Saco FMS #1 Snow Removal 10_29_24.pdf

PDF 945 KB Posted

Attached to
FMS#1 Saco Snow Plowing & Sanding
Solicitation number
RFQ - 15A - 25091500000000000058
Issued by
York County, Maine

About this file

This document is a Snow Removal Plan for the Military Bureau Facilities Engineering Vehicle Maintenance Shop National Guard located in Saco, Maine. The plan details the snow removal requirements for the Dawn Marie Drive Scarborough Saco facility, which includes multiple surface areas: 5,602 square yards of pavement, 474 square yards of compound pavement, 1,725 square yards designated as a snow stockpile area, 9,514 square yards of gravel, and an additional 5,632 square yards of compound-gravel surface. The document appears to be a draft technical drawing at the 35% review stage, with subsequent review stages noted (60%, 95%, final), and is prepared for potential bidding and construction purposes.

The technical drawing includes a color-coded site plan with a scale of 1" = 50', showing the various surface areas and their intended snow removal strategy. The plan is specifically for the Directorate Military Bureau Facilities Engineering Vehicle Maintenance Shop National Guard, with a project identification number of 230125. The drawing includes a legend indicating different surface types and colors, and provides a comprehensive overhead view of the facility's layout, highlighting the areas that will require snow removal services. The document is marked as a draft and appears to be in the early stages of review and preparation for potential snow removal contract solicitation.

View the file

Other files

File Type Posted
rfq250915-0058.docx DOCX document
Saco FMS #1 Snow Removal 10_29_24.pdf.crdownload CRDOWNLOAD file
bid sheet FMS#1 Saco snow plow.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Daw n M ar ie

Driv e

ScarboroughSaco

FMS #1

PAVEMENT - 5,602 SQ. YRDS.

COMPOUND PAVEMENT - 474 SQ. YRDS.

SNOW STOCK PILE - 1,725 SQ. YRDS.

GRAVEL - 9,514 SQ. YRDS.

SNOW REMOVAL LEGEND

D

I RECTORATE

M

I L ITARY BUREA

U

FA

C

IL

IT

IES ENGINEER

ING

VE

H

IC

LE

M

AI

N

TE

N

AN

C E

SH

O

P N

AT

IO

N

AL

G U

AR

D

DRAFT

35% REVIEW

60% REVIEW

95% REVIEW

FINAL REVIEW

FOR BIDDING

ISSUED FOR CONSTRUCTION

RECORD DRAWINGS

SA

C

O , M

AI

N

E

IS

SU

ED

F O

R A

PP

R

O

VA

L

-2 9-

D es cr ip tio n

Ap pr

D at e

R ev

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

D

AT

E:

SC

AL

E:

C H

EC

KE

D B

Y:

SHEET ID:

SN

O

W R

EM

O

VA

L

PL

AN

SNOW

1"

0'

COMPOUND - GRAVEL - 5,632 SQ. YRDS.

AutoCAD SHX Text 1 inch = ft.

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

DEPARTMENT OF DEFENSE, VETERANS

AutoCAD SHX Text

STATE OF MAINE

AutoCAD SHX Text

AND EMERGENCY MANAGEMENT

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text Description

AutoCAD SHX Text Appr.

AutoCAD SHX Text Date

AutoCAD SHX Text Rev#

AutoCAD SHX Text

PLAN REVISIONS

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

SHEET ID:

AutoCAD SHX Text

%%UPLAN PROGRESS

AutoCAD SHX Text

DFE PROJECT NO:

Sheets and Views
Draft

File details come from the government source that posted it. Updated .