This document is an Addendum to the contract documents for the SAC 30634 Temporary Ground Boarding Walkways project at the Savannah Hilton Head International Airport. The project involves constructing temporary ground boarding enclosures to support six ground boarding gate operations during the airport's terminal concourse expansion. The addendum provides updates to the pre-bid conference agenda, minutes, and attendance record, as well as changes to the electrical drawings. The project is to be completed in multiple phases over 178 calendar days, with liquidated damages of $1,000 to $2,000 per calendar day if the phases are not completed on time. Bidders must acknowledge receipt of the addendum, and bids are due on April 2, 2024, at 1:30 PM EST. The project is non-federally funded, with a 1.37% DBE goal, and the Davis-Bacon Act applies.
The addendum also provides details on safety and security requirements, site access and staging, foreign object debris control, and bid proposal requirements, including the need for a bid bond, payment and performance bonds, and compliance with state and local contractor registration and tax requirements. The project engineer is AECOM, and the contact for the Savannah Airport Commission is Jim Aiello, Assistant Director of Engineering.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAC 30634 Addendum No_ 2 .pdf | ||
| SAC 30634 Addendum No_ 3.pdf | ||
| SAC 30634 Temp Ground Boarding Notice To Bidd.pdf | ||
| SAC 30634 Addendum No_ 4 .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TO: All Plan Holders
Dodge Data & Analytics
Construction Market Data Group
ISQFT
Savannah Entrepreneurial Center
Construction Journal
FROM: Jim Aiello
Assistant Director of Engineering
DATE: March 15, 2024
SUBJ: SAC 30634
Temporary Ground Boarding Walkways
Savannah Airport Commission
Attached please find Addendum No. 1 to the contract documents. All bidders shall acknowledge the receipt of Addendum No. 1 in the place provided in the bid proposal.
CM
ENCL: SAC 30634 – Addendum No. 1
CC: Engineering Files
SAC 30634 ADDENDUM NO. 1 A.1-1
SAVANNAH AIRPORT COMMISSION
SAC 30634
Temporary Ground Boarding Walkways
Addendum No. 1
The following amendments, additions, deletions shall be made to the contract documents. In so far as these documents are at variance with this Addendum No. 1 dated March 15th, 2024, the addendum shall govern:
Pre-Bid Conference Agenda, Minutes, and Record of Attendance
Changes to Drawings –Updated sheets E0.01 and E1.00
SAC 30634 ADDENDUM NO. 1 A.1-2
SAC 30634 TEMPORARY GROUND BOARDING WALKWAYS
PRE-BID CONFERENCE AGENDA, MINUTES, & RECORD OF ATTENDANCE
MARCH 12, 2024 – 10 AM EST
I. SIGN-IN SHEET
All attendees were instructed to sign-in for the meeting.
II. INTRODUCTIONS
Jim Aiello, Assistant Director of Engineering, began the meeting and asked all attendees to introduce themselves.
Airport Points of Contact
a. Jim Aiello, E.I.T., Assistant Director of Engineering, jaiello@flySAV.com
b. Crystal Mercado, Engineering Administrator cmercado@flySAV.com
Design Engineer - AECOM
III. SCOPE OF WORK
a. Major Work Elements
Steve Henriquez, P.E., AECOM, the Engineer of Record, described the scope of work and phasing plan.
The Savannah Hilton Head International Airport will be expanding the Terminal
Concourse and plans to remain operational. Ground boarding walkways are to be installed to support six ground boarding gate operations as the terminal concourse expansion is under construction.
A concept used from the Asheville airport has been provided to show an acceptable type of walkway.
Contractor is allowed to submit a different concept for review and approval during the bid phase. If a different concept is not submitted, then the Contractor must bid per the plans and specifications.
Walkways must be engineered for wind loads per the specifications.
Contractor will be responsible for permitting.
Contractor will be responsible for the calculations of the scaffolding system/truss system.
Two potable water cabinets will be installed as shown on the plans.
mailto:jaiello@flySAV.com mailto:cmercado@flySAV.com
SAC 30634 ADDENDUM NO. 1 A.1-3
a. Contract Time/Phasing – 178 Calendar Days:
COLUMN I COLUMN II
Total Calendar Days
Allowed After Notice-to-Proceed
Liquidated Damages per Calendar Day if Not
Completed by Calendar Days Shown in
Column I
Phase 1 60 $1000
Phase 2 150 $1000
Phase 2A 150 $1000
Phase 3 28* $1000
Entire Project 178 $2000
*Once project is re-started, 28 days before the Terminal Concourse Expansion Project is completed.
Work on this contract will be carried out in multiple phases as defined in the phasing plan. The Contractor shall prepare and submit a detailed schedule of proposed activities for review and approval, a minimum of 2 weeks in advance of the Contractor beginning any phase of work. The proposed phasing may be modified by the Airport due to flight operations.
Phase 1 includes mobilization, provide drawings for approval, then drawings are sent to the City of Savannah for permitting. Phase 1 can be extended if there is an unforeseen delay in the permitting process.
Once permits are received, then Phase 2 can begin. Phase 2 will consist of the construction of the lighted walkways.
Phase 2A will need to begin immediately to remark the ramp associated with the new ground boarding gate positions. This phase is to be completed within 10 days.
When the walkways are operationally accepted, contract time will be stopped.
Time will be stopped approximately 2 years to allow for completion of the concourse expansion. If the concourse expansion is not completed after 2 years, then the rental of the walkways will be paid based on a monthly basis.
After substantial completion of the Terminal Concourse Expansion project, then
Phase 3 will begin which will be the demolition of the walkways. The demolition is to be completed in 2 phases. The first phase will be the south side, then the second phase will be the north side of the walkways.
Lighted Low-Profile barricades are required and will be provided by the Airport.
Contractor must maintain an automated mechanical sweeper to ensure that all debris is swept clean of the active taxiway pavement at all times.
IV. SAFETY/SECURITY
a. Badging – Work will be in the Airport Operations Area (AOA). All personnel will need to be badged.
b. Site Access/Staging Area Location – Site Access will be through Gate 19 located on Daniel J. Coe Dr. The Staging Area will be in the grass area to the
SAC 30634 ADDENDUM NO. 1 A.1-4
west of Taxiway G. Location is marked in the plans. All material deliveries will be confined to the Contractor’s Staging Area.
c. Part 139 Safety and Airfield Security – The Contractor will comply with all
Airport Security requirements. Work site/staging area/ and site access will be near active taxiways/runways. Contractor must use extreme caution to enter the Movement Area. Escorting will be required. Gate 19 will need to be secured at all times.
d. Foreign Object Debris (FOD) Control – Work site must be clean and free of debris at all times. No exceptions. Work will be occurring during
Hurricane/Extreme Weather season. Contractor must ensure materials are properly tied down and do not become projectiles.
V. DBE PARTICIPATION - 1.37% DBE Goal
a. This is a non-federally funded Contract. DBE Participation is not federally required but still expected.
b. DBE subcontractors must be Georgia UCP certified. A directory of UCP certified DBEs can be found on GDOT’s website.
c. If the goal cannot be met, the proposer must submit a Good Faith Efforts statement with the bid proposal.
VI. BID PROPOSAL/GENERAL ITEMS
a. General Requirements - One copy w/original signatures and corporate seals
b. Addenda: Must Acknowledgement Receipt of all. The last addendum will be issued by March 26th, 2024, at 3 PM EST.
c. Deadline for Questions: March 19th, 2024, at 3 PM EST. ALL questions must be in writing sent via email to Crystal Mercado, Engineering
Administrator, cmercado@flysav.com
d. Bids must be delivered or mailed to the Savannah Airport Commission, 400
Airways Avenue, Savannah, GA 31408. Office Hours are from 9 AM to 5 PM.
SAC is not responsible for delivery issues.
e. Bids: Due April 2nd, 2024, at 1:30 PM EST. Bids must be time and date stamped by the Savannah Airport Commission prior to 1:30 PM. Late bids will be considered non-responsive.
f. Must be a plan holder to automatically receive additional addenda.
g. Insurance Requirements can be found in the Supplementary General Conditions.
h. Out-of-State contractors must have a Georgia State Tax Registration ID#
i. Out of state contractors must be registered with the Secretary of State to do business in the state of Georgia.
j. Include EEV form I-2(a) (successful bidder)
k. Bid Bond is required. Please use form included in the specifications.
l. Payment and Performance Bonds will be required.
m. Davis-Bacon Act Applies – Wage Rates are included in Plans/Specifications.
Certified Payrolls will be required to be submitted.
mailto:cmercado@flysav.com
SAC 30634 ADDENDUM NO. 1 A.1-5
VII. QUESTIONS/ANSWERS
No questions were asked during the pre-bid.
Attendees were offered a site visit. Attendees declined.
VIII. ADJOURN
CFM56-5BCFM56-5B
A321-200
A321-200
LEAP-1BLEAP-1B
737 MAX 8
737 MAX 8
E E
DMH DMH DMH
DMH
DMH
DMHDMHDMH
DMH
SMH
SMH
DMH
SMH
MD88
A220
A321 E190
A220
MD88 717
E35 E45
CRJ 2/7/9
737-7/8/9
E70/75/7 5W
90/95
319 320 3
737-700/MAX7
737-800/MAX8
A319
A320 A220
B737 E175
B738
B752 MD88
CRJ7 B717
CRJ9 E145
B739 A321
B739 A321
CRJ E145
DC95 B717
B752 MD88 B738
E175 B737 A320 A220
A319
76-4
E175 RJ
B379 A321
B378 CRJ ERJ
E190
E170/5
B737 A320
A319
73-8 73-9
CR2 CR7 CR9
MD80 ERJ
73-7
E170 E175 E190
A319 A320 A321
MD80 ERJ
73-8 73-9
CR2 CR7 CR9
73-7
E170 E175 E190
A319 A320 A321
B739 A321 M D80
A220 E190/195
B738 CRJ ERJ
BLANK
E170/5
B737 A320
A319
C
FM
-5
B
C
FM
-5
B
A -2
A3 21-
CFM56
-5B
CFM56
-5B
A 321-200
A321-200
CFM56-5B
A321-200
LEAP-1B LEAP-1B
7 M
AX
7 M
AX 8
LEAP-1B LEAP-1B
7 M
AX
7 M
AX 8
LEAP-1B LEAP-1B
7 M
AX
7 M
AX 8
LEAP-1B
LEAP-1B
M
AX
MAX 8
CFM56-5BCFM56-5B
A321-200
A321-200
LEAP-1BLEAP-1B
737 MAX 8
737 MAX 8
CFM56-5BCFM56-5B
A321-200
A321-200
LEAP-1BLEAP-1B
737 MAX 8
737 MAX 8
LEAP-1B LEAP-1B
7 M
AX
7 M
AX 8
LEAP-1B LEAP-1B
7 M
AX
7 M
AX 8
18 20
17 19
V2
V2
A320-200
A -2
SD
SMHSMH
SD
SMH
W
DMH
DMH
DMH
DMH
B
C R J9
EE
E
E
FC
FC
E E
NO.6
TO REMAIN
480V FEEDER
EXISTING
WALKWAY. SEE E1.00
NORTH TEMPORARY
WALKWAY. SEE E1.00
SOUTH TEMPORARY
FUTURE ADDITION
NOTE D2
EXISTING 150A FUSED SWITCH TO REMAIN. NOTE D1
EXISTING 100A FUSED SWITCH TO REMAIN. NOTES D1 AND 1
NOTE 3
NOTE 4
NOTE 3
EXISTING PANEL L1GC
PANEL
USAIR
EXISTING
NOTE 4
PANEL TW
TO
NOTE 5
TO PANEL TW
NOTE 5
1 NO.8(G)
1•"C W/ 4 NO.2,
FLOOR MTD
3PH
480V-208/120V
T-W-30KVA
1 NO.10(G)
1‚"C W/ 3 NO.6,
NOTE A, B
GATEWAY.
GATE 15
SWITCH FOR
200A FUSED
EXISTING
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
PROJECT NO.
PM:DATE DESCRIPTION BY AUTH
DRAWING SIZE REDUCED IF LESS THAN 34"x22"
Tel: 813.286.1711
Tampa, FL 33607-1462
7650 W. Courtney Campbell Causeway
AECOM Technical Services, Inc.
DATE:
AS NOTED
DWG. BY:
CHK. BY:
DSG. BY:
SGH
SHEET TITLE SHEET NO.
GROUND BOARDING
TERMINAL CONCOURSE TEMPORARY
Savannah, Georgia 31408
400 Airways Avenue
International Airport
Savannah / Hilton Head
60723003
C A
D
P L
O T s s w a n g e r
:0
M A
R
E:\Savannah Airport Concourse Expansion Temp Walkway - 24001.00\CADD\E0.01.dgn
ENGINEER
PE NUMBER FEBRUARY, 2024
ISSUED FOR BID02/24
E0.01
LC
PM
PM
AND SPECIFICATIONS
ELECTRICAL LEGEND, GENERAL NOTES
LEGEND
WP
GF
20A
WP
GENERAL NOTES AND SPECIFICATIONS
PC
NORTH
E0.01 SCALE: 1" = 60'-0"
OVERALL ELECTRICAL SITE PLAN
60' 30' 0' 60' 120'
GRAPHIC SCALE: 1" = 60'-0"
E0.01 SCALE: SCHEMATIC ONLY
PARTIAL ONE-LINE DIAGRAM
NOTES:
J
PWC
NOTES:
DEMOLITION NOTES:
PWC
PWC
PWC
J
USAIR (20/1)
USAIR (15/2)
P-1
J
(15/2)
L1GC-26
P-1
(20/1)
L1GC-24 NOTE 2
NOTE 2
TRACE ON EXISTING PIPES.
DISCONNECT POWER TO EXISTING POTABLE WATER CABINET AND HEAT D2.
REMAIN.
REMOVE SERVICES TO GATEWAY 15. DISCONNECT SWITCHES TO D1.
C
PM PM
SEE SCHEDULE
PANEL TW
50A (NOTE B)
REPLACE 3 - 100A FUSES WITH 3 - 50A FUSES.B.
WALKWAY SHOWN.
REMOVE SERVICE TO GATEWAY 15 AND USE SWITCH FOR TEMPORARY A.
ENTIRE LENGTH.
G15. WHERE CONDUCTOR SIZE IS SHOWN, MAINTAIN CONDUCTOR SIZE FOR
MUST BE SUBMITTED 10 DAYS PRIOR TO BID.
G14. FOR LIGHTING SUBSTITUTIONS, POINT BY POINT CALCULATIONS
CONNECTS AS REQUIRED. CONNECT TO CIRCUIT SHOWN.
PLUMBING DRAWINGS. HEAT TRACE IS RATED 8W/FT. MAKE ALL
G13. CONNECT TO HEAT TRACE ON EXPOSED WATER PIPING AS SHOWN ON
15A/2P CIRCUIT AND CONNECT. VERIFY EXACT LOCATION IN FIELD.
HEATER, • HP PUMP AND CONVENIENCE RECEPTACLE. EXTEND
G12. POTABLE WATER CABINETS INCLUDE A FUSED DISCONNECT, A 1500W
THEY PENETRATE WALLS.
G11. WHERE CABLES ARE SHOWN FOR CIRCUITS, PROVIDE SLEEVES WHERE
TRIPPING HAZARDS.
BUNDLE NEAR FENCE OR OTHER OBSTRUCTION TO ELIMINATE
G10. WHERE CABLES EXTEND ALONG PAVEMENT, GROUP TOGETHER AND
SUPPORT ALL CONDUITS AND CABLES PER CODE.G9.
PROVIDE CORDS SHOWN FOR TEMPORARY POWER CIRCUITS.G8.
CABLES.
PROVIDE EQUIPMENT GORUNDING CONCUCTOR IN ALL RACEWAYS AND G7.
DRILL STRUCTURE, USE 'C' OR 'U' CLAMPS ONLY.
SUPPORT EQUIPMENT TO TEMPORARY WALKWAY STRUCTURE. DO NOT G6.
ALL CONDUITS TO BE EMT.G5.
TO MATCH EXISTING.
ALL WIRING IN CONDUIT TO BE COPPER TYPE THWN. COLOR CODE G4.
COORDINATE ACCESS AND SECURITY REQUIREMENTS WITH OWNER.G3.
CONDITIONS.
COORDINATE ALL WORK WITH OTHER TRADES AND EXISTING G2.
ALL WORK SHALL CONFORM TO 2020 NEC WITH GEORGIA AMENDMENTS.G1.
PROVIDE YELLOW CHANNEL CABLE COVERS.
TO FENCING. WHERE CABLES ARE LOCATED IN WALKWAY PATHS,
ROUTE BRANCH CIRCUITS SERVING WALKWAYS ON GROUND ADJACENT 5.
CONNECT AS REQUIRED.
CIRCUIT SHOWN. EXTEND 2C NO.12, W/ GND TYPE SO CORD AND
CONNECT TO HEAT TAPE (APPROXIMATELY 60 FT) FROM 20A/1P 4.
NO.12 W/ GND TYPE SO CORD TO CABINET.
MOUNT 30A/2P/3R/NF DISCONNECT ON ADJACENT WALL AND EXTEND 3C
CONNECT TO POTABLE WATER CABINET FROM 15A/2P CIRCUIT SHOWN.3.
DIRECTORIES. VERIFY PANEL LOCATIONS IN FIELD.
OF EXISTING PANELS. BREAKERS TO MATCH EXISTING. UPDATE
PROVIDE 1 - 15A/2P AND 1 - 20A/1P BREAKER IN EXISTING SPACES 2.
ADJACENT TO FUSED SWITCHES.
TEMPORARY WALKWAYS. SEE 2/E0.01. LOCATE T-TW AND PANEL W
EXISTING 100A FUSED SWITCH TO BE USED TO PROVIDE POWER FOR 1.
DISCONNECT SWITCH
POTABLE WATER CABINET. SEE NOTE G12.
JUNCTION BOX
OR EQUAL.
PHOTO-CELL 1800 VA - 120V ADJUSTABLE. INTERMATIC K4000
POSITION TO PHOTOCELL.
KEY SWITCH IN COVER. NEMA 3R RATED. CONNECT AUTO
LIGHTING CONTACTOR RATED 2 POLE - 30A EOEH WITH HOA
48" AFG. LEVITON R52-OCSBI OR EQUAL.
SWITCH IN CAST BOX WITH LOCKABLE METAL WP IN-USE COVER,
OR EQUAL.
METAL LOCKABLE IN-USE COVER. 18" AFG. LEGRAND 2097I
DUPLEX 20A GROUND FAULT RECEPTACLE IN CAST BOX WITH
OR EQUAL. TILT FIXTURES 15 DEG.
FLOODLIGHT - MCGRAW EDISON GALN-SA8C740UT3-GRSBK-ADJ
EMERGENCY BATTERY PACK - SURELITE SELDWA50SD OR EQUAL.
4VT2-LD5-4-DR-W-UNVL840-CD1WLVT2 OR EQUAL.
LED 4 FT FIXTURE - METALUX
PANELBOARD
EXPOSED CIRCUIT
HOME RUN
PM PM03/24 ADDENDUM NO.11
EEFC
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
PROJECT NO.
PM:DATE DESCRIPTION BY AUTH
DRAWING SIZE REDUCED IF LESS THAN 34"x22"
Tel: 813.286.1711
Tampa, FL 33607-1462
7650 W. Courtney Campbell Causeway
AECOM Technical Services, Inc.
DATE:
AS NOTED
DWG. BY:
CHK. BY:
DSG. BY:
SGH
SHEET TITLE SHEET NO.
GROUND BOARDING
TERMINAL CONCOURSE TEMPORARY
Savannah, Georgia 31408
400 Airways Avenue
International Airport
Savannah / Hilton Head
60723003
C A
P L
O T s s w a n g e r
:0
M A
R
E:\Savannah Airport Concourse Expansion Temp Walkway - 24001.00\CADD\E1.00.dgn
ENGINEER
PE NUMBER FEBRUARY, 2024
ISSUED FOR BID02/24
NOTE 2NOTE 2
NOTE 2
NOTE 4
NOTE 6 NOTE 6
NOTE 6
SHEET E0.01
SEE NOTE 5,
1 NO.8(G)
ƒ"C W/ 2 NO.6, (TYPICAL)
NOTE 5
3C NO.6 SO - NOTE 7
3C NO.6 SO
3C NO.6 SO 3C NO.6 SO
NOTE 3 (TYPICAL)
NORTH
E1.00 SCALE: 1" = 10'-0"
10' 5' 0' 10' 20'
GRAPHIC SCALE: 1" = 10'-0" E1.00
LC
PM
PM
ELECTRICAL PLAN
TEMPORARY WALKWAY
GF
WP
20A
48"
TW-6 SOUTH
TW-5 NORTH
NOTES:
ELECTRICAL PLAN - TEMPORARY WALKWAY
NOTE 1
GF
WP
20A
48"
TW-4 SOUTH
TW-3 NORTH
GF
WP
20A
48"
TW-2 SOUTH
TW-1 NORTH
PC
C
TYPICAL
20 FT ±
TW-10 SOUTH
TW-9 NORTH
PM PM
NOTE 3
TW-8 SOUTH
TW-7 NORTH
CONTACTOR AND THEN TO PANEL SHOWN.
EXTEND CABLES SHOWN STRAPPED TO STRUCTURE. EXTEND THRU 7.
MOUNTING HEIGHT. FINAL AIMING TO BE MADE IN FIELD.
FOUR U-CLAMPS EACH AND MOUNT FLOODLIGHT ON POLE AT 20 FT
ATTACH 20 FT 2" GALVANIZED PIPE TO WALKWAY STRUCTURE WITH 6.
SO CORD.
CONNECT HOT CONDUCTOR TO BATTERY PACK USING 2C NO.12 W/ GND
MOUNT EMERGENCY BATTERY PACK TO PLYWOOD AS HIGH AS POSSIBLE. 5.
AWAY FROM LIGHT SOURCES.
EXTEND FLOOD LIGHTING CIRCUITS THRU CONTACTOR. AIM PHOTOCELL 4.
STRUCTURE. FIXTURES TO BE CONSTANTLY ENERGIZED. DO NOT SWITCH.
20 FT O.C. CONNECT TO CIRCUIT SHOWN. SUPPORT CONDUITS FROM
CHAIN HANG 4 FT FIXTURES FROM WALKWAY STRUCTURE APPROXIMATELY 3.
SHOWN STRAPPED TO STRUCTURE AND THEN TO PANEL SHOWN.
LOCATION IN FIELD. EXTEND TO CIRCUIT SHOWN. EXTEND CABLES
PROVIDE RECEPTACLES SHOWN AT EACH GATE. VERIFY EXACT 2.
EXCEPT FOR CIRCUIT NUMBERS.
PLAN SHOWN IS FOR NORTH WALKWAY. SOUTH WALKWAY IS TYPICAL 1.
PM PMADDENDUM NO.103/24
| SAC 30634 Addendum No. 1 |
| SAC 30634 Pre-Bid ROA |
| E0.01 |
| E0.01 |
| References |
| BDR, BORDER.dgn |
| SCRBGND, XREF-SAV-GNDBRD-BASE.dwg, Model |
| E1.00 |
| E1.00 |
| References |
| SCRBGND-NORTH 1, XREF-SAV-GNDBRD-BASE.dwg, Model |
| BDR, BORDER.dgn |
| SCRBGND-NORTH 2, XREF-SAV-GNDBRD-BASE.dwg, Model |
| SCRBGND-NORTH 3, XREF-SAV-GNDBRD-BASE.dwg, Model |
File details come from the government source that posted it. Updated .