Sample_Contract_Exhibit_E1_and_E2_Drawings.pdf

PDF 14 MB Posted

Attached to
2026-954 Itasca SP Commercial Washers and Dryers
Solicitation number
2000018459
Issued by
Isanti County, Minnesota

About this file

Summary

This file contains technical drawings and specifications (Exhibits E1 and E2) for Solicitation No. 2026-777-8P507, issued by the Minnesota Department of Natural Resources for the purchase and installation of commercial washers and dryers at Itasca State Park. The project involves procuring two commercial-grade washer-extractors and two commercial-grade dryers with external soap dispensers, along with delivery, placement, installation, connection to existing utility services, startup testing, and staff training. The scope includes electrical, mechanical, and plumbing work as documented in comprehensive construction drawings with specifications across multiple divisions including earthwork, electrical systems, lighting, and interior finishes. The equipment must be durable for high-frequency commercial use in a public facility and must fit within the specifically designed space without requiring construction modifications. The laundry facility is currently under construction, and no site visits are available. Training and equipment manuals must be provided to designated State staff prior to work acceptance. All responses must be submitted electronically through the Swift Portal, with failure to respond to the latest event version potentially resulting in bid rejection.

The contractor shall ensure all installation work complies with applicable codes, manufacturer requirements, and State safety standards. The project includes provision of OEM Manufacturer's Warranty with an option to provide extended warranty coverage after OEM warranty expiration. The drawings indicate integration with existing utility infrastructure including electrical panels (200-amp recessed panel installation), GFCI receptacles, mechanical systems with heat recovery ventilation, and plumbing connections. The technical drawings referenced include structural details, architectural elevations, mechanical and plumbing plans with schedules, and comprehensive electrical layouts showing power distribution, lighting plans, and equipment locations throughout the facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2026-954 Itasca State Park Commerical Washers and Dryers

Exhibits E1 and E2

Drawings and Technical Specifications

Provided for informational purposes only.

Solicitation No. 2026-777-8P507

500K Latest Revision: 01/13/2026 DIVISION 00 - 6 Current Date: 5/11/26

26 05 33 Raceways and Boxes for Electrical Systems 26 05 44 Sleeves and Sleeve Seals for Electrical Raceways and Cabling 26 05 53 Identification for Electrical Systems 26 09 23 Lighting Control Devices 26 24 16 Panelboards 26 27 26 Wiring Devices 26 28 16 Enclosed Switches and Circuit Breakers 26 51 00 Interior Lighting 26 56 19 LED Exterior Lighting

DIVISION 31 EARTHWORK

31 20 00 Earth Moving

APPENDIX

45 lb. Washer Pad Manufacturer Instructions (for reference)

SCHEDULE OF DRAWINGS

Sheet No. Sheet Title or Description

G100 COVER SHEET

G101 CODE ANALYSIS

S-001 STRUCTURAL NOTES & DETAILS

A001 SYMBOLS & ABBREVIATIONS

A101 DEMOLITION PLANS

A102 DEMOLITION PLANS

A103 CONSTRUCTION PLANS

A104 CONSTRUCTION PLANS

A201 EXTERIOR DEMOLITION ELEVATIONS

A202 EXTERIOR CONSTRUCTION ELEVATIONS

A401 INTERIOR ELEVATIONS & SECTIONS

A402 INTERIOR ELEVATIONS & SECTIONS

A403 INTERIOR ELEVATIONS & SECTIONS

A501 CONSTRUCTION DETAILS

A502 CONSTRUCTION DETAILS

A503 CONSTRUCTION DETAILS

A601 DOOR & WINDOW SCHEDULES

A602 FF&E SCHEDULES

I601

FPM01

M101 M301 M601 M801 M802 M803

P100 P101 P200 P201 P501 P801

E001 E101 E201 E301 E401 E801 E802

FURNITURE SCHEDU(LE FOR REFERENCE ONLY)

MECHANICAL SYMBOLS & LEGEND SHEET

FIRST FLOOR MECHANICAL DEMOLITION PLAN

FIRST FLOOR VENTILATION PLAN

MECHANICAL DET AILS

MECHANICAL SCHE DULES

MECHANICAL COMCHECK SHEET 1

MECHANICAL COMCHECK SHEET 2

UNDERGROUND DEMOLITION PLUMBING PLAN

FIRST FLOOR DEMOLITION PLAN

UNDERGROUND PLUMBING PLAN

FIRST FLOOR PLUMBING PLAN

RISERS

PLUMBING SCHEDULES AND DETAILS

ELECTRICAL LEGEND

DEMOLITION PLAN

POWER PLAN

LIGHTING PLAN

SYSTEMS PLAN

LIGHTING SCHEDULES & DETAILS

MOTOR & EQUIPMENT SCHEDULE & RISER

Amy Meller Highlight

Amy Meller Highlight

Amy Meller Highlight

Amy Meller Highlight

Amy Meller Highlight

Amy Meller Highlight

Amy Meller Highlight

Amy Meller Highlight

Amy Meller Highlight

Amy Meller Highlight

Amy Meller Highlight

Amy Meller Highlight

Amy Meller Highlight

Rectangle

Rectangle

4/23/2026 10:11

N

04 ADDENDUM #2 6/8/2026

AND CONSTRUCTION.

3"

�4

53�

�����������������
�������
����� !"#�!����$%��& "'
������
� ,-�#�,����.���-�/�-����/�
�(�)*�+��)

������ 0��/-�

/� .���-�/�-�� ��/� #-0� #�

� ����/�0

�����������������
�������
������������ �
�����
��������������)����
���
����������)�����
�����������������
�������

�**�0*-123�20.45654-,5+123�4+708,.9�65*.23�65.*:�:-,-3�1+,.2� -1:�+,;.9�:+487.1,2�-1:�512,987.1,2�09.0-9.:�<=������ -2�512,987.1,2�+6�2.9>54.�2;-**�9.7-51�,;.�09+0.9,=�+6� ����(������2;-**�9.,-51�-**�4+77+1�*-?3�2,-,8,+9=�-1:� +,;.9�9.2.9>.:�95@;,23�514*8:51@�,;.�4+0=95@;,�,;.9.�,+(

>5

5+

��������A

�B

�������$��A� �����

������ !"� ����#$��%�!&�
������
� ��,��-����,���
�.�-��/�
���$ ��������
� ���
�����������������
�������

#2

�����������������
�������

���� ,�-��� -�� �+�.�$�/��0��#+�������

�1)��2������*���

� �3"� �����"�*��#$3+4�*�5+

5�!*���

� $���5"�

�����������������
�������

HRV-1

E201

POWER FLOOR PLAN

1/8" = 1'-0"

L1(7)

L1(18)

L1(5) L1(5) 42"

L1(12)L1(16) 44"

L1(18) L1(18)

L1(3)

L1(14)

L1(24) L1(26)

L1(16)

L1(28)

L1(20)

L1(22)

L1(27)

6 4

L1(9)

42"/GFCI

L1(5)

84"

L1(11)

42"/GFCI

L1(28)

42"/GFCI

L1(14)

L1(5) 15"

L1(2)

44"/GFCI

L1(5)42"

L1(30)

WH-1

L1(29)

JF-1

DF AC

L1(21,23,25)

HP-1

L1(3)L1(3)L1(3)

J

L1(4,6) L1(8,10) L1(13,15) L1(17,19)

L1(16)

L1(22)

WP

L1(5)

L1(5)

M

L1(26)

L1(3) L1(3)

L1(1)

HRV-1

EH

3.0

All plans, specifications, computer files, field data, notes and other documents and instruments prepared by EAPC as instruments of service shall remain the property of EAPC. EAPC shall retain all common law, statutory and other reserved rights, including the copyright thereto.

E201

CD 9/12/2025

TELE FAX

REFERENCE NOTES:

CEILING MOUNTED RECEPTACLE LOCATION FOR REFERENCE ONLY. COMMUNICATE WITH

OWNER FOR EXACT LOCATION

RECEPTACLE TO BE EXACTLY 6'-5" FROM EXTERIOR WALL.

REFRIGERATOR RECEPTACLE TO BE FED FROM LOAD SIDE OF DEADFRONT GFCI

RECEPTACLE ON CIRCUIT.

NEW 200A RECESSED PANEL TO BE INSTALLED.

PROVIDE CONDUIT STUB FOR POWER TO NEW FLOOR BOX LOCATION.

GENERAL NOTES:

A. COORDINATE MOUNTING HEIGHTS AND LOCATIONS FOR ALL WALL MOUNTED

ELECTRICAL DEVICES WITH ARCHITECTURAL ELEVATIONS. COORDINATE ALL CEILING

MOUNTED ELECTRICAL DEVICES WITH ARCHITECTURAL REFLECTED CEILING PLAN.

B. RECONNECT ANY LIGHTING OR POWER CIRCUIT INADVERTENTLY DISCONNECTED BY

DEMOLITION.

C. LABEL ALL DEVICES, INCLUDING SWITCHES, TO INDICATE PANEL AND CIRCUIT. USE

ADHESIVE MYLAR TYPE.

D. PROVIDE ALL DEVICES AND ASSOCIATED WIRING AS SHOWN.

E. NEW RACEWAYS IN EXISTING AREA ARE INTENDED TO BE CONCEALED WITHIN THE

WALLS. PATCHING IS REQUIRED. SEE ARCHITECTURAL.

44645

Signature:

Print Name:

Date: License #:

Cory Vaughn

06/08/2026

#2

#5 Sample Contract Exhibit E1 2026-777-8P507 Project Manual Final - Excerpts
#6 Sample Contract Exhibit E2 LD22_200RoomHotel_UM-TechnicalDrawing_en-US-CA
200 Room Hotel (Select Service) Technical PG1
200 Room Hotel (Select Service) Technical PG2
200 Room Hotel (Select Service) Technical PG3
200 Room Hotel (Select Service) Technical PG4

Blank Page