This statement of work describes requirements for an alarmed protected distribution system for Tinker Air Force Base. The system must include a 2-port singlemode interceptor, fiber optic loopback module, fiber optic cables, 450 feet of rigid conduit, and 500 feet of fiber optic cable bundle to be installed in building 9001. The contractor will deliver, install, and perform verification testing of the system. Additional requirements include 24/7 monitoring, elimination of daily inspections, filtering to prevent false alarms, rapid deployment capabilities, and automatic configuration. The contractor must be certified by the original equipment manufacturer and comply with all safety and environmental regulations.
The related solicitation seeks quotes for the alarmed protected distribution system described in the statement of work. The opportunity is set aside for small businesses only, with large businesses ineligible to compete. Quotes must address all line items listed in the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
For
Alarmed Protected Distribution System
S24-004
PREPARED BY: OBCA
OC-ALC/OBCA
10/26/2023
PREAMBLE
Commander’s Safety Intent
The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each Contractor and Government employee.
1. SCOPE
1 SCOPE. This Statement of Work (SOW) defines the effort required for the purchase of one (1) Alarmed Protected Distribution System to include delivery, installation and performance verification, in Building 9001, Post K-47 at Tinker Air Force Base OK.
2. BACKGROUND
The interceptor is the main brain of the system. This software runs on a server that communicates with the interceptor. That is where you set all the tolerances and alarm points for the PDS. The interceptor is also what interfaces with the Vindicator (IDS).
The fiber is run through the conduit path and then looped back to the interceptor.
Depending on the sensitivity that is set on the PDS a simple vibration could alarm or someone actually trying to get into the conduit will alarm.
3. REQUIREMENTS
3.1 Item Description – 76 SWEG requesting to purchase one (1) Interceptor Alarmed Protected Distribution System or Equal with the following specifications:
• One (1) 2 Port Singlemode Interceptor.
• One (1) FIS LC Loopback Module.
• One (1) SM 9/125um Fiber, LC-LC Duplex SM (OS2) Fiber Patch Cord 3 Meter.
• 450' of 2" Rigid Conduit.
• 500’ of One (1) 48 Singlemode Fiber Bundle ran in conduit.
• Contractor Alarmed PDS shall have 24/7/365 monitoring of network cables detects tampering within the infrastructure.
• Contractor to supply Alarmed PDS that Eliminates daily inspections required of traditional PDS per Committee on National Security Systems Instruction (CNSSI) 7003.
• Contractor Alarmed PDS shall have Smart-filtering technology eliminates false alarms by learning normal day-to-day activity.
• Contractor Alarmed PDS shall have Plug-and-protect capability allows rapid deployment on new or existing network infrastructure.
• Contractor Alarmed PDS shall have Auto-configuration that eliminates time-consuming manual tuning.
• Contractor shall provide Alarmed PDS with no bandwidth bottlenecks or degradation of network performance.
• Contractor Alarmed PDS shall be able to Interface directly with the existing Vindicator Five (5) Intrusion Detection System (IDS).
• Contractor shall provide installation.
• Contractor shall provide all Original Equipment Manufacturer (OEM) Manuals
• Contractor must meet all requirements outlined in the Statement of Work (SOW).
3.2 Contractor Requirements
• The contractor shall deliver one (1) ) Interceptor Alarmed Protected Distribution System or Equal
• The contractor shall provide Delivery, Install, Performance Verification.
• The Contractor shall make all necessary adjustments to the ( PDS ) until the item is fully operational in accordance with (IAW) the Original Equipment Manufacturer (OEM) specifications and to what is stated in this Statement of Work (SOW).
3.3 Installation – The Contractor shall be responsible for equipment delivery to Building 3001 at Tinker AFB, OK 73145. The Contractor shall be responsible for offloading equipment and moving equipment to installation area (Building 9001, Post K-47). The government shall provide power to the area that the (PDS) will be installed. The Contractor shall ensure the install for the (PDS) is IAW the OEM’s specifications.
3.4 Performance Verification - After installation, the contractor shall demonstrate that the (PDS ) meets or exceeds all OEM specifications and the requirements listed in section
3.1 of this SOW. Contractor shall be present for entirety of acceptance testing.
4. GENERAL REQUIREMENTS
Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, _0600 to 1800. If work hours are required outside the hours stated, the Contractor shall contact the Government POC for approval from the CO. Upon approval from the CO, the Government Subject Matter Expert (SME) or Government POC must be present with the Contractor.
These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.
SPECIAL QUALIFICATION: If applicable
Special Qualifications: Contractor shall be Original Equipment Manufactuer
(OEM) certified.
Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.
Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Instruction (AFI) 32-7086, “Hazardous Materials Management”, Tinker AFB procedures per Tinker Air Force Base Instruction (TAFBI) 32-7004, “Hazardous Waste Management”, and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Sup to AFI 32-7086, “Hazardous Material Management” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”.
Publications are available digitally on e-Publishing website at www.e-publishing.af.mil for downloading or ordering.
Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the GPOC and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:
One (1) copy to CO, two (2) copies to the GPOC, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:
1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.
http://www.e-publishing.af.mil/ http://www.e-publishing.af.mil/
Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this SOW.
Foreign Object Damage (FOD) and Dropped Object Prevention: (SS)
Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP training and to comply with AFI 36-2650, AFMC Supplement 1, paragraph 9.2., and A4.4.4. (Initial)/A4.4.5. (Refresher). The Contractor and Contractor personnel shall acknowledge the FOD/DOP training either by viewing the Digital Versatile Disc (DVD) provided by the Government POC or the YouTube site, http://www.youtube.com/watch?v=tYcbodjFPnM.
The Contract Manager shall provide written certification to the Government POC for each employee within ten (10) business days after the contract award date. The certification shall have the title of the training, the name of the person who received the training, and the date of the training. The Contractor shall also ensure all new employees view the FOD/DOP training and provide written certification of training to the Government POC prior to the employees starting work in the OC-ALC shops.
Every 36 Months, the Contractor and Contractor personnel shall be required to review the FOD/DOP training and to provide written certification to the Government POC.
Privately Owned Motor Vehicles (POV): Contractor personnel shall comply with the directives pertaining to operation of POVs on Tinker AFB per AFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24-302, in its entirety for the operation of POVs within Tinker AFB.
Visitors Pass: The Contractor shall contact the Government POC seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The Government POC will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.
Foreign Nationals: The Contractor shall notify the Government POC before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.
Safety and Health on Government Installations: While performing work under this contract on a Government installation, the Contractor shall comply with federal, state and local regulations, and AFI 91-203, “Air Force Consolidated http://www.youtube.com/watch?v=tYcbodjFPnM
Occupational Safety Instruction”, as established by this contract and Appendix C.
The Contractor shall notify the CO, Government POC, and Government Contract Administrator (CA) within one (1) business day of any injuries that occur to contractor personnel while they are on the installation. The Contractor shall notify the CO, Government POC, and Government CA within one (1) business day of damage to Government property or equipment during the execution of the contract.
Combating Trafficking in Persons: IAW DFARS PGI 222.17, the COR shall pursue, as appropriate, the following methods of monitoring the Contractor’s performance regarding trafficking in persons such that non-compliances with FAR clause 52.222-50 are brought to the immediate attention of the Contracting Officer:
a. Keep the lines of communication open with the Contractor. At the Post-Award conference, remind the Contractor of his contractual responsibilities to notify the government if the Contractor receives notification of any alleged violations to this policy or if actions have been taken against the Contractor employees, subcontractor’s or subcontractor employees pursuant to the clause.
b. When appropriate, encourage Contractor to complete Human Trafficking Awareness Training.
c. Encourage the Contractor to take steps to investigate and eliminate slavery and human trafficking in their supply chains and to publish information for consumer awareness.
d. Periodically access the Department of State’s Trafficking in Person (TIP) website for updates and to view the latest reports. http://www.state.gov/g/tip
Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each contractor and government employee.
Speak up for safety: Safety surety is an integral part of our overall goal of establishing a world class safety and health program. Our “Speak Out for Safety” initiative ensures a partnership with contractors and government employees to further enhance safety to ensure we are looking out for all our partners and empowers all employees to actively participate in each other’s safety.
A safe workplace is everyone's business. As part of the contract team, military, civilian and contractor personnel are empowered to Speak Out for Safety (S.O.S.)
when they observe an unsafe act.
Events that present imminent danger to personnel or catastrophic damage to property we empower our employees to intercede to ensure continued safe operations.
http://www.state.gov/g/tip
Communicating Hazards Of Workplace (CHOW): Contractor’s onsite representative communicates all hazards being introduced to the worksite by the Contractor. This is accomplished prior to commencement of work and refreshed daily during performance, IAW Contractor’s Site Safety Plan.
Safety and Health Plan: The Contractor shall be responsible for compliance with the OSHA Public Law 91-596. The Contractor shall submit a Safety and Health Plan (SHP) and corresponding site safety checklist to the CO and the COR (see Appendix C).
Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.
| 1. SCOPE |