Salient Characteristics R_1.pdf

PDF 109 KB Posted

Attached to
Airfield Lighting Computers B531 Federal contract opportunity
Solicitation number
FA465924QZ013
Issued by
Department of the Air Force Air Mobility Command

About this file

This document is a set of specifications for the replacement of airfield lighting computers at Airfield B531. The key requirements include:

  1. Airfield Lighting Control and Monitoring System (ALCMS) Refresh: The new equipment must be compatible with the current ADB Safegate system and utilize the existing ALCMS software. It calls for the replacement of various equipment in the Air Traffic Control Tower Cab, Air Traffic Control Tower, Airfield Vault, and Airfield Base Operations. The contractor must perform security updates and provide on-site commissioning with acceptance testing.

  2. Advanced Control Equipment (ACE) Refresh: The document requires the removal and replacement of 32 ACE2 Switchgear Doors with ACE3 units, and the replacement of ACE Input/Output Cards. On-site commissioning and acceptance testing is also required.

The document also includes an option for the replacement of two Precision Approach Path Indicator (PAPI) systems, which must comply with UFC 3-535-01 and FAA requirements.

This requirement is being solicited by the Department of the Air Force, Air Mobility Command, with a response due date of July 2, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Airfield Lighting Computers B531, newest first.
File Type Posted
Updated Response deadline_Combo Airfield Lighting_R3.pdf PDF
Combo Airfield Lighting_R2.pdf PDF
Provisions and Clauses FA465924QZ013.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JFSD230044

REPLACE AIRFIELD LIGHTING COMPUTERS B531

02 July 2024

SPECIFICATIONS

JFSD230044 REPLACE AIRFIELD LIGHING COMPUTERS B531

1. Airfield Lighting Control and Monitoring System (ALCMS) Refresh:

Comply with UFC 3-535-01 and all FAA requirements to include the following salient features:

New equipment must be compatible with current ADB Safegate system. All new equipment shall utilize existing ALCMS software including presets, airport layout, and touchscreen pages with modifications for new hardware. All switches installed shall be managed/meet DoD security standards.

Air Traffic Control Tower Cab Equipment o Remove existing touchscreen and replace with 19” touchscreen o Remove/replace longview video extender o Remove/replace UPS equipment

Air Traffic Control Tower Equipment o Remove/replace 19” LCD Monitor o Remove/replace industrial microbox style central processing unit with Windows o Remove/replace redundant multi-mode fiber transceivers with ST Connectors o Remove/replace UPS Equipment

Airfield Vault Equipment o Remove/replace 19” LCD Monitor o Remove/replace two (2) industrial microbox style central processing units with

Windows 11 o Remove/replace four (4) multi-mode fiber transceivers with ST Connectors o Remove/replace Printer o Remove/replace A/B Switch o Remove/replace UPS Equipment

Airfield Base Operations Equipment o Remove/replace 19” LCD Monitor o Remove/replace industrial microbox style central processing unit with Windows o Remove/replace redundant multi-mode fiber transceivers with ST Connectors o Remove/replace UPS Equipment

Perform latest security patches and Military Security Patch to meet the Security Directive on Windows 11 PC adding the latest Microsoft Security Patches to the system.

Provide on-site commissioning of new hardware with acceptance test report All removed items become property of the contractor to be disposed of; hardrives shall be turned over to the government for destruction and disposal

JFSD230044

REPLACE AIRFIELD LIGHTING COMPUTERS B531

2. Advanced Control Equipment (ACE) Refresh:

Remove and replace ACE units with updated ACE3 units and ensure compatibility with new ALCMS system. Comply with UFC 3-535-01 and all FAA requirements to include the following salient features:

Remove/replace thirty-two (32) ACE2 Switchgear Doors to ACE3 o Twenty-five (25) 5-step doors o Seven (7) 3-step doors

Replace ACE Input/Output Cards with required ACE3 Input/Output Cards Provide on-site commissioning of new hardware with acceptance test report All removed items become property of the contractor to be disposed of.

Option 1. Precision Approach Path Indicator (PAPI) Replacement

Comply with UFC 3-535-01 and all FAA requirements to include the following salient features:

Provide two (2) PAPI systems o New PAPI system shall be L880 Style B LED system with four (4) light housing units, 3 Legs, 6.6A, with baffling