J-0200000-08 ELINS - SAMPLE.xls XLS spreadsheet
Sources Sought.docx DOCX document
Sources Sought.docx DOCX document
Sources Sought Information Request Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BREAKOUT

Recurring Price
00010003000500070009
Recurring Work PriceRecurring Work PriceRecurring Work PriceRecurring Work PriceRecurring Work Price
Base YEAR1st OPTION YEAR2nd OPTION YEAR3rd OPTION YEAR4th OPTION YEAR
Total$ - 0$ 548,782.56$ - 0$ - 0$ - 0$ - 0
Non-Recurring Price
00020004000600080010
Non-Recurring Work PriceNon-Recurring Work PriceNon-Recurring Work PriceNon-Recurring Work PriceNon-Recurring Work Price
Base YEAR1st OPTION YEAR2nd OPTION YEAR3rd OPTION YEAR4th OPTION YEAR
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
ANNUAL TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

&L&F&R&D &T

SECTION J

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015 Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

ATTACHMENT J-0200000-04

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT #N40085-09-R-2508

EXHIBIT A - CLIN 9000

Recurring work base period

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40085-xx-x-xxxx
EXHIBIT A - CLIN 0001
Line Item 0001 Recurring Work - Base Period
ELIN / Sub ELINDESCRIPTION
A001- REGION Spec Item 3
A001AAAuxiliary Seawater System Wastewater
A001ABBallast Tank Wastewater
A001ACStormwater Pontoon Deck Runoff at Wet Well
A001ADHydrostatic Pressure Testing Wastewater (B478)
A001AEFuel Operations Secondary Containment Treatment Wastewater (B549)
A001AFStormwater O-6
A001AGStormwater O-6 (Tox)
A001AHStormwater O-6 (Bac)
A001AJStormwater O-7
A001AKStormwater O-7 (Tox)
A001ALStormwater O-7 (Bac)
A001AMStormwater O-15
A001ANStormwater O-15 (Tox)
A001APStormwater O-15 (Bac)
A001AQStormwater O-17
A001ARStormwater O-17 (Tox)
A001ASStormwater O-17 (Bac)
A001ATStormwater O-22A
A001AUStormwater O-22A (Tox)
A001AVStormwater O-22A (Bac)
A001AWStormwater O-27
A001AXStormwater O-27 (Tox)
A001AYStormwater O-27 (Bac)
A001AZStormwater O-35-1
A001BAStormwater O-35-1 (Tox)
A001BBStormwater O-35-1 (Bac)
A001BCStormwater O-36
A001BDStormwater O-36 (Tox)
A001BEStormwater O-36 (Bac)
A001BFMISC Cutting & Grinding - (Dental Grinding Wheel)
A001BGMISC Tumbling Cleaning - (Parts Cleaner)
A001BHMISC Other - (Boat Wash Rack)
A001BJB449 Hydrocollator
A001BKFreeze Protection Wastewater
A001BLFire Hydrant Test Wastewater
A001BMMISC Boiler Blowdown (Boiler # 1S/4)
A001BNMISC Boiler Blowdown (Boiler # 6)
A001BPOil Water Separation Treatment Wastewater (B029, Rec Tank)
A001BQOily Waste Treatment Facility (B553)
A001BRUtility Trench Water, B29 North (at L10)
A001BSUtility Trench Water, B29 South (at L11)
A001BTMISC Water Treatment - (GAC Filters)
A001BUMISC Water Treatment - (RO Concentrate )
A001BVMISC Water Treatment - ( Water Softeners)
A001BWMISC Water Treatment - (Resin Polishers)
A001BXUtility Trench De-watering Wastewater (B077, U04)
A001BYUtility Trench De-watering Wastewater (B434 North)
A001BZDrinking Water: Lead and Copper Main Base
A001CADrinking Water: Lead and Copper Polaris Park
A001CBDrinking Water: Lead and Copper Nautilus Park
A001CCDrinking Water: Lead and Copper Conning Towers
A001CDDrinking Water: Lead and Copper Trident Park
A001CEDrinking Water: Stage 2 Disinfectant Main Base
A001CFDrinking Water: Stage 2 Disinfectant Polaris Park
A001CGDrinking Water: Stage 2 Disinfectant Nautilus Park
A001CHDrinking Water: Stage 2 Disinfectant Conning Towers
A001CJDrinking Water: Stage 2 Disinfectant Trident Park
A001CKDrinking Water: TCR Main Base
A001CLDrinking Water: TCR Polaris Park
A001CMDrinking Water: TCR Nautilus Park
A001CNDrinking Water: TCR Conning Towers
A001CPDrinking Water: TCR Trident Park
A001CQSteam Condensate Wastewater, Cond. Rtn. Collection Tank Overflow

&R&G

Non Recurring Work Base Period

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40085-x-xx-xxxx
EXHIBIT A - CLIN 0002
Line Item 0002 Base Period - Non-Recurring Work
ELINProduct Name (120 Characters)Description Extended
A700Ballast Tank WastewaterThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Ballast Tank Wastewater. Composite samples shall consist of grab samples collected from six ballast tanks (3 from each side of the dry dock) and combined into one sample. A single grab sample shall be collected from each of the 6 tanks and tested for total residual Oxidants and pH. Grab samples shall be collected from six ballast tanks (3 from each side of the dry dock) and analyzed using Section 8.3 of EPA Method 1664A for oil and grease. Each grab will be analyzed for O&G. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A701Steam Condensate Wastewater, Cond. Rtn. Collection Tank OverflowThe Contractor shall perform environmental laboratory services, and associated reporting requirements for a Steam Condensate Wastewater, Cond. Rtn. Collection Tank Overflow Wastewater. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A702Hydrostatic Pressure Testing Wastewater (B478)The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Hydrostatic Pressure Testing Wastewater. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A703Cutting & Grinding WastewaterThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Miscellaneous General Permit Cutting & Grinding Wastewater in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A704MISC Tumbling Cleaning - (Parts Cleaner)The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Minor Tumbling or Cleaning of Parts Wastewater discharge in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A705Drinking Water - InitialThe Contractor shall perform sampling, field testing, laboratory services and associated reporting requirements for Drinking Water-Initial screening in various locations. Samples are collected within two working days of notification. See Discharge Data List: Attachment J-1800000-05.
A706Drinking Water - Follow-upThe Contractor shall perform sampling, field testing, laboratory services and associated reporting requirements for Drinking Water-Follow-up screening in various locations. Samples are collected within two working days of notification. See Discharge Data List: Attachment J-1800000-05.
A707Water Treatment Wastewater AnalysisThe Contractor shall perform laboratory services and associated reporting requirements for a Water Treatment Wastewater process discharges. Collect 1st and last 10% of discharge. Not required after Mar2017. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A708Utility Trench De-watering WastewaterThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Utility Trench Wastewater Analysis in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A709Boiler Blowdown AnalysisThe Contractor shall perform laboratory services, and associated reporting requirements for a Boiler Blowdown Wastewater Analysis in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A710Vehicle Maintenance WastewaterThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Vehicle Maintenance Wastewater Analysis in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A711Quality Control Samples: Field DuplicateThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for Field Quality Control Samples: Field Duplicates (FD) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental.
A712Quality Control Samples: Field Matrix SpikeThe Contractor shall perform environmental sampling, field testing, laboratory services and associated reporting requirements for Field Quality Control Samples: Matrix Spike (MS) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental.
A713Quality Control Samples: Field BlankThe Contractor shall perform environmental sampling, field testing, laboratory services and associated reporting requirements for Field Quality Control Samples: Field Blank (FB) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental.
A714Quality Control Samples: Equipment BlankThe Contractor shall perform environmental sampling, field testing, laboratory services and associated reporting requirements for Field Quality Control Samples: Equipment Blank (EB) in various locations. Samples are collected in conjunction with other samples specified by PWD-Environmental.
A715Quality Control Samples: Proficiency TestThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for Field Quality Control Samples: Proficiency Tests (PT) in various locations.
A716Emergency Sample Testing and Reporting - 24 hoursThe Contractor shall provide test results within 24 hours of sample collection to ensure the installation complies with EPA and state requirements.
A717Emergency Sample Testing and Reporting - 48 hoursThe Contractor shall provide test results in accordance with the SUBASE WTK SAP within 48 hours of sample collection to ensure the installation complies with EPA and state requirements.
A718Emergency Sample Testing and Reporting - 3-to-6 daysThe Contractor shall provide test results in accordance with the SUBASE WTK SAP within 3-to-6 days of sample collection to ensure the installation complies with EPA and state requirements.
A719Utility Trench De-watering Wastewater (B077, U04)The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Utility Trench Wastewater Analysis. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A720Utility Trench De-watering Wastewater (B434 North)The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Utility Trench Wastewater Analysis. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A721WW Permit Application: Attachment O, Part B, Table 1The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A722WW Permit Application: Attachment O, Part B, Table 2The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A723WW Permit Application: Attachment O, Part B, Table 3The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for WW permit application in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A724Freeze Protection Wastewater (Aquatic Tox)The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Freeze Protection Wastewater Analysis in various locations. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A725Auxiliary Seawater System Wastewater (SHIPP-HV)The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Auxiliary Seawater System Wastewater Analysis on SHIPPINGPORT to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A726Stormwater Pontoon Deck Runoff at Wet WellThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Stormwater Pontoon Deck Runoff at Wet Well Analysis in various locations on SHIPPINGPORT to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A727Fire Hydrant Test WastewaterThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Fire Hydrant Test Wastewater Analysis in various locations to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A728Oily Waste Treatment Facility (B553) AnalysisThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Oily Waste Treatment Facility Analysis at B-553 to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A729Unit Priced Labor Work - MUST BE NEGOTIATED BY KOProvide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS.
A730Material Costs- MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A729. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.
A731Freeze Protection WastewaterThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Freeze Protection Wastewater Analysis in various locations to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A732Oily Waste Treatment Facility (B553) AnalysisThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for a Oily Waste Treatment Facility Analysis at B-553 to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A733MISC Other - (Boat Wash Rack, Water Jet Cutter, Storm CB Decant, FROT)The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for MISC GP - Other Category to ensure the installation complies with EPA and state requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A734Acute Aquatic Toxicity (LC50)The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A735Aluminum (Al), TotalThe Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A736Chemical Oxygen Demand (COD)The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A737Chloride (Cl)The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A738Copper (Cu), TotalThe Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A739Cyanide, Total (CN)The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A740EnterococciThe Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A741Fecal ColiformThe Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A742Iron (Fe), TotalThe Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A743Lead (Pb), TotalThe Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A744Nitrate, as NThe Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A745Oil & Grease, TotalThe Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A746Phosphorus (P), TotalThe Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A747Total Kjeldahl Nitrogen (TKN)The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A748Total Suspended Solids (TSS)The Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A749Zinc (Zn), TotalThe Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A750pHThe Contractor shall perform laboratory services and associated reporting requirements for a Stormwater discharge to ensure the installation complies with EPA and state requirements. MUST BE USED IN CONJUCTION WITH ELIN(S) A751 and A753 or a combination of A751, A752 and A753.
A751Transportation of SamplesPick up and transport samples to testing facilities for ELINS A734 through A750
A752Sample CollectionThe Contractor shall perform sample collection for ELINS A734 through A750
A753Storm Water ProcessThe Contractor shall perform scheduling of laboratory services and associated reporting requirements for environmental Stormwater samples for ELINS A734 through A750
A754B449 HydrocollatorThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A755Fats, Oils and Grease (FOG)The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A756MISC Air Compressor CondensateThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A757MISC Commercial LaundryThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A758MISC Contact Cooling and Heating WaterThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A759MISC Food Processing (B175 Refer Boxes)The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A760MISC GW & SW Inf (Utility MH)The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A761MISC Hydrostatic Pressure Testing Wastewater (B478)The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A762MISC NCCW & Ice MachineThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A763MISC Table 5-1The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A764MISC Water Treatment - (RO Concentrate / Water Softeners / Resin Polishers / GAC Filters)The Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A765Drinking Water: TCRThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A766Drinking Water: Lead in Priority AreasThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A767Drinking Water: Lead in Priority Areas - Follow-upThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements. Samples are collected within five working days of notification. See Discharge Data List: Attachment J-1800000-05.
A768MS4 Stormwater Illicit Discharge Detection and Elimination ScreeningThe Contractor shall perform environmental sampling, field testing, laboratory services, and associated reporting requirements for MS4 Stormwater Illicit Discharge Detection and Elimination Screening at 5 Stormwater outfalls as directed. Samples are collected during a rain event of greater than equal to 0.10 inches of rain. See Discharge Data List: Attachment J-1800000-05.

&R&G

Recurring Work OPT YR 1

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40085-x-xx-xxxx
EXHIBIT A - CLIN 0003
Line Item 0003 Recurring Work - 1st Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - Recurring Work Price - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs B001
ELIN / Sub ELINDESCRIPTIONQTYUnit of IssueUnit PriceTotal
B001- REGION Spec Item 3
B001AAAuxiliary Seawater System Wastewater12MO$ 479$ 5,743.61
B001ABBallast Tank Wastewater12MO$ 4,272$ 51,268.70
B001ACStormwater Pontoon Deck Runoff at Wet Well12MO$ 757$ 9,089.57
B001ADHydrostatic Pressure Testing Wastewater (B478)12MO$ 326$ 3,912.62
B001AEFuel Operations Secondary Containment Treatment Wastewater (B549)12MO$ 525$ 6,295.94
B001AFStormwater O-612MO$ 347$ 4,167.68
B001AGStormwater O-6 (Tox)12MO$ 116$ 1,387.71
B001AHStormwater O-6 (Bac)12MO$ 73$ 871.88
B001AJStormwater O-712MO$ 343$ 4,112.76
B001AKStormwater O-7 (Tox)12MO$ 116$ 1,387.71
B001ALStormwater O-7 (Bac)12MO$ 73$ 871.88
B001AMStormwater O-1512MO$ 340$ 4,074.56
B001ANStormwater O-15 (Tox)12MO$ 116$ 1,387.71
B001APStormwater O-15 (Bac)12MO$ 73$ 871.88
B001AQStormwater O-1712MO$ 343$ 4,112.76
B001ARStormwater O-17 (Tox)12MO$ 116$ 1,387.71
B001ASStormwater O-17 (Bac)12MO$ 73$ 871.88
B001ATStormwater O-22A12MO$ 343$ 4,112.76
B001AUStormwater O-22A (Tox)12MO$ 116$ 1,387.71
B001AVStormwater O-22A (Bac)12MO$ 73$ 871.88
B001AWStormwater O-2712MO$ 343$ 4,112.76
B001AXStormwater O-27 (Tox)12MO$ 116$ 1,387.71
B001AYStormwater O-27 (Bac)12MO$ 73$ 871.88
B001AZStormwater O-35-112MO$ 334$ 4,012.45
B001BAStormwater O-35-1 (Tox)12MO$ 116$ 1,387.71
B001BBStormwater O-35-1 (Bac)12MO$ 73$ 871.88
B001BCStormwater O-3612MO$ 337$ 4,038.72
B001BDStormwater O-36 (Tox)12MO$ 116$ 1,387.71
B001BEStormwater O-36 (Bac)12MO$ 73$ 871.88
B001BFMISC Cutting & Grinding - (Dental Grinding Wheel)12MO$ 109$ 1,306.51
B001BGMISC Tumbling Cleaning - (Parts Cleaner)12MO$ 109$ 1,306.51
B001BHMISC Other - (Boat Wash Rack)12MO$ 111$ 1,337.56
B001BJB449 Hydrocollator12MO$ 99$ 1,189.50
B001BKFreeze Protection Wastewater12MO$ 294$ 3,528.42
B001BLFire Hydrant Test Wastewater12MO$ 255$ 3,061.86
B001BMMISC Boiler Blowdown (Boiler # 1S/4)12MO$ 378$ 4,540.57
B001BNMISC Boiler Blowdown (Boiler # 6)12MO$ 378$ 4,540.57
B001BPOil Water Separation Treatment Wastewater (B029, Rec Tank)12MO$ 5,298$ 63,577.62
B001BQOily Waste Treatment Facility (B553)12MO$ 3,559$ 42,711.83
B001BRUtility Trench Water, B29 North (at L10)12MO$ 720$ 8,639.97
B001BSUtility Trench Water, B29 South (at L11)12MO$ 727$ 8,720.60
B001BTMISC Water Treatment - (GAC Filters)12MO$ 109$ 1,312.51
B001BUMISC Water Treatment - (RO Concentrate )12MO$ 237$ 2,838.33
B001BVMISC Water Treatment - ( Water Softeners)12MO$ 237$ 2,838.33
B001BWMISC Water Treatment - (Resin Polishers)12MO$ 412$ 4,948.63
B001BXUtility Trench De-watering Wastewater (B077, U04)12MO$ 505$ 6,058.78
B001BYUtility Trench De-watering Wastewater (B434 North)12MO$ 651$ 7,808.22
B001BZDrinking Water: Lead and Copper Main Base12MO$ 2,731$ 32,774.69
B001CADrinking Water: Lead and Copper Polaris Park12MO$ 683$ 8,193.67
B001CBDrinking Water: Lead and Copper Nautilus Park12MO$ 2,731$ 32,774.69
B001CCDrinking Water: Lead and Copper Conning Towers12MO$ 1,366$ 16,387.35
B001CDDrinking Water: Lead and Copper Trident Park12MO$ 1,366$ 16,387.35
B001CEDrinking Water: Stage 2 Disinfectant Main Base12MO$ 418$ 5,011.65
B001CFDrinking Water: Stage 2 Disinfectant Polaris Park12MO$ 418$ 5,011.65
B001CGDrinking Water: Stage 2 Disinfectant Nautilus Park12MO$ 418$ 5,011.65
B001CHDrinking Water: Stage 2 Disinfectant Conning Towers12MO$ 418$ 5,011.65
B001CJDrinking Water: Stage 2 Disinfectant Trident Park12MO$ 418$ 5,011.65
B001CKDrinking Water: TCR Main Base12MO$ 4,554$ 54,653.14
B001CLDrinking Water: TCR Polaris Park12MO$ 455$ 5,465.31
B001CMDrinking Water: TCR Nautilus Park12MO$ 1,822$ 21,861.26
B001CNDrinking Water: TCR Conning Towers12MO$ 455$ 5,465.31
B001CPDrinking Water: TCR Trident Park12MO$ 911$ 10,930.63
B001CQSteam Condensate Wastewater, Cond. Rtn. Collection Tank Overflow12MO$ 1,786$ 21,433.04
TOTAL RECURRING WORK PRICE - Option Period One$ 548,782.56

&R&G

NAVFAC UOMs

ACAcreFRFramePDPad
AMAmpouleFTFootPGPackage
ATAssortmentFVFivePIPillow
AYAssemblyFYFiftyPMPlate
BABallGGGreat GrossPRPair
BDBundleGIGillPTPint
BEBaleGLGallonPXPellet
BFBoard FootGMGramPZPacket
BGBagGNGrainQTQuart
BKBookGPGroupRARation
BLBarrelGRGrossRDRound
BOBoltHDHundredRLReel
BQBriquetHFHundred FeetRMReam
BRBarHKHankRORoll
BTBottleHPHundred PoundsRXThousand Rounds
BXBoxHRAnnually (Dec)SBSquare Mile
CACartridge3HSMonthly (Jan,Feb,Mar)SCSquare Centimeters
CBCarboyHWHundred WeightSDSkid
CCCubic CentimeterHYHundred YardsSESet
CDCubic YardINInchSFSquare Foot
CEConeJRJarSHSheet
A701CentigramKMKilometerSKSkein
A702Cubic InchKRCaratSLSpool
A703CoilLBPoundSOShot
A704CentimeterLFLinear FootSPStrip
A705CanLGLengthSQSquare
A706ContainerLHLabor HoursSXStick
A707CurieLILiterSYSquare Yard
CYCylinderLMLinear MeterTCTruckload
CZCubic MeterLOLotTDTwenty-Four
DADaysLSLump SumTETen
DCDecagramLYLinear YardTFTwenty-Five
DEDecimeterMCThousand Cubic FeetTGGross Ton
DGDecigramMEMealTNTon
DLDeciliterMFThousand FeetTOTroy Ounce
DMDramMGMilligramTSThirty-Six
DODollarsMIMileTTTablet
DRDrumMLMilliliterTUTube
DWPennyweightMMMillimeterUNUnit
DZDozenMOMonthsUSUS U.S.P Unit
EAEachMRMeterVIVial
ENEach CollectionMXThousandWKWeek
EXExposureOTOutfitYDYard
FDFoldOZOunceYRYears