Sample Contract 9415 Hazard Tree Trimming.pdf

PDF 249 KB Posted

Attached to
ITB 9415 Hazard Tree Trimming and Felling at Jessie M. Honeyman Memorial State Park
Solicitation number
S-63400-00005842
Issued by
Lane County, Oregon

About this file

This document is a Services Contract between the State of Oregon, acting through its Oregon Parks and Recreation Department (OPRD), and a contractor for Hazard Tree Services at the Jessie M. Honeyman Memorial State Park. The contract requires the contractor to perform hazard tree trimming, felling, and related services on an as-needed basis within the specified park location. The contract has an effective date of February 2023 and terminates on March 2024, with the possibility of extension.

The contract specifies the contractor's obligations, including performing the work safely and to industry standards, coordinating with OPRD, and repairing any damage to OPRD property. It also outlines OPRD's responsibilities, such as responding to work requests and providing access to the work sites. The contractor must maintain various insurance coverages, including commercial general liability and automobile liability insurance, as detailed in the contract. Pricing for the services is set at a not-to-exceed amount of $20,000.

View the file

Other files

File Type Posted
9415 Bid Tab.xlsx XLSX spreadsheet
ITB 9415 Hazard Tree Services.pdf PDF
Questions and Answers~2.pdf PDF
Intent to Award OregonBuys~1.pdf PDF
Bid tabulation~6.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF OREGON

PARKS AND RECREATION DEPARTMENT

SERVICES CONTRACT #9415

Hazard Tree Services

This Contract for Services (this “Contract”) is by and between the State of Oregon, acting through its Oregon Parks and Recreation Department, (“OPRD”) and ________, a [_______][ (“Contractor”) and is effective as of the Effective Date.

Contractor’s Contract Administrator for this Contract is:

Name and Title **Address

**City, State ZIP Phone: (xxx) xxx-xxxx

Fax: (xxx) xxx-xxxx anyname@yahoo.com

Agency's Contract Administrator for this Contract is:

Ryan Warren, Park Manager Oregon Parks and Recreation

84505 HWY 101

Florence OR 97439 Phone: (541) 997-3851 ryan.warren@oprd.oregon.gov

Either party may change its Contract Administrator by providing the other notice in compliance with Section

17.6 of this Contract.

1. Contract Term. The “Effective Date” of this Contract is the later of (i) February xx, 2023 or (ii) the date this Contract has been fully executed by each party and, approved as required by applicable law. Unless extended or terminated earlier in accordance with its terms, this Contract terminates on March xx, 2024. The termination of this Contract will not extinguish or prejudice OPRD’s right to enforce this Contract with respect to any default by Contractor that has not been cured.

2. Contract Documents. This Contract consists of the following documents, which are listed in descending order of precedence:

2.1. this Contract less all exhibits;

2.2. Exhibit A (Statement of Work);

2.3. Exhibit B (Required Insurance), and

The foregoing documents and Exhibits are attached hereto and made a part of the Contract by this reference.

3. Services.

mailto:anyname@yahoo.com mailto:ryan.warren@oprd.oregon.gov

3.1. Performance of Services. Contractor shall perform the services (the “Services”) and deliver to OPRD the deliverables (“Deliverables”) set forth in Exhibit A, the Statement of Work (the “Statement of Work”). The Statement of Work includes the delivery schedule for the Deliverables and Services. Contractor shall perform the Services in accordance with the terms and conditions of this Contract.

3.2. Submission and Acceptance of Deliverables.

3.3. Rejection of Deliverables; Corrections. If OPRD determines that a Deliverables does not have the characteristics or otherwise meet the acceptance criteria set forth in the Statement of Work in all material respects, OPRD will notify Contractor in writing of OPRD’s rejection of the Deliverables, and describe in reasonable detail in such notice the Agency’s basis for rejection of the Deliverables. Upon receipt of notice of non-acceptance, Contractor shall, within the time period specified in OPRD’s notice, modify or improve the Deliverables at Contractor’s sole expense so that the Deliverables meets the characteristics and requirements described in the Statement of Work.

4. Compensation.

4.1. Not to Exceed Compensation. The maximum, not-to-exceed compensation payable to Contractor under this Contract, which includes any allowable expenses, is $20,000.00 OPRD will not pay Contractor any amount in excess of the not-to-exceed compensation of this Contract, and will not pay for Services performed before the Effective Date or after the expiration or termination of this Contract. If the maximum compensation is increased by amendment of this Contract, the amendment must be fully effective before Contractor performs Services subject to the amendment.

4.2. Payments. Payments, including interim payments, to Contractor are subject to ORS 293.462, will be made only for completed and accepted Deliverables and Services, and will be made in accordance with the payment schedule and requirements set forth in Exhibit A.

4.3. Invoices. Contractor shall submit invoices to Agency as set forth in the Statement of Work or, if not set forth therein, to Agency’s Contract Administrator. Contractor may submit invoices in accordance with the payment schedule set forth in the Statement of Work or, if no payment schedule is set forth therein, then no more frequently than once per month for accepted Deliverables and Services The invoices must describe all Services performed with particularity, including the dates Contractor performed the Services for which it is requesting payment, and by whom the Services were performed and shall itemize and explain all expenses that this Contract requires OPRD to pay and for which Contractor claims reimbursement.

4.4. Expenses. Agency will not pay or reimburse any expenses incurred by Contractor during the completion of the Services except as authorized in the Statement Work or elsewhere in this Contract. Any such authorized travel expenses must comply with the Oregon Travel Policy available on the Internet at:

http://www.oregon.gov/das/cfo/sars/policies/oam/40.10.00.pdf

4.5. Funds Available and Authorized. Contractor will not be compensated for Services performed under this Contract by any agency or department of the State of Oregon other than OPRD. OPRD believes it has sufficient funds currently available and authorized for expenditure to make payments under this Contract within Agency’s biennial appropriation or limitation. Contractor understands and agrees that OPRD’s payments under this Contract are contingent on OPRD receiving appropriations, limitations, or other expenditure authority sufficient to allow OPRD, in the exercise of its reasonable administrative discretion, to continue to make payments under this Contract.

http://www.oregon.gov/das/cfo/sars/policies/oam/40.10.00.pdf

5. State Premises. Contractor and Contractor staff shall comply with all policies, rules, procedures, and regulations established by OPRD and the State for access to and activities in and around premises controlled by OPRD or any other agency of the State.

6. Independent Contractor; Responsibility For Taxes And Withholding

6.1. Independent Contractor. Contractor shall perform all Services as an independent contractor. OPRD reserves the right (i) to determine and modify the delivery schedule for the Services and (ii) to evaluate the quality of the Services; however, OPRD may not and will not control the means or manner of Contractor's performance. Contractor is responsible for determining the appropriate means and manner of performing the Services.

6.2. No Conflicts. Contractor, by signature to this Contract, represents and warrants that Contractor’s performance of the Services under this Contract creates no potential or actual conflict of interest as defined by ORS 244; and no statutes, rules or regulations of any State of Oregon or federal agency for which Contractor currently performs work would prohibit Contractor from performing the Services under this Contract.

6.3. Affiliation. Contractor understands and agrees that it is not an "officer," "employee," or "agent" of the State of Oregon, as those terms are used in ORS 30.265 or otherwise.

6.4. Taxes and Benefits. Contractor is responsible for all federal or state taxes applicable to compensation or payments paid to Contractor under this Contract and, unless required by applicable law, OPRD will not withhold from such compensation or payments any amount to cover Contractor's federal or state tax obligations. Contractor is not eligible for any social security, unemployment insurance or workers' compensation benefits from compensation or payments paid to Contractor under this Contract, except as a self-employed individual.

7. Subcontracts, Successors, And Assignments

7.1. Subcontracts. Contractor shall not enter into any subcontracts for any of the Services required by this Contract without OPRD's prior written consent. In addition to any other provisions OPRD may require, Contractor shall include in any permitted subcontract under this Contract provisions to ensure that OPRD will receive the benefit of subcontractor’s performance as if the subcontractor were Contractor. OPRD’s consent to any subcontract does not relieve Contractor of any of its duties or obligations under this Contract.

7.2. Successors and Assigns. The provisions of this Contract are binding upon and inure to the benefit of the parties to this Contract, their respective successors, and permitted assigns, if any.

7.3. No Assignment. Contractor shall not assign or transfer any of its rights or delegate its obligations under this Contract without OPRD’s prior written consent.

8. Representations and Warranties.

8.1. Contractor’s General Representations and Warranties. Contractor represents and warrants to OPRD that:

8.1.1. Contractor has the power and authority to enter into and perform this Contract;

8.1.2. This Contract, when executed and delivered, is a valid and binding obligation of Contractor enforceable in accordance with its terms;

8.1.3. Contractor shall, at all times during the term of this Contract, be qualified, professionally competent, and duly licensed to perform the Services;

8.1.4. Contractor prepared its proposal related to this Contract, if any, independently from all other proposers, and without collusion, fraud, or other dishonesty; and

8.1.5. Contractor (to the best of Contractor’s knowledge, after due inquiry), for a period of no fewer than six calendar years preceding the Effective Date, faithfully has complied with:

8.1.6. All tax laws of this state, including but not limited to ORS 305.620 and ORS chapters 316, 317, and 318;

8.1.6.1. Any tax provisions imposed by a political subdivision of this state that applied to Contractor, to Contractor’s property, operations, receipts, or income, or to Contractor’s performance of or compensation for any work performed by Contractor;

8.1.6.2. Any tax provisions imposed by a political subdivision of this State that applied to Contractor, or to goods, services, or property, whether tangible or intangible, provided by Contractor;

8.1.6.3. Any rules, regulations, charter provisions, or ordinances that implemented or enforced any of the foregoing tax laws or provisions; and

8.1.7. Contractor has no undisclosed liquidated and delinquent debt owed to the State or any department or agency of the State.

8.2. Contractor’s Performance Warranties.

8.3. Contractor has the skill and knowledge possessed by well-informed members of its industry, trade or profession and Contractor shall apply that skill and knowledge with care and diligence to perform the Services in a professional manner and in accordance with the highest standards prevalent in Contractor’s industry, trade or profession;

8.4. The Services and each Deliverables delivered by Contractor pursuant to the Services will materially comply with any service descriptions, specifications, standards or requirements set forth in this Contract;

8.5. Except as otherwise provided in this Contract (including Section 9), Contractor shall transfer all Deliverables to OPRD free and clear of any and all restrictions on or conditions of transfer, modification, licensing, sublicensing, direct or indirect distribution, or assignment, and free and clear of any and all liens, claims, mortgages, security interests, liabilities, and encumbrances of any kind; and

8.6. Except as otherwise set forth in this Contract, any subcontractors performing work for Contractor under this Contract have assigned all of their rights in the Deliverables to Contractor or OPRD and no third party has any right, title or interest in any Deliverables supplied to Agency under this Contract.

8.7. Warranties cumulative. The warranties set forth in Section 8 are in addition to, and not in lieu of, any other warranties set forth elsewhere in this Contract.

9. RESERVED

10. RESERVED

11. Indemnity by Contractor.

11.1. Claims. Contractor shall defend, save, hold harmless, and indemnify the State of Oregon and OPRD and their officers, employees and agents from and against all third party claims, suits, actions, losses, damages, liabilities, costs (including attorneys’ fees) and expenses (collectively, "Claims") of any nature whatsoever resulting from, arising out of, or relating to the activities of Contractor or its officers, employees, subcontractors, or agents under this Contract, including but not limited to, unauthorized disclosure of Confidential Information, professional malfeasance, infringement of intellectual property rights, intentional, willful, or wanton wrongful acts, and acts outside the scope of Services set forth in this Contract.

11.2. Legal Counsel. If Contractor is required to defend the State of Oregon or OPRD or their officers, employees or agents under Section 11.1, then Contractor shall select legal counsel reasonably acceptable to the Oregon Attorney General to act in the name of, or represent the interests of, the State of Oregon, OPRD or their officers, employees and agents. Such legal counsel must accept appointment as a special assistant attorney general under ORS chapter 180 before such action or representation. Further, the State of Oregon, acting by and through its Department of Justice, may assume its own defense, including that of its officers, employees and agents, at any time when in the State of Oregon's sole discretion it determines that (i) proposed counsel is prohibited from the particular representation contemplated; (ii) counsel is not adequately defending the interests of the State of Oregon or its officers, employees and agents; (iii) important governmental interests are at stake; or (iv) the best interests of the State of Oregon are served thereby. Contractor's obligation to pay for all costs and expenses includes those incurred by the State of Oregon in assuming its own defense or that of its officers, employees, and agents under (i) and (ii) above.

11.3. Damages to State Property and Employees. Contractor is liable for all Claims for personal injury, including death, damage to real property and damage to tangible and intangible personal property of the State of Oregon or any of its employees, subcontractors or agents resulting from, arising out of, or relating to the intentional, reckless or negligent acts or omissions of Contractor or its officers, employees, subcontractors, or agents under this Contract.

11.4. CONTRACTOR IS NOT AUTHORIZED TO SETTLE OR COMPROMISE ANY CLAIM REFERENCED IN THIS

SECTION WITHOUT THE EXPRESS WRITTEN CONSENT OF OPRD.

12. Limitation of Liabilities.

12.1. EXCEPT FOR LIABILITY ARISING OUT OF OR RELATED TO (i) SECTION 10, OR (ii) SECTION 11, CONTRACTOR’S LIABILITY FOR DAMAGES FOR ANY CAUSE WHATSOEVER SHALL BE LIMITED TO ONE AND

ONE HALF TIMES THE MAXIMUM-NOT-TO-EXCEED AMOUNT OF THIS CONTRACT.

12.2. EXCEPT FOR LIABILITY TO THIRD PERSONS ARISING OUT OF OR RELATED TO (i) SECTION 10, OR (ii) SECTION 11, NEITHER PARTY WILL BE LIABLE TO THE OTHER FOR ANY LOST PROFITS, LOST SAVINGS, OR

PUNITIVE, INDIRECT, EXEMPLARY, CONSEQUENTIAL, OR INCIDENTAL DAMAGES.

13. Insurance. Contractor shall maintain insurance as set forth in Exhibit B.

14. Default; Remedies; Termination.

14.1. Default by Contractor. Contractor will be in default under this Contract if:

14.1.1. Contractor institutes or has instituted against it insolvency, receivership or bankruptcy proceedings, makes an assignment for the benefit of creditors, or ceases doing business on a regular basis; or

14.1.2. Contractor no longer holds a license or certificate that is required for Contractor to perform its obligations under the Contract and Contractor has not obtained such license or certificate within 14 calendar days after OPRD’s notice or such longer period as OPRD may specify in such notice; or

14.1.3. Contractor commits any material breach or default of any covenant, warranty, obligation, certification, or agreement under this Contract, fails to perform the Services under this Contract within the time specified herein or any extension thereof, or so fails to pursue the Services as to endanger Contractor's performance under this Contract in accordance with its terms, and such breach, default or failure is not cured within 14 calendar days after OPRD's notice, or such longer period as OPRD may specify in such notice; or

14.1.4. Contractor has liquidated and delinquent debt owed to the State of Oregon or any department or agency of the State.

14.2. OPRD’s Remedies for Contractor’s Default. In the event Contractor is in default under Section 14.1, OPRD may, at its option, pursue any or all of the remedies available to it under this Contract and at law or in equity, including, but not limited to:

14.2.1. Termination of this Contract under Section 14.6.2; or

14.2.2. Withholding all monies due for Services and Deliverables that Contractor has failed to deliver within any scheduled completion dates or has performed inadequately or defectively; or

14.2.3. Initiation of an action or proceeding for damages, specific performance, or declaratory or injunctive relief; or

14.2.4. Exercise of its right of setoff, and withholding of amounts otherwise due and owing to Contractor, without penalty; or

14.2.5. Undertaking collection by administrative offset, or garnishment if applicable, of all monies due for Services and Deliverables to recover liquidated and delinquent debt owed to the State of Oregon or any department or agency of the State. Offsets or garnishment may be initiated after the Contractor has been given notice if required by law.

14.3. Remedies Cumulative. The remedies set forth in Section 14.2 are cumulative to the extent the remedies are not inconsistent, and OPRD may pursue any remedy or remedies singly, collectively, successively or in any order whatsoever. If a court determines that Contractor was not in default under Sections 14.1, then Contractor will be entitled to the same remedies as if this Contract was terminated pursuant to Section 14.6.1.

14.4. Default by OPRD. OPRD will be in default under this Contract if:

14.4.1. OPRD fails to pay Contractor any amount pursuant to the terms of this Contract, and OPRD fails to cure such failure within 30 calendar days after Contractor’s notice or such longer period as Contractor may specify in such notice; or

14.4.2. OPRD commits any material breach or default of any covenant, warranty, or obligation under this Contract, and such breach or default is not cured within 30 calendar days after Contractor’s notice or such longer period as Contractor may specify in such notice.

14.5. Contractor’s Remedies. In the event OPRD terminates this Contract under Section 14.6.1, or is in default under Section 14.4, and whether or not Contractor elects to exercise its right to terminate the Contract under Section 14.6.3, Contractor’s sole monetary remedy will be (i) with respect to Services compensable at a stated rate, a claim for unpaid invoices, time worked within any limits set forth in this Contract but not yet invoiced and authorized expenses incurred and interest, subject to ORS 293.462, and (ii) with respect to Deliverables-based Services, a claim for the sum designated for completing the Deliverables multiplied by the percentage of Services completed and accepted by OPRD, less previous amounts paid and any claim(s) that OPRD has against Contractor. In no event will OPRD be liable to Contractor for any expenses related to termination of this Contract or for anticipated profits. If previous amounts paid to Contractor exceed the amount due to Contractor under this Section 14.5, Contractor shall pay immediately any excess to OPRD upon written demand.

14.6. Termination.

14.6.1. OPRD’s Right to Terminate at its Discretion. OPRD may terminate this Contract:

14.6.1.1. Upon 30 calendar days’ prior written notice by OPRD to Contractor;

14.6.1.2. Immediately upon written notice by OPRD to Contractor if OPRD fails to receive funding, appropriations, limitations, allotments or other expenditure authority at levels sufficient to pay for the Services or Work Products; or

14.6.1.3. Immediately upon written notice by OPRD to Contractor if federal or state laws, regulations, or guidelines are modified or interpreted in such a way that the OPRD’s purchase of the Services or Work Products under this Contract is prohibited or OPRD is prohibited from paying for such Services or Work Products from the planned funding source.

14.6.2. OPRD’s Right to Terminate for Cause. In addition to any other rights and remedies OPRD may have under this Contract, OPRD may terminate this Contract immediately upon written notice by OPRD to Contractor, or at such later date as OPRD may establish in such notice, if Contractor is in default under Section 14.1.

14.6.3. Contractor’s Right to Terminate for Cause. Contractor may terminate this Contract immediately upon written notice to OPRD, or at such later date as Contractor may establish in such notice, if OPRD is in default under Section 14.4.

14.7. Return of Property. Upon termination of this Contract for any reason whatsoever, Contractor shall immediately deliver to OPRD all of Agency’s property (including without limitation any Services or Work Products for which Agency has made payment in whole or in part) that is in the possession or under the control of Contractor in whatever stage of development and form of recordation such Agency property is expressed or embodied at that time.

14.8. Effect of Termination. Upon receiving a notice of termination of this Contract, Contractor shall immediately cease all activities under this Contract, unless Agency expressly directs otherwise in such notice of termination. Upon Agency's request, Contractor shall surrender to anyone Agency designates, all documents, research or objects or other tangible things needed to complete the Services and the Deliverables.

15. Compliance with Law.

15.1. Compliance with Law Generally. Contractor shall comply, and cause all subcontractors to comply with all federal, state and local laws, regulations, executive orders and ordinances applicable to this Contract and the performance of the Services. Without limiting the generality of the foregoing, Contractor expressly agrees to comply with the following laws, regulations and executive orders to the extent they are applicable to this Contract: (i) Titles VI and VII of the Civil Rights Act of 1964, as amended; (ii) Title V and Sections 503 and 504 of the Rehabilitation Act of 1973, as amended; (iii) the Americans with Disabilities Act of 1990 and ORS 659A.142, as amended; (iv) Executive Order 11246, as amended; (v) the Health Insurance Portability and Accountability Act of 1996, as amended by the Health Information Technology for Economic and Clinical Health (HITECH) Act portion of the American Recovery and Reinvestment Act of 2009 (ARRA), including the Privacy and Security Rules found at 45 CFR Parts 160 and 164, as the law and its implementing regulations may be updated from time to time; (vi) the Age Discrimination in Employment Act of 1967, as amended, and the Age Discrimination Act of 1975, as amended; (vii) the Vietnam Era Veterans’ Readjustment Assistance Act of 1974, as amended; (viii) Section 188 of the Workforce Investment Act (WIA) of 1998, as amended; (ix) ORS Chapter 659, as amended; (x) all regulations and administrative rules established pursuant to the foregoing laws; and (xi) all other applicable requirements of federal and state civil rights and rehabilitation statutes, rules and regulations.

These laws, regulations and executive orders are incorporated by reference herein to the extent that they are applicable to the Contract and required by law to be so incorporated. OPRD’s performance under the Contract is conditioned upon Contractor's compliance with the provisions of ORS 279B.220, 279B.225, 279B.230, 279B.235 and 279B.270 which are incorporated by reference herein. Contractor shall, to the maximum extent economically feasible in the performance of this Contract, use recycled paper (as defined in ORS 279A.010(1)(gg)), recycled PETE products (as defined in ORS 279A.010(1)(hh)), and other recycled products (as “recycled product” is defined in ORS 279A.010(1)(ii)).

15.2. Compliance with Oregon Tax Laws.

15.2.1.1. Contractor shall, throughout the duration of this Contract, comply with all tax laws of this state and all applicable tax laws of any political subdivision of this state. For the purposes of this section, “tax laws” includes the tax laws described in Section 8.1.5.1 through 8.1.5.4.

15.2.1.2. Any violation of Section 15.2.1 constitutes a material breach of this Contract. Further, any violation of Contractor’s warranty in Section 8.1.5 of this Contract that Contractor has complied with the tax laws of this state and the applicable tax laws of any political subdivision of this state also constitutes a material breach of this Contract. Any violation entitles OPRD to terminate this Contract, to pursue and recover any and all damages that arise from the breach and the termination of this Contract, and to pursue any or all of the remedies available under this Contract, at law, or in equity, including but not limited to:

15.2.1.3. Termination of this Contract, in whole or in part;

15.2.1.4. Exercise of the right of setoff, or garnishment if applicable, and withholding of amounts otherwise due and owing to Contractor without penalty; and

15.2.1.5. Initiation of an action or proceeding for damages, specific performance, declaratory or injunctive relief. OPRD is entitled to recover any and all damages suffered as the result of Contractor's breach of this Contract, including but not limited to direct, indirect, incidental and consequential damages, costs of cure, and costs incurred in securing replacement Services.

15.2.1.6. These remedies are cumulative to the extent the remedies are not inconsistent, and OPRD may pursue any remedy or remedies singly, collectively, successively, or in any order whatsoever.

15.3. Compliance with Federal Law. Contractor shall comply with all applicable federal laws, including, without limitation, those set forth in Exhibit D, which is attached and incorporated into this Contract by this reference.

15.4. Pay Equity. As required by [ORS 279B.235 or ORS 279C.520], Contractor shall comply with ORS 652.220 and shall not unlawfully discriminate against any of Contractor’s employees in the payment of wages or other compensation for work of comparable character on the basis of an employee’s membership in a protected class. “Protected class” means a group of persons distinguished by race, color, religion, sex, sexual orientation, national origin, marital status, veteran status, disability or age. Contractor’s compliance with this section constitutes a material element of this Contract and a failure to comply constitutes a breach that entitles OPRD to terminate this Contract for cause.

Contractor may not prohibit any of Contractor’s employees from discussing the employee’s rate of wage, salary, benefits, or other compensation with another employee or another person. Contractor may not retaliate against an employee who discusses the employee’s rate of wage, salary, benefits, or other compensation with another employee or another person.

16. Governing Law; Venue and Jurisdiction.

16.1. Governing Law. This Contract is governed by and construed in accordance with the laws of the State of Oregon without regard to principles of conflicts of law.

16.2. Venue and Jurisdiction. Any claim, action, suit or proceeding between OPRD (or any other agency or department of the State of Oregon) and Contractor that arises from or relates to this Contract must be brought and conducted solely and exclusively within the Circuit Court of Marion County for the State of Oregon. CONTRACTOR, BY EXECUTION OF THIS CONTRACT, HEREBY CONSENTS TO THE IN PERSONAM JURISDICTION OF SAID COURTS. In no event may this section be construed as (i) a waiver by the State of Oregon of any form of defense or immunity, whether it is sovereign immunity, governmental immunity, immunity based on the Eleventh Amendment to the Constitution of the United States or otherwise, from any claim, action, suit or proceeding, or (ii) consent by the State of Oregon to the jurisdiction of any court.

17. Miscellaneous Provisions.

17.1. Records Maintenance; Access. Contractor shall maintain all financial records relating to this Contract in accordance with generally accepted accounting principles. In addition, Contractor shall maintain any other records, books, documents, papers, plans, records of shipments and payments and writings of Contractor, whether in paper, electronic or other form, that are pertinent to this Contract (“Records”) in such a manner as to clearly document Contractor's performance. Contractor acknowledges and agrees that OPRD and the Oregon Secretary of State's Office and the federal government and their duly authorized representatives will have access to such financial records and other Records that are pertinent to this Contract, whether in paper, electronic or other form, to perform examinations and audits and make excerpts and transcripts. Contractor shall retain and keep accessible all such financial records and other Records for a minimum of 6 years, or such longer period as may be required by applicable law, following final payment and termination of this Contract, or until the conclusion of any audit, controversy or litigation arising out of or related to this Contract, whichever date is later.

17.2. Foreign Contractor. If Contractor is not domiciled in or registered to do business in the State of Oregon, Contractor shall promptly provide to the Oregon Department of Revenue and the Secretary of State

Corporation Division all information required by those agencies relative to this Contract. Contractor shall demonstrate its legal capacity to perform the Services under this Contract in the State of Oregon prior to entering into this Contract.

17.3. Force Majeure. Neither OPRD nor Contractor may be held responsible for delay or default caused by fire, riot, acts of God, terrorist acts, or other acts of political sabotage, or war where such cause was beyond the reasonable control of OPRD or Contractor, respectively. Contractor shall, however, make all reasonable efforts to remove or eliminate such a cause of delay or default and shall, upon the cessation of the cause, diligently pursue performance of its obligations under this Contract.

17.4. Survival. All rights and obligations cease upon termination or expiration of this Contract, except for the rights and obligations and declarations which expressly or by their nature survive termination of this Contract, including without limitation this Section 17.4, and provisions regarding Contract definitions, warranties and liabilities, independent Contractor status and taxes and withholding, maximum compensation, Contractor’s duties of confidentiality, ownership and license of intellectual property and Deliverables, confidentiality and non-disclosure, Contractor’s representations and warranties, control of defense and settlement, remedies, return of OPRD property, dispute resolution, order of precedence, maintenance and access to records, notices, severability, successors and assigns, third party beneficiaries, waiver, headings, and integration.

17.5. Time is of the Essence. Contractor agrees that time is of the essence under this Contract.

17.6. Notice. Except as otherwise expressly provided in this Contract, any communications between the parties hereto or notices to be given hereunder must be given in writing by email, personal delivery, facsimile, or mailing the same, postage prepaid, to Contractor or OPRD at the email address, postal address or telephone number set forth in this Contract, or to such other addresses or numbers as either party may indicate pursuant to this Section 17.6. Any communication or notice so addressed and mailed is effective five business days after mailing. Any communication or notice delivered by facsimile is effective on the day the transmitting machine generates a receipt of the successful transmission, if transmission was during normal business hours, or on the next business day, if transmission was outside normal business hours of the recipient. To be effective against OPRD, any notice transmitted by facsimile must be confirmed by telephone notice to OPRD’s Contract Administrator. Any communication or notice given by personal delivery is effective when actually delivered. Any notice given by email is effective when the sender receives confirmation of delivery, either by return email, or by demonstrating through other technological means that the email has been delivered to the intended email address.

17.7. No Third Party Beneficiaries. OPRD and Contractor are the only parties to this Contract and are the only parties entitled to enforce the terms of this Contract. Nothing in this Contract gives, is intended to give, or may be construed to give or provide any benefit or right not held by or made generally available to the public, whether directly, indirectly or otherwise, to third persons unless such third persons are individually identified by name herein and expressly described as intended beneficiaries of the terms of this Contract.

17.8. Severability. The parties agree that if any term or provision of this Contract is declared by a court of competent jurisdiction to be illegal or otherwise invalid, the validity of the remaining terms and provisions will not be affected, and the rights and obligations of the parties will be construed and enforced as if the Contract did not contain the particular term or provision held to be invalid.

17.9. Merger Clause; Waiver. This Contract and attached exhibits constitute the entire agreement between the parties on the subject matter hereof. There are no understandings, agreements, or representations, oral or written, not specified herein regarding this Contract. No waiver, consent, modification or change of terms of this Contract will bind the parties unless in writing and signed by both parties and all necessary State approvals have been obtained. Such waiver, consent, modification or change, if made, will be effective only in the specific instance and for the specific purpose given. The failure of OPRD to enforce any provision of this Contract in one instance will not constitute a waiver by OPRD of its right to enforce that or any other provision.

17.10. Amendments. OPRD may amend this Contract to the extent permitted by applicable statutes and administrative rules. No amendment to this Contract is effective unless it is in writing signed by the parties, and has been approved as required by applicable law.

17.11. Counterparts. This Contract may be executed in several counterparts, all of which when taken together constitute one agreement binding on all parties, notwithstanding that all parties are not signatories to the same counterpart. Each copy of the Contract so executed constitutes an original.

17.12. Oregon False Claims Act. Contractor acknowledges the Oregon False Claims Act, ORS 180.750 to 180.785, applies to any action by Contractor pertaining to this Contract, including the procurement process relating to this Contract, that constitutes a "claim" (as defined by ORS 180.750(1)). By its execution of this Contract, Contractor certifies the truthfulness, completeness, and accuracy of any statement or claim it has made, it makes, it may make, or causes to be made that pertains to this Contract. In addition to other penalties that may be applicable, Contractor further acknowledges that if it makes, or causes to be made, a false claim or performs a prohibited act under the Oregon False Claims Act, the Oregon Attorney General may enforce the liabilities and penalties provided by the Oregon False Claims Act against Contractor. Contractor understands and agrees that any remedy that may be available under the Oregon False Claims Act is in addition to any other remedy available to the State or OPRD under this Contract or any other provision of law.

17.13. Certifications. The individual signing on behalf of Contractor hereby:

17.13.1.1. Certifies and swears under penalty of perjury to the best of the individual’s knowledge that: (a) Contractor is not subject to backup withholding because (i) Contractor is exempt from backup withholding, (ii) Contractor has not been notified by the IRS that Contractor is subject to backup withholding as a result of a failure to report all interest or dividends, or (iii) the IRS has notified Contractor that Contractor is no longer subject to backup withholding; (b) s/he is authorized to act on behalf of Contractor, s/he has authority and knowledge regarding Contractor’s payment of taxes, and to the best of her/his knowledge, that Contractor is not in violation of any Oregon tax laws and that for a period of no fewer than six (6) calendar years preceding the Effective Date of this Contract, Contractor faithfully has complied with: (i) all tax laws of this state, including but not limited to ORS

305.620 and ORS chapters 316, 317, and 318; (ii) any tax provisions imposed by a political subdivision of this state that applied to Contractor, to Contractor’s property, operations, receipts, or income, or to Contractor’s performance of or compensation for any work performed by Contractor; (iii) any tax provisions imposed by a political subdivision of this state that applied to Contractor, or to goods, services, or property, whether tangible or intangible, provided by Contractor; and (iv) any rules, regulations, charter provisions, or ordinances that implemented or enforced any of the foregoing tax laws or provisions; (c) Contractor is an independent contractor as defined in ORS 670.600; and (d) the supplied Contractor tax identification numbers are true and accurate;

17.13.1.2. Certifies that, to the best of the undersigned’s knowledge, Contractor has not discriminated against and will not discriminate against any disadvantaged business enterprise, minority-owned business, woman-owned business, business that service-disabled veteran owns or emerging small business certified under ORS 200.055 in obtaining any required subcontracts;

17.13.1.3. Certifies that Contractor has a written policy and practice that meets the requirements, described in ORS 279A.112, of preventing sexual harassment, sexual assault, and discrimination against employees who are members of a protected class. Contractor agrees, as a material term of the Contract, to maintain the policy and practice in force during the entire Contract term.

17.13.1.4. Certifies that the information provided on the attached Exhibit E, Independent Contractor Certification, is true and correct as of the Effective Date; and

Certifies that Contractor and Contractor’s employees and agents are not included on the list titled “Specially Designated Nationals and Blocked Persons” maintained by the Office of Foreign Assets Control of the United States Department of the Treasury and currently found at https://www.treasury.gov/ofac/downloads/sdnlist.pdf

In witness whereof, the Parties hereto have made, executed and delivered the Contract as of the last date a signatory below has signed the Contract.

XXXX (Contractor)

By: _________________________________________________________________________ Name/Title Date

State of Oregon acting by and through its Oregon Parks and Recreation Department (OPRD)

By: _________________________________________________________________________ Name/Title Date https://www.treasury.gov/ofac/downloads/sdnlist.pdf

EXHIBIT A

STATEMENT OF WORK

1. PURPOSE; SCOPE OF WORK

OPRD wishes to establish a Contract for Hazard Tree Services within the Jessie Honeyman Management Unit, located 3 miles South of Florence, OR and extends North to Darlingtonia State Natural Area on Highway 101. Hazard Tree

Services include but are not limited to felling, topping, and limbing trees that are designated hazardous by OPRD.

Contractor may use methods of climbing, aerial lift, equipment ropes and pulley’s, and any other approved method to mitigate hazard trees. Park Manager will determine the scope of work of the hazard trees.

The purpose of this Contract is to provide safety for park visitors and property, preserve trees and maintain the aesthetics of both the trees and the environment.

2. WORK AND DELIVERABLES. Contractor shall:

a) Conduct Hazard Tree trimming and felling services on an as-needed basis for the specified location(s) within the

Jessie M. Honeyman Management Unit.

b) Other possible services include chipping and removing debris, tree topping, climbing and limbing, using an aerial lift to trim trees.

3. CONTRACTOR OBLIGATIONS:

3.1 General Requirements. Contractor shall:

a) Perform the work in accordance with the stated specifications, requirements, delivery schedule, and relevant industry standards;

b) Permit only qualified staff to operate equipment on OPRD property;

c) Provide all equipment, labor, materials and supplies necessary to complete the requested work;

d) Keep a record of the work performed, including sufficient detail to substantiate invoices;

e) Coordinate with OPRD’s Contract Administrator to determine start date of project. Once a start date is agreed upon, Contractor shall submit a work schedule to the OPRD’s Contract Administrator detailing dates of work and start and stop times for work;

f) Operate all equipment in a safe and accident free manner, and wear appropriate personal protective equipment (PPE), at all times while at the work sites;

g) Notify OPRD’s Contract Administrator in the event of an accident that did or could result in damage to OPRD property, private property, or the public;

h) Operate during the time between one-half hour after sunrise to one-half hour prior to sunset each day. No work will be done on weekends or holidays unless approved by OPRD’s Contract Administrator;

i) Designate snags/hazard trees with blue paint or flagging to indicate it is a hazard tree;

j) Ensure that felling and bucking of designated snags/hazard trees will be felled in a method that will protect

Agency infrastructure and trails. Logs need to be secure from rolling or moving.

k) Treat designated snags/hazard trees as follows:

1. Snags/hazard trees shall be painted blue in color treatment

2. Drop blue painted trees

3. Cut pieces of limbs and trunk not to exceed 4 feet in length

4. Debris will either be collected by contractor or the park. Park Manager will work with contractor to determine most time and cost-effective solution.

5. Any designated debris left on site must be 10 feet away from trials or road edge and infrastructure.

6. All stumps must be cut at ground level

3.2 Job Safety. Contractor shall:

a) Operate all equipment in a safe and accident free manner, and wear appropriate personal protective equipment (PPE), at all times while at the work sites;

b) Notify OPRD’s Contract Administrator in the event of an accident that did or could result in damage to OPRD property, private property, or the public; and

c) Post and maintain signs adequately warning park users of active operations in the area.

d) Post personnel at all entry points of the operation area to restrict persons from entry into the active work zones.

e) Daily coordination with Park Ranger Supervisor and/or project administrator

3.3 Damage to OPRD Property. Contractor shall:

a) Be liable for the repair of or payment for any damage to OPRD improvements resulting from activities of

Contractor prior to the completion and as a condition of final acceptance by OPRD of Contractor’s Operations, and shall repair or correct any injury or damage to the Areas of Operations or any part of the Area of

Operations arising from Contractor’s Operations; and

b) Take all precautions to prevent damage to stream banks, any stream course or forested wetland within or adjacent to the operation area.

3.4 Discovery of Cultural Resource. “Cultural Resource” means any archaeological or historical sites, buildings, structures, and artifacts, which possess material evidence of human life and culture of prehistoric and historic past.

a) If cultural resources are discovered by Contractor, Contractor shall move to a different work area, flag suspect area, and immediately notify OPRD’s Contract Administrator and follow Exhibit D (Inadvertent Discovery Plan

(IDP).

b) Identification and Protection of Cultural Resources. Contractor acknowledges Cultural Resources may exist within the project site and that the existence and location of such Resources may be unknown at the time this

Contract is executed. Contractor shall exercise due care in its Operations to ensure that, in the event any such

Resources are discovered in the course of, or as a result of Contractor's Work, such Resources may be preserved in accordance with Exhibit D and requirements of ORS Chapter 358.

c) Protection of Cultural Resources. Contractor shall not remove any historic artifact or other Cultural Resources from the project site. If any such items are discovered, Contractor shall immediately notify OPRD’s Contract

Administrator.

4. SERVICES SCHEDULE

OPRD and Contractor shall negotiate the Project Schedule upon execution of the Contract. The agreed-upon Project

Schedule shall become a part of the Contract. Work can be done between 8 A.M. -4:30 P.M. M-F exceptions are State and Federal holidays. Any service needed outside of above operating hours deemed emergency services will need Park

Managers approval. Please contact park at 541-997-3851 and notify of work being done. Contractor MUST complete all work within 72 hours or plan schedule with park manager. The needs of OPRD will take precedence. Contractor understands and agrees that Contractor bears the risk that weather conditions may endanger the Contractor’s ability to complete the Work within the negotiated Delivery Schedule. The negotiated Delivery Schedule will be incorporated into the Contract by this reference.

5. OPRD OBLIGATIONS

OPRD shall:

a) Respond to requests to perform work within 24 hours;

b) Provide accurate details of location where work is to be done;

c) Respond to access issues on OPRD property if they occur.

EXHIBIT B

INSURANCE

1. INSURANCE

Contractor shall obtain at Contractor’s expense the insurance specified in this Exhibit B prior to performing under this Contract and shall maintain it in full force and at its own expense throughout the duration of this

Contract, as required by any extended reporting period or tail coverage requirements, and all warranty periods that apply. Contractor shall obtain the following insurance from insurance companies or entities that are authorized to transact the business of insurance and issue coverage in Oregon and that are acceptable to

OPRD. Coverage shall be primary and non-contributory with any other insurance and self-insurance, with the exception of Professional Liability and Workers’ Compensation. Contractor shall pay for all deductibles, self-insured retention and self-insurance, if any.

1.1 WORKERS’ COMPENSATION; EMPLOYERS’ LIABILITY

All employers, including Contractor, that employ subject workers, as defined in ORS 656.027, shall comply with

ORS 656.017 and provide workers' compensation insurance coverage for those workers, unless they meet the requirement for an exemption under ORS 656.126(2). Contractor shall require and ensure that each of its subcontractors complies with these requirements. If Contractor is a subject employer, as defined in ORS

656.023, Contractor shall also obtain employers' liability insurance coverage with limits not less than $500,000 each accident. If Contractor is an employer subject to any other state’s workers’ compensation law, Contactor shall provide workers’ compensation insurance coverage for its employees as required by applicable workers’ compensation laws including employers’ liability insurance coverage with limits not less than $500,000 and shall require and ensure that each of its out-of-state subcontractors complies with these requirements.

1.2 COMMERCIAL GENERAL LIABILITY

Commercial General Liability Insurance covering bodily injury and property damage in a form and with coverage satisfactory to OPRD. This insurance shall include personal and advertising injury liability, products and completed operations, contractual liability coverage for the indemnity provided under this Contract, and have no limitation of coverage to designated premises, project or operation. Coverage shall be written on an occurrence basis in an amount of not less than $1,000,000.00 per occurrence. Annual aggregate limit shall not be less than $2,000,000.00.

1.3 AUTOMOBILE LIABILITY INSURANCE

Automobile Liability Insurance covering Contractor’s business use including coverage for all owned, nonowned, or hired vehicles with a combined single limit of not less than $1,000,000.00 for bodily injury and property damage. This coverage may be written in combination with the Commercial General Liability

Insurance (with separate limits for Commercial General Liability and Automobile Liability). Use of personal automobile liability insurance coverage may be acceptable if evidence that the policy includes a business use endorsement is provided.

1.4 RESERVED

1.5 EXCESS/UMBRELLA INSURANCE

A combination of primary and excess/umbrella insurance may be used to meet the required limits of insurance.

1.6 ADDITIONAL INSURED

All liability insurance, except for Workers’ Compensation, Professional Liability, and Network Security and

Privacy Liability (if applicable), required under this Contract must include an additional insured endorsement specifying the State of Oregon, its officers, employees and agents as Additional Insureds, including additional insured status with respect to liability arising out of ongoing operations and completed operations, but only with respect to Contractor's activities to be performed under this Contract. Coverage shall be primary and non-contributory with any other insurance and self-insurance. The Additional Insured endorsement with respect to liability arising out of Contractor’s ongoing operations must be on ISO Form CG 20 10 07 04 or equivalent and the Additional Insured endorsement with respect to completed operations must be on ISO form CG 20 37 07 04 or equivalent.

1.7 WAIVER OF SUBROGATION

Contractor shall waive rights of subrogation which Contractor or any insurer of Contractor may acquire against

OPRD or State of Oregon by…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .