This is a sample cost proposal template for construction engineering and inspection contracts used by the County of Tuolumne in California for on-call or as-needed architectural and engineering services. The template is designed to capture specific rates of compensation for named personnel and job classifications, including project managers, civil engineers, construction inspectors, claims engineers, land surveyors, and technicians. The document provides space for hourly billing rates across straight time, overtime at 1.5x, and overtime at 2x multipliers, with effective date ranges for rate changes spanning multiple years. Key personnel must be identified with an asterisk, and employees subject to prevailing wage requirements must be marked with two asterisks. The template includes sections for calculating indirect cost rates (fringe benefits and general and administrative costs) and markup limitations, with billing rates determined by multiplying the actual hourly rate by one plus the indirect cost rate and one plus the fee percentage.

The cost proposal template requires detailed itemization of other direct costs with quantities, unit costs, and total costs, along with documentation supporting the competitiveness and necessity of proposed items. Travel-related costs, mileage, and vehicle rental must comply with State Department of Personnel Administration rules and require pre-approval by the contracting agency. All costs must comply with Federal cost principles under 48 Code of Federal Regulations Part 31, Title 23 United States Code Section 112, and applicable state requirements. The document requires certification by an executive or financial officer at the level of Vice President or Chief Financial Officer, and all costs must be applied consistently and fairly across all contracts. Subconsultants must provide their own separate cost proposals, and the template format cannot be amended.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAMPLE COST PROPOSAL

Sample Only - Required Cost Proposal Template To Be Determined By Agency

SAMPLE COST PROPOSAL 2

SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS)

(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)

Note: Mark-ups are Not Allowed

Consultant __________________ D Prime Consultant D Subconsultant D 2nd Tier Subconsultant

Project No. _________ _ Contract No.

Contract Amount $ - --- Date

For Combined Rate Fringe Benefit% + General &Administrative% = Combined ICR%

OR

For Home Office Rate

Fringe Benefit% + General &Administrative% = Home Office ICR%

For Field Office Rate Frinqe Benefit% + General &Administrative% = Field Office ICR%

= Fee %

BILLING INFORMATION CALCULATION INFORMATION

Name/Job Title/Classification1 Hourly Billing Rates2

Straight3 OT(1.5x) OT(2x) Effective Date of Hourly Rate

From To Actual or Avg.

Hourly Rate4

% or$ Increase

Hourly Range-for Classifications Only

John Doe- Project Manager* Civil Engineer II

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

01/01/2016 01/01/2017 01/01/2018

12/31/2016 12/31/2017 12/31/2018

$0.00 $0.00 $0.00

0.0% 0.0%

Not Applicable

Sue Jones- Construction Engineeri1nspector Engineer I

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

01/01/2016 01/01/2017 01/01/2018

12/31/2016 12/31/2017 12/31/2018

$0.00 $0.00 $0.00

0.0% 0.0%

Not Applicable

Buddy Black - Claims Engineer Engineer Ill

Land Surveyor **

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

01/01/2016 01/01/2017 01/01/2018

01/01/2016 01/01/2017 01/01/2018

12/31/2016 12/31/2017 12/31/2018

12/31/2016 12/31/2017 12/31/2018

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

0.0% 0.0%

0.0% 0.0%

Not Applicable

$00-$00 $00-$00 $00-$00

Technician $0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

01/01/2016 01/01/2017 01/01/2018

12/31/2016 12/31/2017 12/31/2018

$0.00 $0.00 $0.00

0.0% 0.0%

$00-$00 $00-$00 $00-$00

(Add pages as necessary)

I

I

SAMPLE COST PROPOSAL

Sample Only - Required Cost Proposal Template To Be Determined By Agency

NOTES:

1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**).All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.

2. The cost proposal format shall not be amended.

3. Billing rate= actual hourly rate * (1+ ICR) * (1+ Fee). Indirect cost rates shall be updated on an annual basis in accordance with the consultants annual accounting period and established by a cognizant agency or accepted by Caltrans. All costs must comply with the Federal cost principles for reimbursement.

4. For named employees and key personnel enter the actual hourly rate. For classifications only, enter the Average Hourly Rate for that classification.

SAMPLE COST PROPOSAL 2

SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS)

(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)

Consultant ___________________ □ Prime Consultant □ Subconsultant

Project No. __________ _ Contract No.

Date _________

SCHEDULE OF OTHER DIRECT COST ITEMS (Add additional pages as necessary) Description of Item Quantity Unit Unit Cost Total

Subconsultant 1:

Subconsultant 2:

Subconsultant 3:

Subconsultant 4:

Subconsultant 5:

Note: Add additional pages if necessary.

NOTES:

1. List other direct cost items with estimated costs. These costs should be competitive in their respective industries and supported with appropriate documentation.

2. Proposed ODC items should be consistently billed regardless of client and contract type.

3. Items when incurred for the same purpose, in like circumstance, should not be included in any indirect cost pool or in the overhead rate.

4. Items such as special tooling, will be reimbursed at actual cost with supporting documentation (invoice).

5. Items listed above that would be considered "tools of the trade" are not reimbursable as other direct cost

6. Travel related costs should be pre-approved by the contracting agency and shall not exceed current State Department of Personnel Administration rules.

SAMPLE COST PROPOSAL

Sample Only - Required Cost Proposal Template To Be Determined By Agency

7. If mileage is claimed, the rate should be properly supported by the consultant's calculation of their actual costs for company vehicles. In addition, the miles claimed should be supported by mileage logs.

8. If a consultant proposes rental costs for a vehicle, the company must demonstrate that this is its standard procedure for all of their contracts and that they do not own any vehicles that could be used for the same purpose.

9. The cost proposal format shall not be amended. All costs must comply with the Federal cost principles.

10. Add additional pages if necessary.

11. Subconsultants must provide their own cost proposals.

SAMPLE COST PROPOSAL

Sample Only - Required Cost Proposal Template To Be Determined By Agency

SAMPLE COST PROPOSAL 2

Certification of Direct Costs:

I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:

7. Generally Accepted Accounting Principles (GAAP)

8. Terms and conditions of the contract

9. Title 23 United States Code Section 112 - Letting of Contracts

10. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures

11. 23 Code of Federal Regulations Part 172 - Procurement, Management, and

Administration of Engineering and Design Related Service

12. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable)

All costs must be applied consistently and fair1y to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements.

Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.

Prime Consultant or Subconsultant Certifying:

Name: ______________ _ Title*:

Signature: _ Date of Certification (mm/dd/yyyy):

Email: Phone Number: __________ __

Address:

* An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.

List services the consultant is providing under the proposed contract:

https://www.gpo.gov/fdsys/pkg/USCODE-2011-title23/pdf/USCODE-2011-title23-chap1-sec112.pdf http://www.ecfr.gov/cgi-bin/text-idx?SID=7d7984e723af183358e1cb797a78877f&mc=true&node=sp48.1.31.31_12&rgn=div6 http://www.ecfr.gov/cgi-bin/text-idx?rgn=div5&node=23:1.0.1.2.3 https://www.gpo.gov/fdsys/pkg/CFR-2010-title48-vol7/xml/CFR-2010-title48-vol7-part9904.xml

C2:
PC2: Off
Sc2: Off
2TS2: Off
H2PN2:
CN2:
PA2:
D2:
H2I1: Mileage Costs
H2I6: Vehicle
H2I2: Equipment Rental and Supplies
H2I3: Permit Fees
H2I4: Plan Sheets
H2I5: Test
C3:
CN3:
H2Q1:
H2U1:
H2UC1:
H2T1: 0
H2Q2:
H2U2:
H2UC2:
H2T2: 0
H2Q3:
H2U3:
H2UC3:
H2T3: 0
H2Q4:
H2U4:
H2UC4:
H2T4: 0
H2Q5:
H2U5:
H2UC5:
H2T5: 0
H2Q6:
H2U6:
H2UC6:
H2T6: 0
H2S1:
H2SC1:
H2S2:
H2SC2:
H2S3:
H2SC3:
H2S4:
H2SC4:
H2S5:
H2SC5:
D3:
H2PN3:
PC3: Off
Sc3: Off
T2: 0
N2:
PN2:
Email2:
DOC2:
Addr2:
LS2:

File details come from the government source that posted it. Updated .