Sample ELINs.xls
XLS spreadsheet 281 KB Posted
- Attached to
- Water Testing Services Federal contract opportunity
- Solicitation number
- 5855162
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J-0200000-08 ELINS - SAMPLE.xls | XLS spreadsheet | |
| Sources Sought.docx | DOCX document | |
| Sources Sought.docx | DOCX document | |
| Sources Sought Information Request Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BREAKOUT
| Recurring Price | ||||||
| 0001 | 0003 | 0005 | 0007 | 0009 | ||
| Recurring Work Price | Recurring Work Price | Recurring Work Price | Recurring Work Price | Recurring Work Price | ||
| Base YEAR | 1st OPTION YEAR | 2nd OPTION YEAR | 3rd OPTION YEAR | 4th OPTION YEAR | ||
| Total | $ - 0 | $ 548,782.56 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Recurring Price | ||||||
| 0002 | 0004 | 0006 | 0008 | 0010 | ||
| Non-Recurring Work Price | Non-Recurring Work Price | Non-Recurring Work Price | Non-Recurring Work Price | Non-Recurring Work Price | ||
| Base YEAR | 1st OPTION YEAR | 2nd OPTION YEAR | 3rd OPTION YEAR | 4th OPTION YEAR | ||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| ANNUAL TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&L&F&R&D &T
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015 Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ATTACHMENT J-0200000-04
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40085-09-R-2508
EXHIBIT A - CLIN 9000
Recurring work base period
| ATTACHMENT J-0200000-08 | |
| EXHIBIT LINE ITEM NUMBERS | |
| SOLICITATION/CONTRACT #N40085-xx-x-xxxx | |
| EXHIBIT A - CLIN 0001 | |
| Line Item 0001 Recurring Work - Base Period | |
| ELIN / Sub ELIN | DESCRIPTION |
| A001- REGION Spec Item 3 | |
| A001AA | Auxiliary Seawater System Wastewater |
| A001AB | Ballast Tank Wastewater |
| A001AC | Stormwater Pontoon Deck Runoff at Wet Well |
| A001AD | Hydrostatic Pressure Testing Wastewater (B478) |
| A001AE | Fuel Operations Secondary Containment Treatment Wastewater (B549) |
| A001AF | Stormwater O-6 |
| A001AG | Stormwater O-6 (Tox) |
| A001AH | Stormwater O-6 (Bac) |
| A001AJ | Stormwater O-7 |
| A001AK | Stormwater O-7 (Tox) |
| A001AL | Stormwater O-7 (Bac) |
| A001AM | Stormwater O-15 |
| A001AN | Stormwater O-15 (Tox) |
| A001AP | Stormwater O-15 (Bac) |
| A001AQ | Stormwater O-17 |
| A001AR | Stormwater O-17 (Tox) |
| A001AS | Stormwater O-17 (Bac) |
| A001AT | Stormwater O-22A |
| A001AU | Stormwater O-22A (Tox) |
| A001AV | Stormwater O-22A (Bac) |
| A001AW | Stormwater O-27 |
| A001AX | Stormwater O-27 (Tox) |
| A001AY | Stormwater O-27 (Bac) |
| A001AZ | Stormwater O-35-1 |
| A001BA | Stormwater O-35-1 (Tox) |
| A001BB | Stormwater O-35-1 (Bac) |
| A001BC | Stormwater O-36 |
| A001BD | Stormwater O-36 (Tox) |
| A001BE | Stormwater O-36 (Bac) |
| A001BF | MISC Cutting & Grinding - (Dental Grinding Wheel) |
| A001BG | MISC Tumbling Cleaning - (Parts Cleaner) |
| A001BH | MISC Other - (Boat Wash Rack) |
| A001BJ | B449 Hydrocollator |
| A001BK | Freeze Protection Wastewater |
| A001BL | Fire Hydrant Test Wastewater |
| A001BM | MISC Boiler Blowdown (Boiler # 1S/4) |
| A001BN | MISC Boiler Blowdown (Boiler # 6) |
| A001BP | Oil Water Separation Treatment Wastewater (B029, Rec Tank) |
| A001BQ | Oily Waste Treatment Facility (B553) |
| A001BR | Utility Trench Water, B29 North (at L10) |
| A001BS | Utility Trench Water, B29 South (at L11) |
| A001BT | MISC Water Treatment - (GAC Filters) |
| A001BU | MISC Water Treatment - (RO Concentrate ) |
| A001BV | MISC Water Treatment - ( Water Softeners) |
| A001BW | MISC Water Treatment - (Resin Polishers) |
| A001BX | Utility Trench De-watering Wastewater (B077, U04) |
| A001BY | Utility Trench De-watering Wastewater (B434 North) |
| A001BZ | Drinking Water: Lead and Copper Main Base |
| A001CA | Drinking Water: Lead and Copper Polaris Park |
| A001CB | Drinking Water: Lead and Copper Nautilus Park |
| A001CC | Drinking Water: Lead and Copper Conning Towers |
| A001CD | Drinking Water: Lead and Copper Trident Park |
| A001CE | Drinking Water: Stage 2 Disinfectant Main Base |
| A001CF | Drinking Water: Stage 2 Disinfectant Polaris Park |
| A001CG | Drinking Water: Stage 2 Disinfectant Nautilus Park |
| A001CH | Drinking Water: Stage 2 Disinfectant Conning Towers |
| A001CJ | Drinking Water: Stage 2 Disinfectant Trident Park |
| A001CK | Drinking Water: TCR Main Base |
| A001CL | Drinking Water: TCR Polaris Park |
| A001CM | Drinking Water: TCR Nautilus Park |
| A001CN | Drinking Water: TCR Conning Towers |
| A001CP | Drinking Water: TCR Trident Park |
| A001CQ | Steam Condensate Wastewater, Cond. Rtn. Collection Tank Overflow |
&R&G
Non Recurring Work Base Period
| ATTACHMENT J-0200000-08 | ||
| EXHIBIT LINE ITEM NUMBERS | ||
| SOLICITATION/CONTRACT #N40085-x-xx-xxxx | ||
| EXHIBIT A - CLIN 0002 | ||
| Line Item 0002 Base Period - Non-Recurring Work | ||
| ELIN | Product Name (120 Characters) | Description Extended |
| A700 | Ballast Tank Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Ballast Tank Wastewater. Composite samples shall consist of grab samples collected from six ballast tanks (3 from each side of the dry dock) and combined into one sample. A single grab sample shall be collected from each of the 6 tanks and tested for total residual Oxidants and pH. Grab samples shall be collected from six ballast tanks (3 from each side of the dry dock) and analyzed using Section 8.3 of EPA Method 1664A for oil and grease. Each grab will be analyzed for O&G. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A701 | Steam Condensate Wastewater, Cond. Rtn. Collection Tank Overflow | The Contractor shall perform environmental laboratory services, and associated reporting requirements for a Steam Condensate Wastewater, Cond. Rtn. Collection Tank Overflow Wastewater. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A702 | Hydrostatic Pressure Testing Wastewater (B478) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Hydrostatic Pressure Testing Wastewater. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A703 | Cutting & Grinding Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Miscellaneous General Permit Cutting & Grinding Wastewater in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A704 | MISC Tumbling Cleaning - (Parts Cleaner) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Minor Tumbling or Cleaning of Parts Wastewater discharge in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A705 | Drinking Water - Initial | The Contractor shall perform sampling, field testing, laboratory services and associated reporting requirements for Drinking Water-Initial screening in various locations. Samples are collected within two working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A706 | Drinking Water - Follow-up | The Contractor shall perform sampling, field testing, laboratory services and associated reporting requirements for Drinking Water-Follow-up screening in various locations. Samples are collected within two working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A707 | Water Treatment Wastewater Analysis | The Contractor shall perform laboratory services and associated reporting requirements for a Water Treatment Wastewater process discharges. Collect 1st and last 10% of discharge. Not required after Mar2017. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A708 | Utility Trench De-watering Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Utility Trench Wastewater Analysis in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A709 | Boiler Blowdown Analysis | The Contractor shall perform laboratory services, and associated reporting requirements for a Boiler Blowdown Wastewater Analysis in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A710 | Vehicle Maintenance Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Vehicle Maintenance Wastewater Analysis in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A711 | Quality Control Samples: Field Duplicate | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for Field Quality Control Samples: Field Duplicates (FD) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental. |
| A712 | Quality Control Samples: Field Matrix Spike | The Contractor shall perform environmental sampling, field testing, laboratory services and associated reporting requirements for Field Quality Control Samples: Matrix Spike (MS) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental. |
| A713 | Quality Control Samples: Field Blank | The Contractor shall perform environmental sampling, field testing, laboratory services and associated reporting requirements for Field Quality Control Samples: Field Blank (FB) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental. |
| A714 | Quality Control Samples: Equipment Blank | The Contractor shall perform environmental sampling, field testing, laboratory services and associated reporting requirements for Field Quality Control Samples: Equipment Blank (EB) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental. |
| A715 | Quality Control Samples: Proficiency Test | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for Field Quality Control Samples: Proficiency Tests (PT) in various locations. |
| A716 | Emergency Sample Testing and Reporting - 24 hours | The Contractor shall provide test results within 24 hours of sample collection to ensure the installation complies with EPA and state requirements. |
| A717 | Emergency Sample Testing and Reporting - 48 hours | The Contractor shall provide test results in accordance with the SUBASE WTK SAP within 48 hours of sample collection to ensure the installation complies with EPA and state requirements. |
| A718 | Emergency Sample Testing and Reporting - 3-to-6 days | The Contractor shall provide test results in accordance with the SUBASE WTK SAP within 3-to-6 days of sample collection to ensure the installation complies with EPA and state requirements. |
| A719 | Utility Trench De-watering Wastewater (B077, U04) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Utility Trench Wastewater Analysis. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A720 | Utility Trench De-watering Wastewater (B434 North) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Utility Trench Wastewater Analysis. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A721 | WW Permit Application: Attachment O, Part B, Table 1 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A722 | WW Permit Application: Attachment O, Part B, Table 2 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A723 | WW Permit Application: Attachment O, Part B, Table 3 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A724 | Freeze Protection Wastewater (Aquatic Tox) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Freeze Protection Wastewater Analysis in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A725 | Auxiliary Seawater System Wastewater (SHIPP-HV) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Auxiliary Seawater System Wastewater Analysis on SHIPPINGPORT to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A726 | Stormwater Pontoon Deck Runoff at Wet Well | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Stormwater Pontoon Deck Runoff at Wet Well Analysis in various locations on SHIPPINGPORT to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A727 | Fire Hydrant Test Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Fire Hydrant Test Wastewater Analysis in various locations to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A728 | Oily Waste Treatment Facility (B553) Analysis | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Oily Waste Treatment Facility Analysis at B-553 to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A729 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. |
| A730 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A729. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. |
| A731 | Freeze Protection Wastewater | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Freeze Protection Wastewater Analysis in various locations to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A732 | Oily Waste Treatment Facility (B553) Analysis | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Oily Waste Treatment Facility Analysis at B-553 to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A733 | MISC Other - (Boat Wash Rack, Water Jet Cutter, Storm CB Decant, FROT) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for MISC GP - Other Category to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A734 | Acute Aquatic Toxicity (LC50) | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A735 | Aluminum (Al), Total | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A736 | Chemical Oxygen Demand (COD) | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A737 | Chloride (Cl) | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A738 | Copper (Cu), Total | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A739 | Cyanide, Total (CN) | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A740 | Enterococci | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A741 | Fecal Coliform | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A742 | Iron (Fe), Total | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A743 | Lead (Pb), Total | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A744 | Nitrate, as N | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A745 | Oil & Grease, Total | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A746 | Phosphorus (P), Total | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A747 | Total Kjeldahl Nitrogen (TKN) | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A748 | Total Suspended Solids (TSS) | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A749 | Zinc (Zn), Total | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A750 | pH | The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753. |
| A751 | Transportation of Samples | Pick up and transport samples to testing facilities for ELINS A734 through A750 |
| A752 | Sample Collection | The Contractor shall perform sample collection for ELINS A734 through A750 |
| A753 | Storm Water Process | The Contractor shall perform scheduling of laboratory services and associated reporting requirements for environmental Stormwater samples for ELINS A734 through A750 |
| A754 | B449 Hydrocollator | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A755 | Fats, Oils and Grease (FOG) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A756 | MISC Air Compressor Condensate | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A757 | MISC Commercial Laundry | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A758 | MISC Contact Cooling and Heating Water | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A759 | MISC Food Processing (B175 Refer Boxes) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A760 | MISC GW & SW Inf (Utility MH) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A761 | MISC Hydrostatic Pressure Testing Wastewater (B478) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A762 | MISC NCCW & Ice Machine | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A763 | MISC Table 5-1 | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A764 | MISC Water Treatment - (RO Concentrate / Water Softeners / Resin Polishers / GAC Filters) | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A765 | Drinking Water: TCR | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A766 | Drinking Water: Lead in Priority Areas | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A767 | Drinking Water: Lead in Priority Areas - Follow-up | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05. |
| A768 | MS4 Stormwater Illicit Discharge Detection and Elimination Screening | The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for MS4 Stormwater Illicit Discharge Detection and Elimination Screening at 5 Stormwater outfalls as directed. Samples are collected during a rain event of greater than equal to 0.10 inches of rain. See Discharge Data List: Attachment J-1800000-05. |
&R&G
Recurring Work OPT YR 1
| ATTACHMENT J-0200000-08 | |||||
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION/CONTRACT #N40085-x-xx-xxxx | |||||
| EXHIBIT A - CLIN 0003 | |||||
| Line Item 0003 Recurring Work - 1st Option Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - Recurring Work Price - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs B001 | |||||
| ELIN / Sub ELIN | DESCRIPTION | QTY | Unit of Issue | Unit Price | Total |
| B001- REGION Spec Item 3 | |||||
| B001AA | Auxiliary Seawater System Wastewater | 12 | MO | $ 479 | $ 5,743.61 |
| B001AB | Ballast Tank Wastewater | 12 | MO | $ 4,272 | $ 51,268.70 |
| B001AC | Stormwater Pontoon Deck Runoff at Wet Well | 12 | MO | $ 757 | $ 9,089.57 |
| B001AD | Hydrostatic Pressure Testing Wastewater (B478) | 12 | MO | $ 326 | $ 3,912.62 |
| B001AE | Fuel Operations Secondary Containment Treatment Wastewater (B549) | 12 | MO | $ 525 | $ 6,295.94 |
| B001AF | Stormwater O-6 | 12 | MO | $ 347 | $ 4,167.68 |
| B001AG | Stormwater O-6 (Tox) | 12 | MO | $ 116 | $ 1,387.71 |
| B001AH | Stormwater O-6 (Bac) | 12 | MO | $ 73 | $ 871.88 |
| B001AJ | Stormwater O-7 | 12 | MO | $ 343 | $ 4,112.76 |
| B001AK | Stormwater O-7 (Tox) | 12 | MO | $ 116 | $ 1,387.71 |
| B001AL | Stormwater O-7 (Bac) | 12 | MO | $ 73 | $ 871.88 |
| B001AM | Stormwater O-15 | 12 | MO | $ 340 | $ 4,074.56 |
| B001AN | Stormwater O-15 (Tox) | 12 | MO | $ 116 | $ 1,387.71 |
| B001AP | Stormwater O-15 (Bac) | 12 | MO | $ 73 | $ 871.88 |
| B001AQ | Stormwater O-17 | 12 | MO | $ 343 | $ 4,112.76 |
| B001AR | Stormwater O-17 (Tox) | 12 | MO | $ 116 | $ 1,387.71 |
| B001AS | Stormwater O-17 (Bac) | 12 | MO | $ 73 | $ 871.88 |
| B001AT | Stormwater O-22A | 12 | MO | $ 343 | $ 4,112.76 |
| B001AU | Stormwater O-22A (Tox) | 12 | MO | $ 116 | $ 1,387.71 |
| B001AV | Stormwater O-22A (Bac) | 12 | MO | $ 73 | $ 871.88 |
| B001AW | Stormwater O-27 | 12 | MO | $ 343 | $ 4,112.76 |
| B001AX | Stormwater O-27 (Tox) | 12 | MO | $ 116 | $ 1,387.71 |
| B001AY | Stormwater O-27 (Bac) | 12 | MO | $ 73 | $ 871.88 |
| B001AZ | Stormwater O-35-1 | 12 | MO | $ 334 | $ 4,012.45 |
| B001BA | Stormwater O-35-1 (Tox) | 12 | MO | $ 116 | $ 1,387.71 |
| B001BB | Stormwater O-35-1 (Bac) | 12 | MO | $ 73 | $ 871.88 |
| B001BC | Stormwater O-36 | 12 | MO | $ 337 | $ 4,038.72 |
| B001BD | Stormwater O-36 (Tox) | 12 | MO | $ 116 | $ 1,387.71 |
| B001BE | Stormwater O-36 (Bac) | 12 | MO | $ 73 | $ 871.88 |
| B001BF | MISC Cutting & Grinding - (Dental Grinding Wheel) | 12 | MO | $ 109 | $ 1,306.51 |
| B001BG | MISC Tumbling Cleaning - (Parts Cleaner) | 12 | MO | $ 109 | $ 1,306.51 |
| B001BH | MISC Other - (Boat Wash Rack) | 12 | MO | $ 111 | $ 1,337.56 |
| B001BJ | B449 Hydrocollator | 12 | MO | $ 99 | $ 1,189.50 |
| B001BK | Freeze Protection Wastewater | 12 | MO | $ 294 | $ 3,528.42 |
| B001BL | Fire Hydrant Test Wastewater | 12 | MO | $ 255 | $ 3,061.86 |
| B001BM | MISC Boiler Blowdown (Boiler # 1S/4) | 12 | MO | $ 378 | $ 4,540.57 |
| B001BN | MISC Boiler Blowdown (Boiler # 6) | 12 | MO | $ 378 | $ 4,540.57 |
| B001BP | Oil Water Separation Treatment Wastewater (B029, Rec Tank) | 12 | MO | $ 5,298 | $ 63,577.62 |
| B001BQ | Oily Waste Treatment Facility (B553) | 12 | MO | $ 3,559 | $ 42,711.83 |
| B001BR | Utility Trench Water, B29 North (at L10) | 12 | MO | $ 720 | $ 8,639.97 |
| B001BS | Utility Trench Water, B29 South (at L11) | 12 | MO | $ 727 | $ 8,720.60 |
| B001BT | MISC Water Treatment - (GAC Filters) | 12 | MO | $ 109 | $ 1,312.51 |
| B001BU | MISC Water Treatment - (RO Concentrate ) | 12 | MO | $ 237 | $ 2,838.33 |
| B001BV | MISC Water Treatment - ( Water Softeners) | 12 | MO | $ 237 | $ 2,838.33 |
| B001BW | MISC Water Treatment - (Resin Polishers) | 12 | MO | $ 412 | $ 4,948.63 |
| B001BX | Utility Trench De-watering Wastewater (B077, U04) | 12 | MO | $ 505 | $ 6,058.78 |
| B001BY | Utility Trench De-watering Wastewater (B434 North) | 12 | MO | $ 651 | $ 7,808.22 |
| B001BZ | Drinking Water: Lead and Copper Main Base | 12 | MO | $ 2,731 | $ 32,774.69 |
| B001CA | Drinking Water: Lead and Copper Polaris Park | 12 | MO | $ 683 | $ 8,193.67 |
| B001CB | Drinking Water: Lead and Copper Nautilus Park | 12 | MO | $ 2,731 | $ 32,774.69 |
| B001CC | Drinking Water: Lead and Copper Conning Towers | 12 | MO | $ 1,366 | $ 16,387.35 |
| B001CD | Drinking Water: Lead and Copper Trident Park | 12 | MO | $ 1,366 | $ 16,387.35 |
| B001CE | Drinking Water: Stage 2 Disinfectant Main Base | 12 | MO | $ 418 | $ 5,011.65 |
| B001CF | Drinking Water: Stage 2 Disinfectant Polaris Park | 12 | MO | $ 418 | $ 5,011.65 |
| B001CG | Drinking Water: Stage 2 Disinfectant Nautilus Park | 12 | MO | $ 418 | $ 5,011.65 |
| B001CH | Drinking Water: Stage 2 Disinfectant Conning Towers | 12 | MO | $ 418 | $ 5,011.65 |
| B001CJ | Drinking Water: Stage 2 Disinfectant Trident Park | 12 | MO | $ 418 | $ 5,011.65 |
| B001CK | Drinking Water: TCR Main Base | 12 | MO | $ 4,554 | $ 54,653.14 |
| B001CL | Drinking Water: TCR Polaris Park | 12 | MO | $ 455 | $ 5,465.31 |
| B001CM | Drinking Water: TCR Nautilus Park | 12 | MO | $ 1,822 | $ 21,861.26 |
| B001CN | Drinking Water: TCR Conning Towers | 12 | MO | $ 455 | $ 5,465.31 |
| B001CP | Drinking Water: TCR Trident Park | 12 | MO | $ 911 | $ 10,930.63 |
| B001CQ | Steam Condensate Wastewater, Cond. Rtn. Collection Tank Overflow | 12 | MO | $ 1,786 | $ 21,433.04 |
| TOTAL RECURRING WORK PRICE - Option Period One | $ 548,782.56 |
&R&G
NAVFAC UOMs
| AC | Acre | FR | Frame | PD | Pad | |
| AM | Ampoule | FT | Foot | PG | Package | |
| AT | Assortment | FV | Five | PI | Pillow | |
| AY | Assembly | FY | Fifty | PM | Plate | |
| BA | Ball | GG | Great Gross | PR | Pair | |
| BD | Bundle | GI | Gill | PT | Pint | |
| BE | Bale | GL | Gallon | PX | Pellet | |
| BF | Board Foot | GM | Gram | PZ | Packet | |
| BG | Bag | GN | Grain | QT | Quart | |
| BK | Book | GP | Group | RA | Ration | |
| BL | Barrel | GR | Gross | RD | Round | |
| BO | Bolt | HD | Hundred | RL | Reel | |
| BQ | Briquet | HF | Hundred Feet | RM | Ream | |
| BR | Bar | HK | Hank | RO | Roll | |
| BT | Bottle | HP | Hundred Pounds | RX | Thousand Rounds | |
| BX | Box | HR | Annually (Dec) | SB | Square Mile | |
| CA | Cartridge | 3 | HS | Monthly (Jan,Feb,Mar) | SC | Square Centimeters |
| CB | Carboy | HW | Hundred Weight | SD | Skid | |
| CC | Cubic Centimeter | HY | Hundred Yards | SE | Set | |
| CD | Cubic Yard | IN | Inch | SF | Square Foot | |
| CE | Cone | JR | Jar | SH | Sheet | |
| A701 | Centigram | KM | Kilometer | SK | Skein | |
| A702 | Cubic Inch | KR | Carat | SL | Spool | |
| A703 | Coil | LB | Pound | SO | Shot | |
| A704 | Centimeter | LF | Linear Foot | SP | Strip | |
| A705 | Can | LG | Length | SQ | Square | |
| A706 | Container | LH | Labor Hours | SX | Stick | |
| A707 | Curie | LI | Liter | SY | Square Yard | |
| CY | Cylinder | LM | Linear Meter | TC | Truckload | |
| CZ | Cubic Meter | LO | Lot | TD | Twenty-Four | |
| DA | Days | LS | Lump Sum | TE | Ten | |
| DC | Decagram | LY | Linear Yard | TF | Twenty-Five | |
| DE | Decimeter | MC | Thousand Cubic Feet | TG | Gross Ton | |
| DG | Decigram | ME | Meal | TN | Ton | |
| DL | Deciliter | MF | Thousand Feet | TO | Troy Ounce | |
| DM | Dram | MG | Milligram | TS | Thirty-Six | |
| DO | Dollars | MI | Mile | TT | Tablet | |
| DR | Drum | ML | Milliliter | TU | Tube | |
| DW | Pennyweight | MM | Millimeter | UN | Unit | |
| DZ | Dozen | MO | Months | US | US U.S.P Unit | |
| EA | Each | MR | Meter | VI | Vial | |
| EN | Each Collection | MX | Thousand | WK | Week | |
| EX | Exposure | OT | Outfit | YD | Yard | |
| FD | Fold | OZ | Ounce | YR | Years |
File details come from the government source that posted it. Updated .