Concrete (Poured) Foundation materials (Sand, rock, gravel)
Solicitation number
FA489725SS029
Issued by

About this file

This specification sheet details a federal contract opportunity for material delivery to Mountain Home Air Force Base (MHAFB) for a K-SPAN construction project. The 823d RED HORSE Squadron requires four specific material types: 1,295 U.S. tons of 0.75-inch Aggregate Base Course (delivered in two phases by 18 June and 8 August), 362 U.S. tons of #4 Rock Crushed concrete (also in two phases), 250 Cubic Yards of 4000 psi concrete (delivered in multiple stages starting 3 July and 9 August), and 55 Tons of Sand (to be delivered by 18 June).

The document includes comprehensive material specifications and testing requirements, with detailed ASTM standard tests for soils and concrete, including sieve analysis, specific gravity measurements, temperature testing, slump tests, and cylinder/beam creation. Delivery is strictly controlled, with specific coordination requirements involving the 823 RHS and 819 RHS Project Managers. The performance period is from 18 June 2025 to 31 October 2025, with deliveries to be made during standard business hours (6AM-6PM) at Mountain Home AFB, using specific commercial gate and delivery site coordinates. Contractors must adhere to military installation security procedures and provide a qualified supervisor who can make on-site decisions.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATION SHEET

Mountain Home AFB, ID

823 RHS K-Span Aggregate Material Package 12 May 2025

PART I – GENERAL REQUIREMENTS

1. GENERAL: The 800th RED HORSE Group requires 4 different types of material to construct a two 5,000 Sf K-SPAN at the Mountain Home AFB CSTR Site.

a. The Contractor shall deliver the material to the job site. The material shall conform to the specifications provided in Part II. The origination of the material must be approved by the 823 RHS Project Manager or the 819 RHS Project Manager.

b. Quotation shall include delivery, to include any applicable environmental and fuel surcharges.

c. Delivery will be in accordance with delivery schedule provided in Part II.

i. All material is to be delivered to Mountain Home Air Force Base (MHAFB). See Attachment for 1 delivery location.

1. Commercial gate coordinates: 43.0696, -115.8954

2. Delivery site coordinates: Identified in Attachment 1

3. Specific drop-off location on site will be coordinated with the 823d

RHS Project Manager, MSgt Paul Berkvens (paul.berkvens@us.af.mil) or with the 819th RHS Project Manager, MSgt Jesson Jordan (jesson.jordan@us.af.mil).

d. All increases, decreases, or modifications to the requirements specified in this document must be directed by the Contracting Officer (CO).

2. Delivery Periods. The delivery of material will occur during standard business hours on Monday through Friday between 6AM and 6PM. However, the times may fluctuate.

a. The performance period for this contract shall be between 18 June 2025 and 31 October 2025.

b. The Contractor shall be responsible for transporting the material to the construction site. The Government will make every effort to provide the Contractor the maximum amount of notice possible.

c. Notification of date and time of delivery will be made as early as possible for all materials. A minimum of 48 hours prior to the required delivery date, the Contractor will contact the 823 RHS Project Manager or the 819 RHS Project Manager to coordinate the date/time and specific location of deliveries.

mailto:paul.berkvens@us.af.mil mailto:jesson.jordan@us.af.mil

d. In the event of adverse weather events prohibiting safe delivery of material, the 823 RHS Project Manager or 819 RHS Project Manager will contact the contractor to coordinate rescheduling of delivery within the following 48 hours.

3. Military Installation Requirements

a. All mud, dirt, debris, foreign objects, trash, or spills caused by the contractor

(including Sub-Contractors) on a street or parking lot, used as access to the work site or staging area shall be cleaned off the same day or as soon as practicable or requested by the CO.

b. The Contractor shall immediately report to the CO to discuss any issues or incidents which may indicate potential imminent risk to Government personnel or the environment. Following the notification, the Contractor shall be available to the CO for instructions regarding remediation of the release. Contractor should be aware of “you spill, you dig” policies, which means if you are the cause of the spill then you are responsible for the cleanup. To report a release or spill, contact the CO immediately.

c. The Contractor shall follow existing security procedures and instructions applicable to MHAFB. The Contractor is responsible for providing required documents in a timely manner to maintain the submitted work schedule. Delays caused by documents not being submitted early enough are the responsibility of the Contractor.

d. The contractor shall adhere strictly to existing security procedures and instructions applicable to accessing MHAFB. Contractor personnel attempting to access MHAFB shall hold a current, valid identification (ID). The U.S Government shall not be liable for delays resulting from pass coordination/approval. Contractor shall allot time into its schedule for obtaining base access.

4. Emergency Situations. Installation access may be restricted at any time. Restricted access is reserved for emergency actions, exercises, or increased installation security.

5. Contractor Responsibility.

a. The Contractor is responsible for the wellbeing of their workers. The Government will not be responsible for supplying food or water to the Contractor’s workers. The Contractor should bring enough food and water for his/her workers to last the entire delivery period.

b. The Contractor shall provide the name and phone number of a supervisor that can make decisions for the Contractor and who is responsible for the performance of the work. The supervisor shall be designated in writing when the contract is awarded and must always be available during work hours. The supervisor shall read, write, and speak fluent English. Additionally, the supervisor shall have sufficient technical knowledge with regard to the requirements prescribed in this document. The identified Government representative shall have the right to request a replacement for any individual not deemed acceptable to the Government at any time.

PART II – Material Specifications

1. GENERAL: The 823d RED HORSE Squadron requires 4 different types of material to construct a 5,000 Sf K-SPAN at the Mountain Home AFB CSTR Site.

a. Base Course

i. The contractor shall deliver 1,295 U.S. tons of 0.75-inch minus Aggregate

Base Course of D-1 Grading

1. The contractor shall deliver 228 U.S. tons delivered by 18 June

a. This delivery shall be coordinated with the 823 RHS Project Manager

2. The contractor shall deliver 1,067 U.S. tons by 8 August

a. This delivery shall be coordinated with the 819 RHS

Project Manager

b. #4 Rock

i. The contractor shall deliver 362 U.S. tons of #4 Rock Crushed concrete

1. The contractor shall deliver 182 U.S. tons by 18 June

a. This delivery shall be coordinated with the 823 RHS Project Manager

2. The contractor shall deliver 180 U.S. tons by 8 August

a. This delivery shall be coordinated with the 819 RHS

Project Manager

c. Concrete

i. The contractor shall deliver 250 Cubic Yards of 4000 psi concrete.

ii. Materials shall be delivered:

1. Starting 3 July, the contractor shall deliver 250 Cubic Yards as needed across multiple days.

a. 823 RHS will coordinate with contractor with 48 hours notice prior to needing delivery of concrete, including quantity, delivery location, and necessity of pump truck extension for footer pours.

2. Starting 9 August, the contractor shall deliver 200 Cubic Yards as needed across multiple days.

a. 819 RHS will coordinate with contractor with 48 hours notice prior to needing delivery of concrete, including quantity, delivery location, and necessity of pump truck extension for footer pours.

d. Sand

i. The contractor shall deliver 55 Tons of Sand.

ii. Materials shall be delivered by 18 June

2. Material Specifications

a. Base Course

i. ¾” aggregate base course of D-1 Grading

b. #4 Rock

i. Subbase aggregate material

c. Concrete

i. 4000 psi concrete

d. Sand

i. PS 1 Leveling Sand

3. Tests, Inspections, and Verifications

a. Contractor shall provide submittals for all soils and concrete listed in Section 1 for viability.

b. Soils

i. Sieve Analysis - ASTM C117 and C136

ii. Liquid Limit - ASTM D4318

iii. Plastic Limit - ASTM D4318

iv. Proctor Method C – ASTM D1557

v. Sand Cone Test (In-Place Density) – ASTM D1556

vi. Bulk Specific Gravity Coarse Grain – ASTM C127

vii. Bulk Specific Gravity Fine Grain – ASTM C128

c. Concrete

i. Sampling – ASTM C172

ii. Temperature – ASTM C1064

iii. Slump Test – ASTM C143

iv. Unit Weight Test – ASTM C138

v. Air Content (Pressure Method) – ASTM C231

vi. Creating Cylinders – ASTM C31

vii. Creating Beams – ASTM C31