Salient Characteristics - overhead track_rev_120221.docx
DOCX document 17 KB Posted
- Attached to
- 6515--Overhead Track System (Medical) Federal contract opportunity
- Solicitation number
- 36C26122Q0091
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26122Q0091 0003.docx | DOCX document | |
| 36C26122Q0091 0002.docx | DOCX document | |
| Attachment 3 - Conformed Set.pdf | ||
| 36C26122Q0091_1.docx | DOCX document | |
| Attachment 4 - OverHead Oval Lift at PT layout.pdf | ||
| S02 - SOW_Overhead Track_rev 120221.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Salient Characteristics
Overhead Customized Oval Track System
1. General Customized Oval Overhead Track System for (1) Room with accessories, stamped drawings, structural calculations, and onsite training
2. Warranty Requirements Five (5) year minimum warranty on all parts and accessories Two (2) minimum year warranty on lanyard and harness
3. Quality Standard and Certifications
a. ISO certified
b. IEC certified
c. Class I CE
d. UL certified
e. FCC listed
4. Parts Requirements
a. Track tested and rated to hold up to minimum 500 lbs.
i. Aluminum extrusion – Grade 6005A-T5 or better
ii. Mid-Span deflection suspension supports at least 0.90”
iii. Track with at least 36” support spacing.
iv. Track can be utilized as a straight run, curved, or an oval system.
v. Length of tracks must be able to be customized according to the stamped and approved shop drawings.
b. Trolley tested and rated to hold up to minimum 500 lbs.
i. Must be made out of anti-corrosive material when it comes in contact with aluminum track
ii. Must be made so that it can carry up to 500 lbs. min. per patient.
iii. Must be made so that it is flexible enough to accommodate patient to freely move.
iv. Allows multiple users at a time by easily adding and removing trolleys as needed depending on the patient therapy workload
v. Trolley shall not be motorized
c. Adjustable lanyard rated to hold up to 500 lbs. minimum.
i. Must be easily adjustable
ii. Must be made so it allows patient to move freely
iii. Must be easily adjustable to accommodate any ceiling height
iv. 360 degree swivel at top and bottom to allow for unfettered movement
v. Provide backup adjustable safety cam as an extra safety precaution
Harness System
a. Vest shape harness with 5 points of adjustment (min.) and equipped with back pad.
b. Padded shoulder, leg and back are made of closed cell foam with mesh lining or other materials to ensure patient comfort.
c. Adjustment area allows min. 4” of chest strap adjustment.
d. Equipped with torso buckles with release tabs
e. ( )Positioning D-Rings are backed with heavy duty cordura (or equal) and a wear pad for durability
f. Harnesses shall be made so that it can easily be adjustable to fit multiple sized adult patients and made from very durable and easily cleanable fabric/materials.
g. Harness shall be equipped with easily adjustable and durable fabric straps
i. Option: connect the straps to buckles with release tabs to assist in adjustments
ii. Option: harness can be equipped with Velcro to assist in adjustments and to assist in securing the patient to the harness
h. Harness - universal harness XXS-XXL to hold 400 lbs min.
i. Unloading Harness/ bariatric 600 lbs min.
Trolley Insert Clot Allows multiple users at a time by adding and removing trolleys as needed depending on the patient therapy workload.
Lanyard
a. Adjustable cam release allows therapist to adjust tension for patient and ceiling height.
b. Back up adjustable safety cam provided and serves as an extra safety precaution.
c. 360 degree swivel at top and bottom.
5. Above Ceiling Structural Support System
a. Detailed shop drawings that are subject to approval by the VA. See paragraph 4 above (Parts Requirements).
b. Must use seismic connections and attachments.
c. Connections from above ceiling support systems to the track must also use seismic connection and attachments. The connections from above ceiling support systems to the track, including its mechanical connections must be able to resist corrosion.
d. Must be compliant with structural details on Conformed Set’s Structural Drawings.
e. The Unistrut, struts, and trapeze system (if applicable) above ceiling must be compliant with Conformed Set’s Structural Drawings and they must be designed to resist seismic forces.
6. Stamped Shop Drawings and Structural Calculations Provide a fully engineered and stamped drawings and structural calculations by a licensed engineer for the mounting and installation of the system. Calculations required by a State of California licensed Structural Engineer. Drawings shall contain dimensions, configuration and layout of the track, section cut details, details of all the support system above ceiling, attachment and connection details and their locations, etc. Layout of the track shall be drawn to include other ceiling elements in the vicinity of the track, such as location of light fixtures, location of mechanical diffusers, and location of fire sprinklers.
7. Installation Requirement
a. Installation of the equipment and its associated parts must be installed by certified installer so as not to void warranties.
8. Onsite Training
a. Provide onsite or virtual training to the VA staff. Training shall be conducted no more than 6 weeks after installation is complete.
b. Provide in-person or virtual training demonstration for the operation of the system
c. Provide in-person or virtual training for the maintenance and troubleshooting of the system
d. Provide training literature and technical support contact information image1.png image2.png
File details come from the government source that posted it. Updated .