January-February 2027, and close-out activities could last several months after field acceptance. The RFP was published November 18, 2026, with specific submission deadlines and timelines available on the OpenGov Procurement project page. Proposals must be submitted via the OpenGov Procurement portal, and shortlisted firms will be invited to in-person interviews before contract award to the Board of Supervisors.
The selected consultant will provide skilled technical and professional personnel for construction administration, inspection, materials testing, source inspection, and quality assurance under the direction of CMID supervisors. The consultant must have experience with Caltrans projects exceeding $10 million and bridge construction methods, and should be familiar with the Caltrans Local Assistance Program (LAP) and AASHTO Audit Guide requirements. The project is funded by state and local funds only, with no federal funding. Personnel must comply with California prevailing wage requirements under SB 1999 and Labor Code Chapter 1720, and must be registered with the Department of Industrial Relations per SB 854. All Construction Management staff performing inspection, surveying, materials testing, and source inspection work must be paid prevailing wages. Firms currently involved in the project design phase are ineligible to provide personnel on the construction management contract, regardless of organizational separation; this restriction also applies to the engineer of record. No set-asides, DBE program goals, or minority procurement objectives apply, as the DBE program was suspended by Caltrans on October 3, 2025, and the project is not federally funded.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att_4_Proprietary_Agreement.pdf | ||
| Att_3_Standard_Consulting_Contract_Agreement.pdf | ||
| Sample_Fee_Proposal.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Community Services Agency Community Development Department
Request for Proposals
Hazel Avenue at US 50 Interchange Improvement Project - Segment 1 – Construction Management, Inspection, and Quality Assurance Services
RFP publish date: November 18, 2026
Table of Contents 1 Introduction
1.1 Purpose of RFP
1.2 Background
1.3 Scope of services
A. General:
B. Typical Construction Inspection Activities
C. Document Control
D. Typical Construction Contract Administration
2 General Rules
2.1 RFP overview
2.2 Estimated timeline and extension of time
2.3 Proposal format and content (Attachment 2)
2.4 Proposal submission
2.5 Questions and communication
2.6 Addenda
2.7 County’s right to withdraw, cancel, suspend and/or modify RFP
2.8 Proposer’s right to edit or cancel proposal
2.9 Proposals will not be returned
2.10 Public disclosure of proposal documents
2.11 Proposer’s costs
2.12 Proposer’s ideas
2.13 Collusion
2.14 Conflict of interest
3 Evaluation and Selection
3.1 Proposal evaluation and recommendation for selection
3.2 Evaluation of responsiveness
3.3 Evaluation of responsibility
3.4 Evaluation panel and evaluation criteria
3.5 Execution of contract
4 Attachments
Attachment 1 – Location Map Attachment 2 - Proposal Fomat and Content………………………………………………………………17
Attachment 3 – County of Sacramento Standard Consulting Agreement
Refer to Sample Contract available in the Open Gov Portal
Attachment 4 – Written Agreement to Indemnify for Release of Proprietary Information
Attachment 5 – Frequently Asked Questions
Attachment 6 – Overview of Job Descriptions
1 Introduction
1.1 Purpose of RFP
The Construction Management and Inspection Division (CMID) of the Community Development Department of Sacramento County (County), is soliciting proposals for construction support services on the Hazel Avenue at US 50 Interchange Improvement Project – Segment 1 (Project) (see Attachment 1) consisting of construction management, inspection, and quality assurance services to augment and supplement County staff performing similar functions.
1.2 Background
CMID provides construction management and inspection services to Sacramento County’s Departments of Transportation (DOT), Water Resources (DWR), Airports (SCDA), General Services (DGS), Waste Management & Recycling (DWMR), Regional Parks (Parks), as well as the Sacramento County Water Agency (SCWA), Sacramento Area Flood Control Agency (SAFCA), and the Sacramento Area Sewer District (SacSewer).
Services provided by CMID include the following: construction management/administration, construction inspection, offsite source and equipment testing, material testing, progress monitoring, documentation control, change order analysis and negotiations, schedule analysis, contract enforcement, labor compliance, and other related activities.
The Project involves bridge construction, thus consultants responding to this Request For Proposals (RFP) should have experience providing construction management and inspection services on bridge projects. While the Project does not have any federal funding, it is considered an “on-system” project;
therefore, it is preferred that firms have experience providing services for “on-system” transportation projects and are familiar with Caltrans Local Assistance Program (LAP) and its related processes for engineering consultants, procedures and documentation requirements. Proposers should be familiar with the American Association of State Highway and Transportation Officials (AASHTO) Audit Guide as it relates to A&E consultant contracts of $1M or more, as well as the County and State Standard Specifications. More information on LAP requirements can be found at California Department of Transportation Local Programs, Chapter 10 Consultant Selection (https://dot.ca.gov/-/media/dot-media/programs/local-assistance/documents/lapm/ch10.pdf).
https://dot.ca.gov/-/media/dot-media/programs/local-assistance/documents/lapm/ch10.pdf https://dot.ca.gov/-/media/dot-media/programs/local-assistance/documents/lapm/ch10.pdf
The Project includes widening the Hazel Avenue overcrossing of US Highway 50, modifying the westbound on and off ramps to incorporate a shared-use path to improve multimodal connectivity, constructing a retaining wall at the eastbound loop on ramp to increase shoulder width and improve the clear recovery zone, and widening US Highway 50 between Alder Pond and Folsom Boulevard to add an eastbound auxiliary lane.
The construction contract amount to be awarded for the Project is $22,486,419.30 and is anticipated to be awarded to O.C. Jones & Sons, Inc.
(Contractor) by the County’s Board of Supervisors (Board) on December 15, 2026. The construction contract duration is 360 working days, with a Notice to Proceed anticipated in January-February 2027. Close-out activities could last several months after field acceptance. The Project is funded by state and local funds only.
1.3 Scope of services
The selected consultant will be responsible for the following:
Construction management and inspection services with a team that has experience with Caltrans projects of over $10 million as well as bridge construction methods, materials, and sequencing. The team will be required to cover night work and source inspection (guardrail, street light poles, and overhead signs) as required.
Under these services, the consultant shall provide skilled technical and professional personnel to provide construction administration and inspection.
CMID is responsible for administering contracts and will provide guidance, assistance and training on processes particular to the County of Sacramento (e.g., progress payments, change orders, and items requiring Board action).
Consultant will need to provide Quality Assurance (QA) services to ensure materials used in construction meet all relevant specifications and standards.
QA tasks may include, but are not limited to inspection, source inspection, sampling and testing concrete, soils, asphalt, pipes, reinforcing steel, welds, connections, etc. This task includes preparation of reports and collection of documentation such as certificates of compliance, mill certifications, aggregate and concrete tags, etc., as delineated in the project specifications and special provisions. Particular attention should be given to FHWA sampling and testing requirements.
This consultant contract will be with CMID and consultant staff will work under the direction of CMID supervisors or managers utilizing CMID procedures.
Attachment 6 contains descriptions of County job classifications that CMID typically utilizes in managing and inspecting construction projects. Consultant staff should have similar qualifications, skills and abilities, though at times staff may be required who possess special expertise such as schedulers, cost estimators, specialized construction inspection or design-related abilities.
A. General:
1. Construction Management Plan: Consultant shall prepare a construction management plan including at a minimum an organization chart of the overall Construction Management (CM) project team, a description of the duties and responsibilities of the construction management staff, claims avoidance strategy, anticipated level of effort and a description of the process for submitting, reviewing, and returning submittals, requests for information, and change orders.
2. Mobilize / Field Office Setup: Consultant shall be responsible for mobilizing all necessary staff to and from the project site.
Consultant shall prepare, equip and stock the field office with any additional office equipment not covered in the construction contract documents and required for completion of the work. Computers, networking hardware and maintenance services of computer and related equipment are provided by the County. Other office equipment is provided through the construction contract as shown in the project special provisions or specifications. Consultant is also responsible for providing automobile transportation, mobile phones, digital cameras (including memories) for its personnel for the duration of the construction project along with other consumable supplies. Consultant may be requested to provide software such as Autocad, Primavera P6, or other software. Commute mileage will not be reimbursed.
3. Safety Equipment: Consultant shall be responsible for providing all necessary personnel protection equipment to its employees such as hard hats, boots, gas monitors, etc.
4. Safety Training: Consultant shall provide any necessary safety training required by its firm for its employees, visitors and County staff. CMID will provide supplemental training specific to working on County projects.
5. Weekly Progress Meetings: Appropriate consultant staff shall attend weekly progress meetings between the Contractor, Owner staff, and the CM team throughout the construction project. Consultants shall prepare agendas and minutes/status reports for all weekly and other meetings.
B. Typical Construction Inspection Activities
1. Inspection Plan: Consultant shall prepare an inspection plan containing an outline of all the inspections that need to be made, a checklist of items to include, and the type of tests that are required (including frequency). The inspection plan should include detailed inspection procedures; an outline of acceptance and rejection procedures; a list of all of the tests that are needed, and how often they need to be performed; designation of responsibility for calling laboratories or performing tests; designation of who will prepare samples; and timing of inspections with the scheduled work.
2. Inspection: This task will include full or part-time inspection of construction activities and includes construction staking, monitoring all construction work, preparing daily inspection reports utilizing CMID’s database and recording field events to ensure, to the extent possible, projects are constructed in accordance with plans and specification and tracking and recording on a daily basis change order work performed on a force account basis. This task also includes monitoring compliance with all environmental requirements including Stormwater Pollution Prevention Programs (SWPPP) and similar requirements.
3. Materials Testing, and Source Inspection: This task includes QA of material used to confirm permanent material incorporated into the project meets project specifications. Tasks may include, but are not limited to, the inspection, source inspection, testing and sampling of concrete, soils, asphalt, pipe, reinforcing steel, welds, etc. This task includes collection of documentation such as certificates of compliance, mill certifications, etc. as delineated in the project specifications and special provisions.
4. Specialty Inspection: This project will require specialty inspection for structures, confined space, as well as source inspection for guardrail, street light poles, and overhead signs. In addition to special requirements for construction inspectors as described in Attachment 6, specialty inspectors shall have a minimum of 5 years of experience and 2 verifiable projects involving similar types of inspection.
C. Document Control
Consultant shall utilize CMID’s document management and tracking system (CMIS) for recording, storage, distribution, tracking, reporting, and retrieval of project information. CMIS is a web-based document control software program that will be provided to the consultant. More information on CMIS can be found here: https://c-https://c-mis.com/web/products.php mis.com/web/products.php.
D. Typical Construction Contract Administration
1. Process Contractor Submittals: This task includes reviewing, processing and routing Contractor submittals, work plans, schedules, and safety plans, traffic control plans, etc.; processing each of submittal and providing responses to the Contractor.
2. Process Requests for Information (RFI’s): This task includes reviewing Contractor generated RFI’s, determining the adequacy of the submission, processing, routing and providing responses to the Contractor.
3. Field Instruction (FI’s): This task includes all work associated with the preparation, issuance, and document control of FI’s issued to the Contractor. Included in this task is preparing cost estimates for each FI with a cost or time impact (see item 6).
4. Schedule Review: This task includes monitoring the progress of the Contractor as it relates to its monthly published schedule and determining if the Contractor is meeting the project schedule.
5. Progress Payments: This task includes the review of monthly progress payment requests, and preparation progress pay estimates.
6. Conflict Resolution / Contract Change Orders (CCO): It is imperative the Construction Management Team works closely with CMID and Owner staff to determine if a particular occurrence or condition constitutes a CCO. Appropriate personnel will be expected to participate and assist with resolving conflicts as they arise. This task includes all work associated with the preparation of CCO’s for the construction of the project, including drafting, reviewing, and assessing impacts to the project schedule and the cost of each CCO.
Also included is the preparation of supporting documents necessary for approval of the CCO by the Board. To the extent costs are known, consultant shall prepare notifications to the Board for any change order item expected to exceed $210,000 and seek prior approval of the Board for all changes exceeding the Director’s signature authority.
7. Project Close-Out: This task includes the preparation and document control of all documents associated with project close-out, including punch lists, beneficial occupancy, substantial completion, field acceptance, record drawings, warranty inspections, etc.
https://c-mis.com/web/products.php
In addition to the above scope of services, the following are requirements of the contracts to be awarded in response to this RFP.
Financial Management System
All consultants are required to have a project/cost accounting system adequate to accumulate and track direct labor and other direct costs by contract, segregating indirect costs, and removing unallowable costs as set forth in 48 CFR Part 31. All consultants must certify that their financial management system meets the standards for financial reporting, accounting records, internal and budget control as set forth in the Federal Acquisition Regulation, 49 CFR Part 18 to the extent applicable to consultant.
2 General Rules
2.1 RFP overview
This RFP is an invitation for proposers to submit a proposal to the County. This RFP does not commit the County to award a contract to any proposer.
Submission of a proposal shall neither obligate nor entitle a proposer to enter into a contract with the County.
2.2 Estimated timeline and extension of time
Please refer to the OpenGov Procurement project page for information on timelines.
These dates are subject to revision or cancellation by the County in its sole and absolute discretion.
2.3 Proposal format and content (Attachment 2)
When submitting a proposal, the proposer must follow the format and contents detailed in Attachment 2. Failure to do so will likely prolong the evaluation process and could result in a proposal not being considered.
2.4 Proposal submission
Proposals must be received by the submission deadline in OpenGov Procurement via the solicitation link at:
https://procurement.opengov.com/portal/saccounty/projects/309087
Failure to submit a proposal on time may be grounds for rejection of the proposal; however, the County reserves the right, in its sole and absolute discretion, to accept proposals after the proposal due date.
https://procurement.opengov.com/portal/saccounty/projects/309087
2.5 Questions and communication
Questions concerning this RFP must be submitted to this solicitation’s “Question & Answer” page in OpenGov Procurement prior to the deadline stated on the OpenGov Procurement project page. Answers to “Frequently Asked Questions” are included in Attachment 5.
Questions received via phone or e-mail to direct points of contact for this RFP will not be considered nor responded to. The County shall respond to questions properly submitted as described above via addenda.
2.6 Addenda
The County reserves the right to modify the RFP at any time prior to the proposal due date. The County will modify the RFP only by formal written addenda. Proposer’s proposal should be based on this RFP document and any formal written addenda. Proposers should not rely on oral statements.
Addenda will be posted in OpenGov Procurement. It is the responsibility of each prospective proposer to assure receipt of all addenda.
2.7 County’s right to withdraw, cancel, suspend and/or modify RFP The County reserves the right to withdraw, cancel, suspend, and/or modify this RFP for any reason and at any time with no liability to any prospective proposer for any costs or expenses incurred in connection with the RFP or otherwise.
2.8 Proposer’s right to edit or cancel proposal
Proposers may edit or cancel their proposal in OpenGov Procurement prior to the due date.
2.9 Proposals will not be returned
Upon submission, proposals will not be returned.
2.10 Public disclosure of proposal documents
The County will treat all information submitted in a proposal as available for public inspection once negotiations with the selected party have been completed. If copies of proposals are included with Board materials, the County will make proposals available for public inspection once staff has made a recommendation for award.
If a proposer believes protected data is included in its proposal, the proposer shall clearly identify the data and provide the legal basis in support of the asserted classification. Proposer must present such information separately as part of its proposal OR type in bold red letters the term “CONFIDENTIAL” on that specific part or page of the proposal which proposer believes to be confidential. Classification of data as trade secret data will be determined pursuant to applicable law, and, accordingly, merely labeling data as “trade secret” or “CONFIDENTIAL” does not necessarily make the data protected as such under any applicable law.
In order for the County to assert the confidentiality of any such information in the event a Public Record Act request is received, the proposer must request, execute and submit a County-prepared written agreement to defend and indemnify the County for any liability, costs and expenses incurred in asserting such confidentiality as part of the proposal (Attachment 4).
The final determination of whether the County will assert a proposer’s claim of confidentiality shall be at the sole discretion of the County. Any information determined to be non-confidential shall be considered public record. If the County determines that your information does not meet the criteria for confidentiality, you will be notified of the County’s intent to release the public record pursuant to any Public Records Act request.
The proposer agrees, as a condition of submitting its proposal, that the County will not, as between the parties, be liable or accountable for any loss or damage, which may result from a breach of confidentiality related to the proposal. The proposer agrees to indemnify and hold the County, its officials, agents, and employees harmless from all claims arising out of, resulting from, or in any manner attributable to any violation of any provision of the California Public Records Act, including legal fees and disbursements paid or incurred to enforce this provision.
2.11 Proposer’s costs
The County shall not be responsible for any costs incurred by proposer in connection with this RFP. Proposer shall bear all costs associated with proposal preparation, submission, and attendance at interviews, or any other activity associated with this RFP or otherwise.
2.12 Proposer’s ideas
To the extent permitted by law, the County reserves the right to use any or all ideas, concepts, or other information provided in any proposals. Selection or rejection of the proposal does not affect this right.
2.13 Collusion
If the County determines that collusion has occurred among proposers, none of the proposals of the participants involved in the collusion shall be considered.
The County’s determination shall be final.
2.14 Conflict of interest
The proposer affirms that to the best of its knowledge the submission of its proposal, or any resulting contract, does not present an actual or perceived conflict of interest. The proposer agrees that should any actual or perceived conflict of interest become known, it will immediately notify the County and will advise whether it will or will not avoid, mitigate, or neutralize the conflict of interest.
The County may make reasonable efforts to avoid, mitigate, or neutralize a conflict of interest by a proposer. To avoid a conflict of interest by a proposer, the County may utilize methods including disqualifying a proposer from eligibility for a contract award or cancelling the contract if the conflict is discovered after a contract has been issued. The County may, at its sole and absolute discretion, waive any conflict of interest.
2.15 Dispute and Protest Process
If a proposer desires to protest the selection decision, the proposer must submit a written protest within five (5) business days of the date on the County’s Notice of Intent to Award. The written protest should be submitted as outlined below. Protests received after the deadline will not be accepted.
Protests must be in writing, must include the name and address of the proposer, identify the RFP service requested, and must state all the specific grounds for the protest. A protest that merely addresses a single aspect of the selected proposal is not sufficient to support a protest. A successful protest will include sufficient evidence and analysis to support a conclusion that the selected proposal, taken as a whole, is an inferior proposal.
The County will respond to a protest following review with the Office of the County Counsel. A memo written by the Office of the County Counsel may be included in materials submitted to the Board of Supervisors for consideration of the award of the contract. The decision of the County will be final. The protest letter must be addressed to the contact provided on the Notice of Intent to Award.
3 Evaluation and Selection
3.1 Proposal evaluation and recommendation for selection
The County reserves the following rights, to be exercised in the County’s sole and absolute discretion: 1) to determine whether any aspect of a proposal satisfactorily meets the criteria established in this RFP; 2) to seek clarification or additional information from any proposer; 3) to negotiate, sequentially or simultaneously, pricing and/or terms with any proposer or vendor; 4) to reject any or all proposals with or without cause; 5) to waive any irregularities or informalities in a proposal; and 6) to cancel or amend by addenda this RFP, in part or entirely.
Evaluation of proposals by a selection committee, evaluation panel, County staff, a technical advisory committee, or by another group, individual or entity is advisory only. The County of Sacramento Board of Supervisors or its designee may consider or reject such evaluation(s) for any or all proposals. Such evaluations are for the sole benefit of the County of Sacramento Board of Supervisors or its designee, and as such, they are not binding upon the County, nor may they be relied upon in any way by a proposer.
Following the initial review of proposals, consultants will be shortlisted according to the Proposal Evaluation criteria listed in Section 3.4 and oral interviews will be held with shortlisted firms according to the Interview Evaluation criteria listed in Section 3.4. After interviews of the shortlisted firms, a contract will be negotiated with the most qualified firm solely based on the interview evaluation and submitted to the Board of Supervisors for approval.
3.2 Evaluation of responsiveness
The County will consider all the material submitted by the proposer to determine whether the proposer’s offer is in compliance with the terms and conditions set forth in this RFP. Proposals that do not comply with the provisions in this RFP may be considered nonresponsive and may be rejected.
3.3 Evaluation of responsibility
To determine whether a proposer is responsible, the County will consider the proposer’s general qualifications to perform the requested services in a satisfactory manner; financial responsibility; integrity; skill; past performance;
and ability. Proposals from proposers considered non-responsible will be rejected.
3.4 Evaluation panel and evaluation criteria
After the initial review of each responsive proposal, proposers will be shortlisted to move on to the interview process. The short list of proposers may be asked to provide additional information. The short list of proposers will be asked to attend an in-person interview/presentation, as determined by the County in its sole discretion.
Proposal Evaluation Criteria will be based on the following: (Maximum of 100%)
1. Firm capabilities and specializations (20%)
2. Qualifications and construction experience of proposed personnel (30%)
3. Prior experience in providing construction management and inspection services for transportation projects, including recent experience on similar projects, especially those projects within Sacramento County or for Caltrans (25%)
4. References (10%)
5. The experience of the proposed personnel working with public agencies
(15%)
Interview Evaluation Criteria will be based on the shortlisted firm’s ability to demonstrate how it will execute the project, manage risk, collaborate with CMID, and deliver the project successfully as follows: (Maximum of 100%)
1. Project team and key personnel (25%)
2. Communication, collaboration, and problem solving (20%)
3. Quality assurance and risk and safety management (15%)
4. Scheduling and project execution (15%)
5. Project understanding and approach (10%)
6. Preconstruction and cost management (10%)
7. Overall preparedness and clarity (5%)
No consulting firm or sub consulting firm currently working on the design of the Project, regardless whether the firm has a separate construction management group, is eligible to provide personnel on the Project, either as a lead firm or as a subconsultant. This same criterion also applies specifically to the engineer of record on the Project. Should the engineer of record leave the firm they were with during design of the Project and join a different firm, that engineer of record will not be allowed to participate in the construction management on the Project.
3.5 Execution of contract
The selected proposer shall execute an agreement with the County of Sacramento, using the standard consulting agreement (Attachment 3). Any requested revisions, deletions, or additions, to the language in the attached sample agreement shall be clearly set forth in the proposal for the County’s consideration. The County reserves the right, but has no obligation, to consider proposed revisions during contract negotiations with the selected proposer. The County reserves the right to reject revisions submitted outside of, or subsequent to, the proposal.
If negotiations with the selected proposer are unsuccessful due to unresolved issues, negotiations with the firm will be formally terminated. The County may then commence negotiations with the second ranked firm.
Before a contract becomes effective between the County and any proposer, the contract must be reviewed by County Counsel, and the contract award must be approved by the County Board of Supervisors or its designee. If for any reason the County Board of Supervisors or its designee does not ratify and sign the contract, then there are no binding obligations whatsoever between the County and the proposer relative to the proposed contract.
4 Attachments Attachment 1 – Location map Attachment 2 – Proposal format and content Attachment 3 – County of Sacramento Standard Consulting Agreement Attachment 4 – Written Agreement to Indemnify for Release of
Propriety Information Attachment 5 – Frequently Asked Questions Attachment 6 – Overview of Job Descriptions
Attachment 1 – Location Map Contract No. 4703, “Hazel Avenue At U.S. 50 Interchange Improvements Project – Segment 1,” Award Of Bid In The Amount Of $22,486,419.30 To O.C. Jones & Sons, Inc.; Environmental Document: Final Environmental Impact Report/Environmental Assessment (Control No. PLER 2011-70062)
Project Location:
Hazel Avenue at U.S. 50 Interchange
Not to Scale
Attachment 2 – Proposal format and content
A1. INTRODUCTION
Proposals must adhere to the following format:
The purpose of these guidelines is to help assure consistency in format and content of proposals that are prepared by proposer and submitted to the County.
This process is intended to reduce the time required for the proposer to prepare a proposal and to simplify the review process by County personnel.
Submitted proposals must contain the information as set forth in this section.
Failure to include this information or an incomplete response may be a cause for rejection. The proposals will be used to evaluate and select the most qualified firm or firms to provide these services. The consultant contract will be based upon the needs of CMID, and as such, some of the personnel proposed by the consultant may not be used.
The proposal should contain the following information in the order listed:
1. Introductory Letter
2. Qualifications and Capability
3. References
3. Conflict of Interest Statement
4. Employment Practices
5. Insurance Coverage
6. Acceptance of Terms
7. Supportive Information
A2. RECOMMENDED DETAIL
1. Introductory Letter The introductory letter should be addressed to:
Juan Chavez
CMID
Community Services Agency County of Sacramento 9800 Goethe Road Sacramento, CA 95827 Attn: Marc Martin
The firm submitting the Proposal shall give its name, mailing address, telephone number, email address and the name of an individual to contact if further information is desired. This letter should contain a statement of the proposer’s basic understanding of the project. This should be based on existing information available in the RFP, from a site visit, and from applicable regulations or requirements. This letter should also contain an expression of the proposer’s interest in the work, a statement regarding the qualifications of the proposer to do the work, and any summary information on the project team or the proposer that may be useful or informative to the County.
2. Qualifications and Capability Identify the key individuals, including sub-consultants who are proposed to be part of the team along with their qualifications and experience as related to the project. Experience on similar or related projects should be included as well as specific areas of expertise. Any change in key personnel after the award must be approved by the County before the change is made.
Describe the proposer's capability for actually undertaking and performing the work. Types and locations of similar work performed in the last five years that best characterize the quality of the proposer should be included. Names and phone numbers of individuals that can provide information related to work quality. Other resources, including management and organization capabilities, should be addressed.
Your proposal should also contain résumés for each staff member as well as your firm’s experience related to our scope of work.
The main text of the submitted proposals should be limited to twenty pages (Times Roman 12 Point Font), exclusive of resumes and attachments noted in section 4 of this Attachment 2 below, and should include:
• A brief history of the firm’s business and organization
• An explanation of why your firm is best suited to provide construction management and inspection services and why your participation will make this project successful.
• The firm’s related experience, qualifications, expertise, experience, areas of specialization, and government contracts. Contract documents may contain provisions for a Disputes Review Board, escrow bid documents, and a geotechnical baseline report; discuss your firm’s/team’s experience related to these contract provisions.
• A description of your firm’s recruitment methodology and candidate screening methods.
• A list of the personnel proposed for each type of inspection with a history of employment and related experience. Provide a list of any certificates held by personnel assigned to these projects. Describe in appropriate detail the training, qualifications and experience of personnel in providing construction inspection and management services.
Note: Firms are encouraged to utilize local personnel in the solicitation process for any services included in the proposal that it intends to subcontract.
Additional information to include as attachments are:
• The firm’s Safety Policy.
• The firm’s Confined Space Program and Policy.
• Project list containing a description of projects where construction support services similar to the Scope of Services in this RFP were provided in the past 5 years (or are currently provided) with an emphasis placed on projects similar to the Project, the firm's role in the project (i.e. pre-design, design, construction management, etc.), responsibilities of proposed on-call staff, the dollar amount of the original consultant agreement for CM services, the final cost of CM services, the construction contract bid amount, the final cost of construction, the initial and final construction schedules, and a contact person, including telephone number, of the project owner.
• Other related information.
3. Conflict of Interest Proposers shall disclose any actual, apparent or potential conflicts of interest that may result from any financial, business or other relationship with the County or property owners that may have an impact upon the outcome of this contract or the County construction project. Proposers shall also list current clients who may have a financial interest in the outcome of this contract or the County construction project that will follow. In particular, proposers shall disclose any financial interest or relationship with any property owners or any construction companies that might submit a bid on the County construction project.
Solicitation of sub-consultants, sub-contractors, other service providers and supplier:
If the proposer intends to solicit sub-professionals and/or quotes for certain tasks on this project from qualified sub-consultants, sub-contractors, other service providers and suppliers, the County expects the proposer to solicit qualified firms in the local business community for such services and supplies.
The solicitation conducted should be as broad as possible to reasonably provide opportunities for and encourage relationship building with qualified small and local businesses in the Sacramento community. Proposer shall not illegally discriminate in the solicitation process.
Substitution of any sub-consultants, sub-contractors, other service providers and suppliers identified in the proposal upon which the agreement is based shall not be made without the written consent of CMID.
4. Insurance
The prospective consultant shall provide a summary of the firm's present insurance coverage for Comprehensive General Liability Insurance, Professional Errors and Omissions Insurance, Automobile Liability Insurance, and Worker's Compensation Insurance.
For additional information regarding insurance requirements, see Exhibit B of the Sample Agreement.
5. Acceptance of Terms Proposers shall confirm they reviewed and agree to be bound by County of Sacramento standard consulting agreement (Attachment 3) including insurance provisions; or, alternatively, a statement confirming that the proposer has reviewed and agrees to be bound by County of Sacramento standard consulting agreement (Attachment 3), excluding only those provisions that have been redlined for negotiation purposes and are included in their proposal. The County reserves the right to reject any proposed edits the County determines to not be in the County’s best interests.
6. Supportive Information Supportive information may include graphs, charts, photographs, resumes, references, etc. and is to the proposer’s complete discretion.
A3. COST PROPOSAL
The following are guidelines for preparing the fee proposal.
The Proposer shall prepare and submit a separate detailed fee proposal for each of the activities listed in the Scope of Services along with a summary of all costs.
The fee proposal shall follow the criteria and format outlined in the “sample Fee Proposal” and shall be submitted in OpenGov as a separate document from the Proposal.
If subconsultants are to be used, the Proposer must indicate the cost of the applicable subcontract including any markup that the Proposer plans to take on subconsultants. The breakdown of subcontract costs shall follow the same format provided in the “Sample Fee Proposal”.
Construction management firms are advised that all Construction Management staff providing inspection, surveying, materials testing and source inspection work or other covered labor classifications shall be paid prevailing wages in accordance with the State of California SB 1999 and Labor Code Chapter 1720 requirements for inspection of public works and must be registered with the Department of Industrial Relations in accordance with SB 854. The prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations (http://www.dir.ca.gov/OPRL/PWD/index.htm ) are on file at the office of the http://www.dir.ca.gov/OPRL/PWD/index.htm
Labor Compliance Program, 9800 Goethe Road, Sacramento, California 95827, and are available upon request.
Attachment 3 – County of Sacramento Standard Consulting Agreement
Refer to Sample Contract available in the Open Gov Portal.
Attachment 4 – Written Agreement to Indemnify for Release of Proprietary Information
Refer to language within Sample Contract available in the Open Gov Portal.
Attachment 5 – Frequently Asked Questions
1. Question: Are there specific minority goals?
Answer: No, the DBE program suspended by Caltrans on October 3, 2025 and this project is not federally funded.
2. Question: What types of certifications are required?
Answer: Certifications are required for inspectors that inspect structures for human occupancy (AB 717 requirement). All electrical, mechanical and structural inspectors should be certified. CMID recognizes certifications obtained from ICC.
3. Question: Will consultants be providing training?
Answer: Consultants will be asked to assist in training and professional growth of staff.
4. Question: What is the most important element when it comes to working with consultants?
Answer: The ability to provide qualified staff when requested.
5. Question: Based on past contracts what has been the most frustrating?
Answer: Not able to provide qualified staff when requested.
6. Question: Will consultants be required to perform confined space entries requiring self-contained breathing apparatus?
Answer: This may be required on an occasional basis.
7. Question: Can you provide examples of types of specialty inspection that could be required?
Answer: Structures, source inspections for guardrail, street light poles, and overhead signs.
8. Question: Are former County employees precluded from working the project covered by this RFP?
Answer: No.
9. Question: What systems or processes are to be utilized by consultants?
Answer: Consultants are to follow County and CMID established procedures. Consultants will utilize CMID established logs and filing system, including CMIS.
10. Question: If a consultant provides staff for the entire project do they still need to use CMID established logs and filing system?
Answer: Yes.
11. Question: Can a firm who performed design services on a project provide Construction Supports Services Staff on that project?
Answer: No.
12. Question: Whose Safety Plan (IIPP) will a consultant use?
Answer: The consultant will be expected to follow CMID Safety Polices as well as firm specific policies.
13. Question: Is project scheduling required?
Answer: Review, analysis and critique of contractor provided schedules may be required.
14. Question: Is cost estimating required?
Answer: Cost estimating of change orders or proposed change orders may be required.
15. Question: Is material testing required (soils, concrete, asphalt, etc.)?
Answer: Generally, CMID performs onsite material testing. However, consultant may be asked to perform material source inspection and supplement or perform typical materials sampling and/or testing including soils compaction, concrete compressive strength. CMU, Asphalt density and others.
16. Question: Will the firms be required to provide office trailers, supplies, computers, etc.?
Answer: The Consultant will not be required to provide office space.
Office space will be provided either in the contractor’s supplied office space or within County/CMID facilities. General office supplies will be provided when consultant staff are required to be on-site within County facilities.
Mobile devices such as cell phones and/or tablets are considered normal tools of the trade and will not be provided or separately reimbursed.
County hard tower will be provided for the Consultant to remote into.
17. Question: Will firms be providing engineering design support?
Answer: Typically, the designer of a project will provide this service.
However, the selected consultant might be asked to provide some engineering design support and field staff often provide suggested solutions to questions, issues, problems, etc.
18. Question: Are safety services required?
Answer: Generally no. CMID has access to Safety Specialists that provide this function.
19. Question: Will firms provide survey services or construction staking?
Answer: No, these services will be provided by County Engineering’s survey section and/or their consultants.
20. Question: Who approves this contract?
Answer: The County Board of Supervisors.
21. Question: Should equipment, such as vehicles, be included in the cost proposal?
Answer: Yes and will be part of the negotiations.
Attachment 6 – Overview of Job Descriptions
Additional information about the knowledge and qualifications required to perform this work is available at:
http://agency.governmentjobs.com/sacramento/default.cfm?action=agencysp ecs.
Welding Inspector: This inspector must be an AWS certified welding inspector with experience in pipe, structural and tank welding and have:
• The ability to maintain an effective working relationship with builders, contractors, consultants, fellow employees, other departments, and the general public.
• The ability to read, write, and speak English at a level necessary for satisfactory job performance.
Special Requirements:
• A valid California Driver's License, Class C or higher
• Ability to climb ladders, work on scaffolding, crawl in and out of attic spaces and building crawl spaces.
• Trained and certified in: fall protection, CPR, first aid, and OSHA construction safety.
• AB 717 certification- Health and Safety Code Section 18949.25-18949.31
Construction Inspector: This inspector is responsible for reviewing construction plans and specifications and providing inspection services on all construction projects for compliance with plans and specifications. He or she must have the following:
• Knowledge and understanding of federal, state, county and local codes including but not limited to: The Uniform Building Code, Caltrans Construction Specifications, Sacramento County Construction Standards and Title 24, California Administrative Code.
• Knowledge and understanding of, citing, and enforcing code requirements in the inspection and construction of road and bridge projects including all ancillary aspects of these types of projects such as irrigation and landscaping.
• The ability to read, understand, and apply code requirements as they apply to construction situations.
• The ability to clearly, accurately, and completely document code violations.
• The ability to maintain an effective working relationship with builders, contractors, consultants, fellow employees, other departments, and the general public.
• The ability to read, write, and speak English at a level necessary for satisfactory job performance.
Special Requirements:
http://agency.governmentjobs.com/sacramento/default.cfm?action=agencyspecs http://agency.governmentjobs.com/sacramento/default.cfm?action=agencyspecs
• A valid California Driver's License, Class C or higher.
• Ability to climb ladders, work on scaffolding, crawl in and out of attic spaces and building crawl spaces.
• Trained and certified in: fall protection, CPR, first aid, and OSHA construction safety.
• May require AB 717 certification -Health and Safety Code Section
18949.25-18949.31
Electrical Inspector: This inspector is responsible for reviewing construction plans and specifications and providing inspection services on construction projects for compliance with plans and specifications. He or she must have the following:
• Knowledge and understanding of federal, state, county and local codes including but not limited to: Sacramento County Electrical Code, Uniform Electrical Code, National Electrical Code, and electrical sections of Title 24, California Administrative Code.
• Knowledge and understanding of, citing, and enforcing code requirements associated with the inspection and construction of traffic signal and street lighting power, electrical and interconnect systems.
• The ability to read, understand, and apply electrical code requirements as they apply to construction situations.
• The ability to clearly, accurately, and completely document electrical code violations.
• The ability to maintain an effective working relationship with builders, contractors, consultants, fellow employees, other departments, and the general public.
• The ability to read, write, and speak English at a level necessary for satisfactory job performance.
Special Requirements:
• A valid California Driver's License, Class C or higher.
• Ability to climb ladders, work on scaffolding, crawl in and out of attic spaces and building crawl spaces.
• Trained and certified in: fall protection, CPR, first aid, and OSHA construction safety.
• AB 717 certification-Health and Safety Code Section 18949.25-18949.31
Construction Materials Laboratory Technician: The Construction Materials Laboratory Technician performs construction materials sampling and testing.
Typical tasks include collection of field and quarry samples of construction materials and soils such as fresh and cured concrete, asphalt, sand, aggregate, pavement, structural steel and reinforcing bar; performs a variety of routine tests and inspections such as: soil classification, sieve analysis, gradation, PH, moisture, nuclear density, sand equivalent, oven moisture, Kelly-Ball cement, slump cone, concrete compressive strength and masonry tests, both in the laboratory and in the field, determines if test results are in compliance with applicable construction plans, specifications, standards and contracts, performs precise mathematical calculations related to materials testing; prepares data sheets/reports and graphical representation of test results/data and inspects the operations of asphalt and concrete batch plants.
• Knowledge of methods and procedures used to collect and sample construction materials, field and laboratory testing methods and procedures, mathematical procedures related to the accurate performance and applicable Federal, State, and local regulations and ordinances.
• Ability to determine and conduct appropriate tests based on the type of construction material and project requirements, make accurate mathematical calculations read and interpret plans, and specifications.
• Ability to climb ladders, work on scaffolding, crawl in and out of attic spaces and building crawl spaces.
• Trained and certified in: fall protection, CPR, first aid.
• Read, write, and speak English at a level necessary for satisfactory job performance.
• At a minimum be National Institute for Certification in Engineering
Technologies (NICET) Level 2 asphalt, concrete, and/or soils.
• Must possess a Nuclear Gauge Operators Certification (issued by a recognized gauge manufacturer), and American Concrete Institute (ACI) Concrete Strength and Field Testing Technician Grade 1 Certifications and applicable Caltrans Acceptance Tester certification.
Resident Engineer (Engineer): Possession of a valid certificate of registration as a professional civil engineer issued by the California State Board of Registration for Professional Engineers is a requirement of this position.
Engineers perform difficult and complex engineering tasks associated with construction and may act as supervisors to a small group of engineers and/or sub-professional support staff. He or she must have:
• Knowledge of engineering principles and practices, construction methods and materials used in the design and construction of large complex public works projects, budget preparation, principles and techniques of personnel management and supervision, laws and regulations pertaining to the design and construction of public works projects.
• The ability to prepare plans and specifications, perform technical research, prepare reports and adopt effective courses of action. Lay out work and guide subordinates in performing tasks, train personnel, maintain effective working relationships with superiors, subordinates, and the general public.
• The ability to read, write, and speak English at a level necessary for satisfactory job performance.
• Ability to climb ladders, work on scaffolding, crawl in and out of attic spaces and building crawl spaces.
• Trained and certified in fall protection, CPR, and first aid.
• Read, write, and speak English at a level necessary for satisfactory job performance.
Construction Manager: Manages a group of subordinate construction management staff.