Salient Characteristics and Requirements Document Wide Format Production Laminator System 1.pdf

PDF 109 KB Posted

Attached to
SEAL Pro D w/ Productively Pack
Solicitation number
FA930126Q0037
Issued by

About this file

SALIENT CHARACTERISTICS & STATEMENT OF WORK (SOW)

This is a Statement of Work for the procurement of a commercial-grade, heavy-duty wide-format production laminator system in a fully loaded configuration, including turnkey delivery, installation, certified training, a 3-year extended maintenance agreement (EMA), and de-installation/disposal services. The specification type is a Commercial Item Technical Performance Specification classified as a New Equipment Requirement under Full & Open Competition. The laminator is intended as the primary print finishing, mounting, and surface protection system for graphic production and reprographics applications, including chain of command boards, leadership portraiture, organizational insignia, mounted presentation boards, and banners/posters/fleet graphics.

The equipment must meet or exceed a 61-inch usable laminating width, 1.5-inch nip height clearance, dual independently controlled heated silicone rollers capable of temperatures up to 284°F, a nip pressure of 14.28 lbf/in, continuous variable-speed processing up to 20 feet per minute, five active shaft positions with auto-grip mechanics, and optical safety interlocks with emergency stop switches. The fully loaded configuration must include an easy in-feed table with balance-stay mechanism, out-feed in-line slitters, active multi-fan cooling array, rear nip control handles, and auxiliary auto-grip shaft with on-frame storage. The base manufacturer warranty must cover 2-year parts, 1-year roller defect, and 1-year labor. The 3-Year On-Site EMA must provide 100% parts, labor, travel, and diagnostic coverage with one scheduled comprehensive preventive maintenance visit annually (minimum 3 visits over the term), a 4-business-hour toll-free technical support response time, and 48-hour on-site technician arrival for unresolved hardware faults; physical damage to rollers from external factors such as cuts, scoring, or chemical damage is explicitly excluded from this coverage. Deliverables include the laminator system, baseline warranty, inside delivery and installation, 4+ hours of hands-on operator and staff training for up to six operators, the 3-year EMA, and certified de-installation and eco-friendly disposal of the legacy equipment with a Certificate of Disposal provided within 30 days. Offerors must submit specification sheets with point-by-point compliance verification, fully loaded configuration documentation, formal warranty and EMA terms confirmation, and proof of factory certification for all service personnel.

View the file

Other files

File Type Posted
Here are the answers to your questions.pdf PDF
IMG_1377.jpeg JPEG file
IMG_1378.jpeg JPEG file
Combined Synopsis Solicitation- FA930126Q0037 PA Laminator (2) 2.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SALIENT CHARACTERISTICS & STATEMENT

OF WORK (SOW)

Procurement Title: Wide-Format Production Laminator System (Fully Loaded Configuration), Turnkey Delivery, Installation, Training, 3-Year Extended Maintenance Agreement (EMA), and De-installation/Disposal

Specification Type: Commercial Item Technical Performance Specification

Classification: New Equipment Requirement (Full & Open Competition / Commercial-Grade

Heavy-Duty Dual-Heated Roll Laminator)

Mandatory Standard: All proposed equipment, components, warranties, and services must meet or exceed the baseline specifications outlined herein.

1. PURPOSE & INTENDED USE

1.1 Objective

The purpose of this acquisition is to procure a commercial-grade, heavy-duty wide-format roll laminator delivered in a "fully loaded" operational configuration. Any proposed solution must meet or exceed all stated baseline operational requirements, including factory warranty coverage

(meeting or exceeding 2-year parts, 1-year roller defect, 1-year labor), turnkey inside delivery, on-site uncrating/installation, certified staff training, a comprehensive 3-Year Extended Maintenance

Agreement (EMA) without roller protection, and certified de-installation, rigging, and eco-friendly disposal of existing equipment.

1.2 Operational Purpose & Applications

The laminator serves as the primary print finishing, mounting, and surface protection system for graphic production and reprographics. The equipment must meet or exceed the capability to apply high-grade protective and encapsulation films (thermal, heat-assist, and pressure-sensitive/cold films) to oversized media measuring up to 50 inches in width and continuous run lengths of 1 to 15 feet or greater.

Key graphics produced must meet or exceed quality standards across the following applications:

Chain of Command Boards & Official Displays: Multi-layer, mounted visual displays demanding pristine optical clarity, edge bonding, and bubble-free finishes.

Leadership Portraiture & Headshots: High-precision pressure-sensitive cold and warm lamination without surface distortion, hazing, or silvering.

Organizational Shields & Insignia: Heavy-gauge vinyl lamination and rigid core substrate mounting up to 1.5 inches in thickness.

Mounted Presentation & Briefing Boards: Direct single-pass mounting of heavy photographic prints onto foam board, gatorboard, PVC/Sintra, and coroplast panels.

Banners, Posters, and Fleet/Window Graphics: Continuous roll-to-roll web processing with consistent tracking and automated release liner rewinding.

2. MINIMUM SALIENT CHARACTERISTICS (MUST MEET OR

EXCEED ALL SPECIFICATIONS)

To be deemed technically acceptable, any proposed system must meet or exceed all baseline physical, mechanical, thermal, and functional characteristics detailed below.

2.1 Media Handling & Substrate Clearance

Maximum Working Width: Must meet or exceed a 61-inch (1,550 mm) usable laminating width to accommodate standard 50-inch media rolls and 60-inch web films with generous edge margin.

Nip Height / Substrate Clearance: Must meet or exceed a 1.5-inch (38 mm) roller nip opening clearance (motorized or micro-dial manual) to accommodate thick mounting boards and rigid sheet substrates.

Easy In-Feed Table System: Must meet or exceed the functionality of a hinged, swing-up ergonomic in-feed table with a self-supporting "stay-put" balance mechanism that remains upright during media threading, complete with an integrated print alignment guide and low-friction feed surface.

Roll Storage Trough: Must meet or exceed the utility of an integrated front-mounted material trough positioned beneath the feed table to suspend and cradle unlaminated prints cleanly off the floor during feeding.

2.2 Thermal & Pressure Architecture

Dual Heated Rollers: Must meet or exceed the performance of independently controlled top and bottom heated silicone rollers capable of dual-sided thermal encapsulation (up to

10 mil per side), single-sided cold lamination, and heat-assisted cold pressure application.

Operating Temperature Range: Must meet or exceed an operating temperature range adjustable from ambient room temperature up to at least 284°F (140°C).

Heating Uniformity: Must meet or exceed an edge-to-edge roller surface temperature uniformity specification of ±3°F across the entire 61-inch heated roller face.

Nip Pressure: Must meet or exceed a linear mechanical nip pressure of 14.28 lbf/in (2.5

N/mm) to prevent air entrapment on dense photographic media and eliminate silvering with pressure-sensitive adhesives.

Parallel Nip Adjustment: Must meet or exceed dual-sided micro-dial adjustment controls with visual indicators to maintain uniform parallel roller contact across the entire width.

2.3 Drive System & Throughput

Variable Operating Speed: Must meet or exceed continuous variable-speed processing speeds of up to at least 20 feet per minute (6 meters per minute).

Roll-to-Roll Capability: Must meet or exceed the capability for unattended continuous web finishing via integrated motorized lower take-up and supply mechanisms.

Shaft Capacity & Quick-Loading Core Chucks:

Must meet or exceed five (5) active shaft positions: top supply, top liner take-up, bottom supply, bottom liner take-up, and rear pull-roll take-up.

Must meet or exceed lightweight, drop-in 3-inch auto-grip aluminum supply shaft mechanics enabling single-operator chucking without specialized tools.

Upper take-up shaft must meet or exceed smooth peeling, tensioning, and rewinding of release liners.

2.4 "Fully Loaded" Options & Productivity Package

The system must be supplied in a fully loaded production configuration that must meet or exceed each of the following integrated accessory specifications:

1. Easy In-Feed Table: Must meet or exceed a precision swing-up feed table with balance-stay mechanism and integrated tension rollers to facilitate effortless media alignment and threading.

2. Out-Feed In-Line Slitters: Must meet or exceed a multi-point rotary output slitter assembly mounted directly to the machine discharge, enabling operators to trim margins and slit multi-up jobs during active run-out.

3. Active Multi-Fan Cooling Array: Must meet or exceed a high-volume multi-fan outfeed cooling system positioned directly behind the nip to chill thermal films rapidly upon exit, eliminating web curling, waves, or heat distortion on long-run banners.

4. Rear Nip Control Handles: Must meet or exceed auxiliary nip adjustment mechanisms located at the rear of the machine, permitting a single operator to regulate roller gap and monitor exit media directly from the discharge end.

5. Auxiliary Auto-Grip Shaft & On-Frame Storage: Must meet or exceed provision of a secondary spare 3-inch auto-grip shaft mounted to dedicated chassis brackets for rapid job-to-job film changeovers.

2.5 Safety Features & Compliance

Optical Safety Interlocks: Must meet or exceed self-monitoring optical light curtains positioned immediately in front of the roller nip point, triggering instant emergency roller stoppage if interrupted.

Emergency Stop Switches: Must meet or exceed bi-lateral, easily reachable emergency stop pushbuttons located on both front and rear operator stations.

Hands-Free Foot Control: Must meet or exceed an industrial shielded electric foot pedal switch for incremental jogging, setup, and board alignment.

Electrical & Safety Standards: Must meet or exceed full compliance with UL, ETL, or CE industrial electrical machinery safety standards.

2.6 Physical & Power Requirements

Electrical Service: Must meet or exceed compatibility with standard 208–230 VAC

(±10%), single-phase, 50/60 Hz, rated 30A–35A service.

Chassis Construction: Must meet or exceed heavy-duty welded steel construction equipped with heavy-duty mobility casters and threaded leveling pads.

3. WARRANTY & MAINTENANCE REQUIREMENTS

3.1 Base Manufacturer Warranty

The equipment must include a factory baseline warranty that must meet or exceed the following coverage parameters:

Parts Coverage: Must meet or exceed two (2) years of coverage for all mechanical, electrical, and electronic parts against defects in materials or workmanship.

Roller Defect Coverage: Must meet or exceed one (1) year of coverage for silicone/rubber laminating rollers against manufacturer defects (e.g., core bonding failure, delamination, casting flaws).

Labor Coverage: Must meet or exceed one (1) year of fully covered factory-certified on-site labor for all warranty repairs.

3.2 3-Year Extended Maintenance Agreement (EMA) - Without Roller

Protection

In addition to the base manufacturer warranty, the contractor must supply a dedicated 3-Year On-

Site Extended Maintenance Agreement (EMA) commencing upon government/buyer acceptance of the equipment. All terms must meet or exceed the following service levels:

Term: Must meet or exceed thirty-six (36) consecutive months of comprehensive service coverage.

Component Coverage: Must meet or exceed 100% parts, labor, travel, and diagnostic coverage for all mechanical drive systems, motors, electronics, logic boards, heating elements, power supplies, optical safety eyes, and tensioning brakes.

Roller Exclusion (Without Roller Protection): In accordance with procurement specifications, physical damage to laminator rollers caused by external factors (including utility knife cuts, razor blade scoring, puncture marks, or abrasive/improper chemical cleanings) is explicitly excluded from free replacement coverage under this EMA.

Preventive Maintenance (PM): Must meet or exceed one (1) scheduled comprehensive on-site PM visit per year (minimum 3 visits total over the agreement term) to clean, align, lubricate, test safety interlocks, verify temperature accuracy, and calibrate nip parallelism.

Response Times:

Must meet or exceed a toll-free technical phone support response time within four

(4) business hours of notification.

Must meet or exceed an on-site technician arrival time within two (2) business days

(48 hours) for unresolved hardware faults.

4. SCHEDULE OF DELIVERABLES

All deliverables listed below must meet or exceed the stated functional requirements and performance standards:

Line

Item Description Quantity Specifications / Standard

Wide-Format Production Roll

Laminator (61"), Fully Loaded

Configuration with In-Feed Table, Out-Feed Slitters, and Multi-Fan

Cooling Array

1 EA

Must meet or exceed all baseline physical, thermal, mechanical, and productivity salient characteristics

Baseline Manufacturer Warranty

Package

1 EA

Must meet or exceed 2-year parts, 1-year roller defect, and

1-year labor coverage

Inside Delivery, Rigging, Assembly, Leveling, and Factory Calibration 1 Job

Must meet or exceed turnkey delivery to operational state on the facility production floor

Line

Item Description Quantity Specifications / Standard

Comprehensive On-Site Operator &

Technical Staff Training 1 Job

Must meet or exceed a minimum of 4 hours of hands-on instruction for designated operators

3-Year Extended Maintenance

Agreement (EMA) – Without Roller

Protection

3 YR

Must meet or exceed 36 months of full parts, labor, travel, and annual PM visits

(excluding scored/cut rollers)

Turnkey De-installation, Rigging, Removal, and Eco-Friendly Disposal of Legacy Laminator

1 Job

Must meet or exceed all environmental compliance standards; provide formal

Certificate of Disposal

5. SCOPE OF SERVICES

All services rendered under this contract must meet or exceed industrial best practices and the following operational standards:

5.1 Inside Delivery & Turnkey Installation

1. Advance Coordination: Contractor must coordinate with the facility representative at least five (5) business days prior to scheduled delivery. Delivery must meet or exceed inside delivery via liftgate truck directly to the designated reprographics floor.

2. Uncrating & Assembly: The contractor must uncrate the unit, install all fully loaded components (easy in-feed table, out-feed slitters, cooling fan array, and rear controls), level the unit, and connect to facility single-phase power.

3. Debris Removal: All packaging materials (wood crates, plastic wrap, metal banding, pallets, foam) must be 100% removed and cleared from the site on the day of delivery.

4. Calibration & Operational Verification: The technician must meet or exceed full operational verification prior to sign-off, including checking parallel nip closure across the

61-inch width, verifying dual temperature accuracy using digital surface pyrometers, verifying emergency stops/light curtains, and running test laminations on both thermal film and cold mounting boards.

5.2 Operator & Staff Training

Immediately following installation, a certified technician shall conduct on-site, hands-on training that must meet or exceed four (4) hours of comprehensive instruction for up to six (6) operators:

Web Setup & Threading: Complete thread-up procedures for single-sided cold lamination, double-sided thermal encapsulation, and release liner management.

Core Finishing Applications: Parameter configuration and techniques for leadership portraiture, chain of command panels, organizational emblems, rigid sign mounting (up to

1.5" thickness), and banner runs.

Accessory Operation: Setup and maintenance of the easy in-feed table, rotary blade spacing on out-feed slitters, and multi-fan cooling array adjustment.

Routine Maintenance & Care: Daily roller cleaning protocols (using approved non-abrasive cleaners) to avoid roller damage, optical eye care, and basic troubleshooting.

5.3 De-Installation and Certified Disposal of Legacy Unit

1. De-Installation & Extraction: Contractor must safely disconnect, de-energize, and rig the existing legacy wide-format laminator out of the facility without causing structural or property damage.

2. Environmentally Compliant Disposal: The legacy unit must be transported off-site and recycled/disposed of in a manner that must meet or exceed all applicable federal, state, and local e-waste and scrap metal regulations.

3. Documentation: A formal Certificate of Destruction/Disposal must be delivered to the contracting officer within thirty (30) calendar days following removal.

6. PROPOSAL SUBMISSION & EVALUATION CRITERIA

Offerors submitting proposals must demonstrate that their proposed equipment and services meet or exceed all stated requirements by submitting:

1. Specification Sheet & Compliance Cross-Reference: Point-by-point verification demonstrating that the proposed system will meet or exceed working width (≥61"), nip opening (≥1.5"), dual heated rollers (≥284°F), and line speed (≥20 ft/min).

2. Fully Loaded Configuration Verification: Documentation demonstrating that the offer meets or exceeds all requirements for the easy in-feed table, out-feed slitters, multi-fan cooling array, rear nip controls, and auxiliary auto-grip shaft.

3. Warranty & 3-Year EMA Documentation: Formal written confirmation proving the offer meets or exceeds the 2-year parts, 1-year roller defect, and 1-year labor manufacturer warranty, alongside the complete terms of the 3-Year On-Site EMA (confirming roller cut exclusion and response times).

4. Technician Certification: Proof of factory certification for all personnel performing delivery, installation, training, and warranty/EMA maintenance.

File details come from the government source that posted it. Updated .