SafetyReview HIMARS Hydraulic Test Equipment.pdf

PDF 210 KB Posted

Attached to
Testek Test Station Services Federal contract opportunity
Solicitation number
W911N223Q0008
Issued by
Department of the Army Materiel Command Contracting Command Redstone Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Testek Test Station Services, newest first.
File Type Posted
SOL W911N223Q0008.pdf PDF
JA TESTEK Final KO SIGNED II.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

LETTERKENNY ARMY DEPOT

1 OVERCASH AVENUE

CHAMBERSBURG, PENNSYLVANIA 17201-4150

AMLD-SAF June 15, 2022

MEMORANDUM FOR: DIO/ HIMARS

ATTN: Erin Robinson, Industrial Engineering Technician

SUBJECT: Safety Office review of Testek, Hydraulic Test Equipment Service Support Contract

1. Purpose: To document the LEAD Safety Office’s review of the subject contract. Note this MFR may be applied to any delivery order associated with the subject Contract.

2. The following information shall be added to the PWS of the Contract. If there is no PD/ PWS for the contract, or the PWS has already been approved, the contractor shall be notified of these items.

a. The contractor is reminded that LEAD maintains a Safety Management System

(SMS) and is ISO 45001 certified.

b. LEAD’s safety policy and safety program (LEAD-R 385-1) can be requested at usarmy.letterkenny.usamc.list.lead-safety-office@army.mil

c. All on site work at LEAD shall be completed in accordance with applicable OSHA, DoD, DOT, Army, and LEAD Safety requirements. As a federal installation, additional requirements other than OSHA apply to contractors performing work at LEAD.

Examples include full conformance to all applicable NFPA standards, ANSI standards, and other consensus standards for the industry covered by the subject contract. It is the responsibility of the contractor to be familiar with all applicable standards prior to starting work. Additionally, the contractor shall make themselves familiar with and comply with LEAD's local safety regulation LEAD-R 385-1 prior to the start of any work at LEAD.

d. If contractor personnel determine a procedure is unsafe, they shall discontinue work immediately and contact their Program Manager who shall notify safety personnel and the COR. As soon as LEAD Safety Office personnel determine that the unsafe conditions have been corrected, the COR will notify the contractor Program Manager that personnel may resume work.

e. Additionally, all contractor supervisors and employees shall read and be knowledgeable of the governing SOP(s) prior to signing the SOP(s) and starting the operation.

f. All contractor personnel shall wear the appropriate PPE when in the following work areas: industrial buildings, at construction sites, test sites and test facilities. Failure to wear/use PPE may cause removal from the job site and/or seizure of non-compliant equipment/items.

mailto:usarmy.letterkenny.usamc.list.lead-safety-office@army.mil

AMLD-SAF

SUBJECT: Safety Office review of Testek Hydraulic Test Equipment Service Support Contract

g. The contractor shall comply with reporting requirements of 29 CFR Part 1904, AR 385- 40 and APGR 385-4, and shall report accidents resulting in injury or death and accidents resulting in damage to Government property, supplies, and equipment to the COR promptly of the occurrence

h. In case of an injury/accident, the contractor shall complete a safety investigation report of injury/accident and submit it to the COR Office with a copy to the LEAD Safety Office.

i. All shipped material shall include a current product Safety Data Sheet (SDS) for any chemical products being shipped other than residue. This includes items like engine oil.

j. All safety messages or recalls related to the safe use of products produced by the contractor will be provided to the COR for the Contract within 5 days of contractor’s awareness of the message or notice.

k. It is the contractor’s responsibility to be familiar with these documents and to comply with their contents.

3. If the requirements of this contract change, the proponent of the contract must submit all changes to the LEAD Safety Office for review.

4. The POC for this memo is Osvaldo Alomar, Safety Engineer, Letterkenny Army Depot.

717-267-5319.

OSVALDO ALOMAR

Safety Engineer Letterkenny Army Depot

2022-06-15T08:29:08-0400
ALOMAR.OSVALDO.1571039989

File details come from the government source that posted it. Updated .